NEGOCIOS DE LATINOAMERICA
Posts 1-1 of 1
-
Ruben Delgado Premium Member Group moderatorThe company name is only visible to registered members.Gold mine in Peru, Iron Ore-Vanadium-Gold mine in Canada for sale
Gold mine in Peru, Iron Ore-Vanadium-Gold mine in Canada for sale
Gold Mine in Peru for sale.
Operational, the Mine started production since ca. 8 years and remain in operation since then.
PAST YIELD SIZE / AMOUNT: From inception to July 31, 2009, the mine produced ca. 400,000 oz. of gold.
• Production is from three ore bodies and several prospects and targets at various stages of exploration.
• In 2008 gold sales total = ca. 74,000 ounces
• 2009 seven months records = 6,266,133 t of ore grading 0.647 g/t gold
• Since then ore production averaging over 25,000 tonnes a day.
EXPECTED MINE LIFE:
• Estimated reserves of 139,113,000 tonnes containing 2,086,000 ounces of gold.
• At the rate of 25,000 tonnes per day the mine should last for 15 years at stable costs and metal prices.
• size of the mine from all concessions: 2500ha
=====
Iron Ore, Vanadium and Gold Mine in Canada for sale
DEVELOPER Unique poly-metallic deposit rich in:
• Iron ore
Historic measured resource of 1.1Bt of open pit mineable ore
• Vanadium
One of the largest resources in N. America, strategic value lift
• Gold
Assays suggest commercial grades of gold
STRATEGIC VALUE Major Development areas with 50+ years of mine life
• Largest compliant vanadium resource in North America (735M lbs) 151 Mt Indicated 76 Mt inferred
• Largest compliant vanadium resource to supply North America which imports 100% of usage
• Ability to extract all three on-site delivers a highly compelling economic mine project similar in scope to the Olympic Dam project in Australia
• Large resource size, multiple value streams make this mine a compelling global mining story
PROJECT COST Looking for first round of external capital to accelerate the development now that exploration risk removed!
• ROI is double or triple investment in first one to two years
• Estimated Value after full production is $750 M+ and sales are estimated to be in the billions
PROJECT DEVELOPMENT PARAMETERS
• Conventional year-round open pit mining, using trucks and shovels
• Simple gravity concentration process after ore drying liberates Fe-rich and V-rich ooids and gold
• Extraction of economic minerals through a custom two-stage process
• Recovery rates expected to be high:
• iron at 60%
• vanadium at 80%
• gold at 90%
• Initial annual production targets of:
• 5 Mt iron
• 77 M lbs vanadium
• 435 K oz gold per year
• Ironstone estimated project CAPEX at $1.1 bn
===//====
- 18 Mar 2011, 02:13 am
