Dipl.-Ing. Markus Preuß

Angestellt, Global Manager Manufacturing Engineering and Sustainability Projects, GKN Sinter Metals

Radevormwald, Deutschland

Fähigkeiten und Kenntnisse

Program Management
Site Continuous Improvement Leader
Manufacturing engineering
Years of experience in operations
Health Safety Environment HSE
Logistics
Product Development
Production engineering
Lean Management
5S SMED Standard Work Visual Management Autonomous
International experience for Asia Pacific and the
Capital expenditure and investments
Industrial Engineering
APQP Processes
Production
IATF 16949 Zertifizierung
ISO 14001
OHSAS 18001
ISO 50001
Industrie 4.0
Clarizen Project Management Software

Werdegang

Berufserfahrung von Markus Preuß

  • Bis heute 2 Jahre und 7 Monate, seit Nov. 2021

    Global Manager Manufacturing Engineering and Sustainability Projects

    GKN Sinter Metals

    Responsible for dedicated ME and Sustainability Projects on a global level to ensure common alignment and added value of all related activities.

  • Bis heute 7 Jahre, seit Juni 2017

    Program Manager Global Small Segment

    GKN Sinter Metals

    Providing leadership to each program´s in the EUAPO region to ensure the timley excecution and delivery of the program, to specification and within agreed budgets. Key within this responsibility is the ability to pro actively identify and mitigate any risks to program performance. Primary interface with the customer for all aspects of the program including the area of engineering, supply chain, manufacturing engineering and quality.

  • 3 Jahre und 9 Monate, Okt. 2013 - Juni 2017

    Manager Manufacturing Engineering and HSEE Responsible

    GKN Sinter Metals

    Design and re-layout of the production value streams. Analysis of machine capabilities and planning of new equipment to integrate serial production for new buisness. Considering and implementation of operating model. Budget responsible and managing of the capitel expenditure to the management team. Ensure and enhance the 0 accident strategy. Integration and improvement of the HSEE strategy. Execute CIMS projects in accordance to budget.

  • 1 Jahr und 10 Monate, Jan. 2012 - Okt. 2013

    Manager 30C Radevormwald

    GKN Sinter Metals

    Analysis and restructuring of the processes in the plant Radevormwald. Excecution of lean fundamental tools (Standard Work, Autonomous Maintenance, 5S, SMED) for planning and technincal prepartion of the future layout for the plant. Restructuring of all process steps including discovering of none value added processes to increase the performance per hour. Technical realization of moving complex machine areas with involvement of engineers of technical departments according the planed value stream.

  • 2 Jahre und 1 Monat, Jan. 2010 - Jan. 2012

    Leader Logistics For Department DL2

    GKN Sinter Metals

    Ensuring the existing machine and personnel capacities for the realization of the agreed delivery dates and the operating results

  • 1 Jahr und 11 Monate, März 2008 - Jan. 2010

    Leader Production Shockabsorber Components

    GKN Sinter Metals

    Ensuring the existing machine and personnel capacities for the realization of the agreed delivery dates and the operating results

  • 6 Monate, Okt. 2007 - März 2008

    Project Engineer US Plants Wisconsin

    GKN Sinter Metals

    Development of low cost production systems with reduction of non value added processes to produce main bearings caps on the Honda production line at the facility in Germantown. Know How Sahring and communication of process data between the production sites in the Wisconsin area.

  • 1 Jahr und 5 Monate, Juni 2006 - Okt. 2007

    Process Development Engineer

    GKN Sinter Metals

    Responsible for the implementation of the APQP and PPAP Processes in the production of new parts including change management. Transfer of new product group from plant Oberhausen to plant Bonn and implementation of neccessary processes to realize serial production according the paned time schedule.

  • 2 Jahre und 6 Monate, Jan. 2004 - Juni 2006

    Site Continuous Improvement Leader (SCIL)

    GKN Sinter Metals

    Roll out the Lean Management philosophy at the Bonn plant and carry out improvement projects and workshops in cooperation with all departments and employees- Applience of lean tools like 5s, SMED, AM and Standard Work to opimize poduction process according the increase of performace per hour.

Ausbildung von Markus Preuß

  • 3 Jahre und 10 Monate, Sep. 1999 - Juni 2003

    Industrial Engineering

    University of Applied Sciences Cologne

Sprachen

  • Deutsch

    Muttersprache

  • Englisch

    Fließend

Interessen

My Family
Playing with my kids
Running
Tennis
Music

21 Mio. XING Mitglieder, von A bis Z