Mario Saviciuc

Angestellt, Company Man/Drilling Supervisor, OMV Petrom

Bucharest, Rumänien

Fähigkeiten und Kenntnisse

I am a fast learner and find myself to efficient.
I am mechanically minded and have strong mathemati
I am realistic and understand the hard working con
My ease to adapt to new environments is something
I want to realize my personal goals and challenges
I am an active person
conscientious and serious
very thorough in required tasks.
I am able to perform the same types of tasks for a

Werdegang

Berufserfahrung von Mario Saviciuc

  • Bis heute 3 Jahre und 1 Monat, seit Apr. 2021

    Company Man/Drilling Supervisor

    OMV Petrom

    Drilling supervising at 4700 Barbatesti and 6600 Baicoi (HT/HP Wells): Communicate and interface with relevant parties to ensure that the drilling operation as per approved plan. HSE procedure and rules related with drilling activities. Plan, coordinate and perform on-site rig inspections, acceptance test on contracted drilling rig and third party equipment, materials and supplies. Review day-to-day operation and entire drilling operations. Prepare End of Well report.

  • Bis heute 10 Jahre und 4 Monate, seit Jan. 2014

    Vice President

    Geneva Upstream Club

  • 1 Jahr und 3 Monate, Jan. 2020 - März 2021

    Drilling Engineer

    OMV Petrom

    Perform Drilling Program for 123 Drăgăești ST including analysis, well control and casing design. Provide Operations Engineering, technical specifications and support to rig teams. Participate operations and DWOPs. Evaluate equipment, services, processes and technology to enhance drilling performance. Be a key roll in the after action review system, lead section reviews and incorporation of lessons learned. Maintain drilling documentation and data, Rushmore data. Responsible for the Final Well Reports.

  • 5 Jahre, Dez. 2015 - Nov. 2020

    Board Member

    World Petroleum Council

    Board Member at Youth Committee.

  • 6 Monate, Juli 2019 - Dez. 2019

    Company Man/Drilling Supervisor

    OMV Petrom

    For next wells 1532 Independenta, 699 Oprisenesti, H 40 Independenta, H 41 I Independenta, my responsabilities: Reporting of all well activities in reporting system, incidents and Non conformance reports. Promote a Safety environment and actively participate in safety and operational meetings. Auditing and participate in controlling work permits. Ensure all equipment, material and services are available. Strong team player with constant focus on good working with people on the rig as well as in the office.

  • 2 Jahre und 7 Monate, Dez. 2016 - Juni 2019

    Reservoir Engineer

    OMV Petrom

    For next reservoir studies like Merisani-Darganu, Ceptura-Urlati, Bragareasa, I had next responsabilities: Interpret field and individual well performance using the appropriate technique to ensure optimum production. Analyse the reservoir characterization required for evaluating petroleum reserves. Support reservoir data and results to formulate the production forecast. Develop and maintain strong working relationships with field operational sections (Drilling, Production and Operation sections).

  • 2 Jahre, Juli 2015 - Juni 2017

    Membership Chairman

    Society of Petroleum Engineers (Romanian Section)

    -> Knowing the requirements of SPE membership and how to apply. -> Ensuring that both members and non-members are fully aware of all the advantages of SPE membership. -> Organizing and executing member recruitment drives. -> Informing the section board about membership statistics. -> Recognizing long-term members. -> Encouraging members to volunteer.

  • 3 Jahre, Dez. 2013 - Nov. 2016

    Junior Reservoir Engineer

    OMV Petrom

    -> Work within integrated reservoir studies like Sotanga, Tintea-Baicoi-Floresti-Calinesti, Topoloveni. -> Provide support to Asset and Field Clusters in production monitoring and production analysis and optimization. -> Identify field development and improvement opportunities. -> Calculate hydrocarbon-in-place and reserves estimations. -> Involved in development and redevelopment studies of water flood, heavy-oil, and enhanced oil recovery projects. -> Carry out decline and risk analysis.

  • 2 Jahre, Juni 2014 - Mai 2016

    Board Treasurer

    Society of Petroleum Engineers (Romanian Section)

    Prepare annual operating budget. Perform an annual audit. Seek approval from the section board to begin development of a YP Committee. Organize an informal meeting of the section’s young professional members. Select or vote on YP committee members. Prepare a list of activities the committee wants to accomplish and the necessary budget. Present the budget and plan to the section board for support and approval. Begin planning and publicizing events and activities.

  • 2 Jahre, Juni 2014 - Mai 2016

    Awards Chairman

    Society of Petroleum Engineers (Romanian Section)

  • 3 Monate, Sep. 2013 - Nov. 2013

    Practice Reservoir Engineer

    RFD OIL & GAS

Ausbildung von Mario Saviciuc

  • 2019 - 2019

    Drilling

    Montanuniversität Leoben (MU Leoben, Montanuni, MUL)

    This program combines a unique selection of spezialized courses into an integrated, intensive and comprehensive drilling engineering education program using state of the art facilities, technologies and academic and field resources.

  • 2 Jahre, Okt. 2015 - Sep. 2017

    MBA in the Petroleum Industry

    University of Petroleum and Gas

    Appropriate application of knowledge, methodologies and advanced practices in the Management field of Petroleum Industry. Understanding and interpretation of new specific situations with the support of specialized knowledge. Critical thinking skills regarding decision making, field implementation of complex projects. Coordination of complex projects in multidisciplinary teams by assuming of various roles. Design and formation of feasibilities studies needed for analyzing profitability.

  • 1 Jahr und 6 Monate, Okt. 2013 - März 2015

    Master in Reservoir Engineering

    University of Petroleum and Gas

    Implementation of knowledge, methodologies and advanced practices. Analysis, design and implementation of appropriate advanced theories and models in current technologies. Using modern criteria and methods of performance evaluation. Field implementation of complex exploitation projects. Coordination of complex projects of exploitation in multi-disciplinary teams, assuming various roles. Preparing papers, studies and projects. Pattern developing for different phases of exploitation process.

  • 4 Jahre, Okt. 2009 - Sep. 2013

    Drilling, Extraction and Reservoir Engineering

    University of Petroleum and Gas

    Ability to coordinate and supervise drilling and workover processes. Technological expertise within the petroleum area. Ability to use dedicated drilling-production software. Ability to communicate both orally and in writing and to present professional results in a convincing manner. Risk evaluation and responsibilities in oilfield activities. Team work ability. Ability to use and assess technological solutions, while applying principles of ethics and sustainability.

Sprachen

  • Spanisch

    Muttersprache

  • Englisch

    Fließend

  • Französisch

    Grundlagen

  • Portugiesisch

    Grundlagen

  • Rumänisch

    Muttersprache

21 Mio. XING Mitglieder, von A bis Z