Jack Cnoops

Bis 2013, Interim Manager Asia operations, CIM at Anteryon

Zutendaal, Belgien

Fähigkeiten und Kenntnisse

operational experience in mass manufacturing
production locations in Europe and China (Shanghai
Lean Manufacturing
qualified internal auditor TS16949
Continues improvement & breakthrough management
green field operations
localization of supply base
9.5 years in China
subcontractor as own factories. PC OEM supplier
Process & product re-allocation. Intermediar betw

Werdegang

Berufserfahrung von Jack Cnoops

  • 4 Monate, Nov. 2012 - Feb. 2013

    Interim Manager Asia operations

    CIM at Anteryon

    Support Anteryon outsourced operation in Shenzhen, and report and rive improvements in combination with development at HQ in Eindhoven

  • 3 Monate, Mai 2012 - Juli 2012

    Interim Manager China Expansion

    Brainforce International at Oerlikon Balzars

    manage expansion projects for 2012 (2 new centers and 1 reallocation) for Oerlikon Balzars Coating (Suzhou) Ltd

  • 7 Monate, Jan. 2011 - Juli 2011

    industrial project manager

    Philips Shanghai

    - Transfer the operation from Songzi to the Malu site and integrate it with the existing operation for HID lamps and specialties. - Re-release the Songzi portfolio in the Malu site - Continue with the transfer of the Pont a Mousson Portfolio to the line in Malu.

  • 3 Jahre und 5 Monate, Sep. 2007 - Jan. 2011

    Integral Projectleader & Operations Manager

    Philips Automotive Lighting Hubei

    - Set up and manage Special Lighting operations in the Automotive Lighting plant in Songzi - Organize the technology and key equipment transfer of optical halogen lamps from Pont a Mousson (F) to Songzi (PRC) and use the similar experience and technology from the Automotive production. - Locally purchase remaining equipment and infrastructure (inc. cryogen vessel and piping) - Bottom line responsible for the Songzi Special Lighting Operation - Budget responsible for the reallocation of the optical ha

  • 1 Jahr und 10 Monate, Nov. 2005 - Aug. 2007

    Sub con manager

    Philips Optical Storage Shanghai

    - Manage Day to day, industrial performance of subcontractor. - Guide and support subcontractor to achieve equal performance as in own factory. - Plan and implement line upgrades and capacity expansion at subcontractor. - Assist subcontractor to be PC OEM compliant.

  • 2 Jahre und 10 Monate, Nov. 2004 - Aug. 2007

    Manager project office

    Philips Optical Storage Shanghai

    - Manage Day to day activities of all industrial project managers - Monitoring of the relevant performance indicators per project and step-in in case improvements are not giving the results needed by a) Technical review and assistance b) Allocation of resources c) Source for external support - Provide management with a clear and visible reporting structure on project status. - Setting-up and monitor of all the project budgets for line investment - Ensure that projects are executed effectively me

  • 2 Jahre und 10 Monate, Jan. 2002 - Okt. 2004

    Industrial project manager

    Philips Optical storage Shanghai

    - Ramp up new platform of CD recordable OPU´s (total 6 lines) - Mass production release of molds and give feedback to development for CD recordable OPU´s and actuators - Transfer knowledge to local organization on ramp up, release, improvements - Ramp up (lines and part-tools) and give feedback to development on DVD+RW OPU´s and actuator. Achievements in 2003: 5 lines installed, output from 100 to 24 000 pcs/day Fall off reduced from 35% to 4% Total volume 3.2 million Achievements in 2004: 4 mor

  • 8 Jahre und 8 Monate, Mai 1993 - Dez. 2001

    Production & engineering manager

    Philips Hasselt

    - 50 till 200 operators, 5 supervisors, 3 till 10 engineers. - Main stream 2 shifts, rework in night shift - Professional CD writers (opu, loader, player) Philips, Kodak, Marantz, - Chip on pcb assembly for internal used photo diodes(ESEC equipment, pick and place, dy-bond) - Consumer CD recorder drives (opu, loader) Philips, Kodak, Ricoh, HP, …. - Ramp up from Development till 3 lines 2 shifts (from 0 till 6000 pcs/day) - Transfer Hasselt production equipment and know-how to Subcontractor in Fo

  • 7 Monate, Okt. 1992 - Apr. 1993

    production manager Manual assembly & testing

    Philips HAsselt

    - 70 till 200 operators, 5 supervisors. - 2 shifts down grade till day shift, - Main stream: Kodak and Philips Photo CD, CDi

Ausbildung von Jack Cnoops

  • 3 Jahre und 7 Monate, Jan. 1992 - Juli 1995

    Business management

    PUC Diepenbeek Belgium

  • 3 Jahre und 11 Monate, Aug. 1983 - Juni 1987

    Physics

    HTS Heerlen

Sprachen

  • Niederländisch

    Muttersprache

  • Englisch

    Fließend

  • Deutsch

    Fließend

  • Chinesisch

    Grundlagen

Interessen

Scuba diving (advanced open water) Slide trombone