Arvid Boehnke

Arvid Boehnke

Diplom Wirtschaftsingenieur

Senior Project Manager

(The company name is only visible to registered members)

Want to know more about Arvid Boehnke?

All you need to do is sign up for free on XING.

Sign up for free

Personal information

Professional experience (18 years)

  • Aug 2009 - present

    (3 years, 10 months)

  • Oct 2001 - Jul 2009

    (7 years, 10 months)

  • Mar 2000 - Sep 2001

    (1 year, 7 months)

  • May 1998 - Feb 2000

    (1 year, 10 months)

  • Jun 1995 - May 1998

    (3 years)

  • Employment status
    Employee

Educational background

  • Sep 1992 - Apr 1998

About me

CURRICULUM VITAE
 

NAME Boehnke, Arvid
 
DATE OF BIRTH December 03rd, 1969
 
MARITAL STATUS single
 
NATIONALITY German
 

FOREIGN LANGUAGES
 
German mother tongue
English very good
Russian basics
Mandarin basics
 

PRESENT POSITION

Logistik und Management Beratungsgesellschaft mbH - Senior Project Manager -
 
PROFESSIONAL QUALIFICATION

Graduate Engineer (Industrial Engineer)
 

PROFESSIONAL EDUCATION
 
1986 – 1988 Professional Education as construction worker in Dresden Germany Degree /
Diploma: Construction worker
 
1988 – 1990 Military Service
 
1990 – 1992 College in Cottbus Germany Degree: university entrance qualification
 
1992 – 1999 Technical University Cottbus Degree: Diploma: Diplom Engineer (Dipl. Eng. Industrial Engineer)
 
FIELDS OF SPECIAL COMPETENCE
 
• International Codes and Standards (NFPA’s, IBC, UIC)
• Project management, Management consultancy
• Supply chain management,
• Building and traffic logistics,
• Process analysis and organization,
 

PROFESSIONAL ACTIVITIES
 

07/2008 – today
 
Client: New Doha International Airport (NDIA) - Project Manager -
 
Assistance to the Managing Director of NDIA
Head of overall project management for Railway Link to the New Doha International Airport, including performances as follows:
 
• Evaluation of technological options
• Verification of investment and operation costs
• Coordination requirements railway – requirements airport
• Negotiation with Council- and Ministry Authorities
• Tendering planning, soil investigation, construction work
• Project budgeting
• Overall Time/cost scheduling / controlling
 
Projects involved with all special fields of railway (Metro/High Speed/Maglev) and civil works (bored tunnel, underground station box & superstructure), capacity railway station: 10 mio annual passenger; cost: 250 mio. €
 

05/2007 – 07/2008 Client: DB-International GmbH - Project Control Manager (Task force) -
North South Railway Project CTW 100, Kingdom of Saudi Arabia
 
Assistance to the Managing Director Construction North South Railway
Head of planning department for one Section 550 km for of the North-South Railway Project, including performances as follows:
 
• Project budgeting
• Overall Time/cost scheduling / controlling
• Evaluation of technological options
• Team organization
• Interface management
• Development of guidelines for all major processes (time & cost control, quality, reporting execution etc)
 
North South Rail was from Jordanian border town of Haditha up to Ras AZ Zawar Industrial center on the East coast of Saudi Arabia 1.750km.
Project involved with all special fields of railway, (731 km track, 10 sidings), and civil works (19 bridges, 29 camel crossings, 547 culverts etc.), cost: 500 mio. €
 

01/2007 – 05/2007 Client: Fiat Auto Poland - Project Manager -
 
Assistance to the Managing Director Logistics Fiat
Head of Management Consultancy for Implementation World-Class-Manufacturing Logistics at Fiat Plant Tychy (Poland), cost: 13 mio €; including:
 
• Evaluation of technological solution
• Presentation to the board of Fiat
• Re-organization of assembly line (implementation kits and baskets)
• Re-allocation of employees
• Re-structuring of supply chain (implementation CDC park)
• Negotiation with supplier
• Project budgeting
• Overall Time/cost scheduling
 

01/2006 – 01/2007 Client: German Railway DB ProjektBau GmbH - Project Control Manager -
 
Assistance to the Head of overall project management for projects within the area of Berlin
Cost-controlling for the Management of project centre north of DB ProjektBau (20project), guidance and support to enhance the efficiency of commercial output of the projects in terms of cost controlling, reporting to the contractor and the corporate accounting department.
 
Project: “Hamburg - Berlin” Verkehrsprojekte Deutsche Einheit 2; 2 track lines (200 km) modification up 230 km/h, 50 new bridges, modification of signalling and catenary systems, cost: 700 mio. €
 

05/2005 – 12/2005 Client: Airport Berlin Brandenburg International - Project Manager -

Assistance to the Managing Director Construction Work of Airport Berlin Brandenburg International
Project management for planning erecting concrete batching plant, to supply all construction packages with sufficient concrete (quality/quantity wise) total 1.8 mio m3 concrete, cost: 115 mio. €; including performances as follows:
 
• Feasibility study central concrete batching plant
• Evaluation of technological options
• Verification of investment, operation & maintenance costs
• Tendering soil investigation, planning, plant installation
• Overall Time/cost scheduling / controlling
• Coordination erecting
• Interface management
 

01/2005 – 05/2005 Client: Daimler Chrysler - Logistic Manager -
 
Logistic consultancy of Managing Director Logistics Daimler Chrysler Plant Berlin
Development and implementation of Logistics concept for the new V6 engine
 
• Analyzing of current storage situation
• Optimization of storage areas
• Development of storage strategy
• Coordination with head of quality and production
• Implementation
 

01/2003 – 12/2004 Client: German Railway DB ProjektBau GmbH - Project Control Manager -
 
Assistance to the Head of overall project management for projects within the area of Berlin
Cost-controlling for the Management of project centre north of DB ProjektBau (20project), guidance and support to enhance the efficiency of commercial output of the projects in terms of cost controlling, reporting to the contractor and the corporate accounting department.
 
Project: “Berlin Inner Circle””; 4 track lines (76 km) modernisation inside the City of Berlin (passenger/freight), 36 new bridges, 6 tunnels, modification of 7 stations including the modification of signalling and catenaries systems, speed = 160 km/h; cost: 1 bln. €
 

01/2002 – 01/2003 Client: Thyssen Krupp Transrapid (TKTR Maglev) - Manager Logistics Transrapid -
 
Logistics planning, cost Management, scheduling and supervision for installation of Motor winding for Maglev Shanghai, speed = 430 km/h: cost: 1 bln. €, including:
 
• Calculation of work (optimization material consumption)
• Site logistic (planning and supervision installation motor winding)
• Overall Time scheduling / controlling
• Execution of work
• Final costing
 

10/2001 – 01/2002 Client: Planning consortium Maglev Germany - Planning Engineer -
 
Risk analysis for Metrorapid (maglev) in the state of North Rhine Westfalia, Germany
Feasibility study
 

Since10/2001 Consultant, Project Manager (LMBG Logistik und Management Beratungsgesellschaft mbH, Berlin)
 

01/2001 – 09/2001 Branch Manager for Berlin (DREIECK – FEBA – Facility management GmbH, Berlin)
 
• Human Resources
• Budgeting of projects
• Quality and Safety matters
• Implementation of projects
 

1999 – 2001 Supervision of technical/ commercial facility management (CB – Facility GmbH)
 
• Administration
• Human Resources
• Evaluations of projects
• Implementation of projects
• Budgeting of projects
• Overall Time/cost scheduling
 

COURSES / SEMINARS
 
05/2006 Workshop MicroStation
 
10/2005 Workshop eM-plant
 
01/2004 “Granid 5.0” software, workflow system
 
11/2003 Workshop Primavera
 
11/2001 Workshop Management Information System Promis
 

Search the XING network

Find new business contacts on XING and get back in touch with old contacts!