Philip Wotortsi

Abschluss: Bachelor of Science, North Carolina State University

Raleigh, Vereinigte Staaten

Werdegang

Berufserfahrung von Philip Wotortsi

  • Bis heute 10 Jahre und 4 Monate, seit März 2014

    Site Planning Engineer & Project Logistics Coordinator

    Siemens Healthineers

    -Successful completion of preliminary and final site plans for multiple Advanced Therapies modality and Miyabi projects for presentation and to bring about customer commitment for projects. Approximate revenue generated from Miyabi contracts averaging in multi-millions annually -Assignment of incoming projects to (12) site planners. Training of planners and cross training in Advanced Therapy, Magnetic Resonance and X-Ray Products: Women's Health, Urology and Ultrasound Modalities

  • 1 Jahr und 1 Monat, Aug. 2016 - Aug. 2017

    Adjunct Instructor

    Vance Granville Community College

    Successful delivery of 3-hour lectures once weekly on Manufacturing Processes as a portion of part time contract. Course instruction includes reviewing/teaching students on Chemistry (valence electrons, periodic table of the elements, balancing chemical equations), trigonometric functions, algebraic equation manipulation, concepts of manufacturing and processes and Six Sigma + Lean methodologies

  • 9 Monate, Juni 2013 - Feb. 2014

    Process Engineer II

    International Automotive Components

    Managed and worked on series of six sigma projects for different departments. Completed projects including scrap savings for Toyota Sienna (reducing company cost of $375k in 6 months), rollup crease scrap reduction ($35k cost savings), un-coated crease, heel test machine design for Honda, quad package and splicing optimization. Main foci of projects are product/process quality and continuous improvement for cost reduction

  • 2 Jahre, Juli 2011 - Juni 2013

    Designer/Drafter

    Siemens Healthineers

    Created customized site drawing packages for all modalities including Radiographic, Fluoroscopic, Cardiology, Angiography, Computerized Tomography, Magnetic Resonance, Therapy, SPECT and PET/CT Systems Performed technical analyses to support customers’ medical equipment purchase and installation

  • 10 Monate, Aug. 2012 - Mai 2013

    CT Site Planning Intern-Masters Thesis

    Siemens Healthineers

    Focused on preliminary and final site planning projects for SOMATOM Definition AS and Edge CT modality systems. Final layouts include architectural, structural, electrical and mechanical functions of the CT system at the customer site location

  • 4 Monate, Mai 2010 - Aug. 2010

    Energy Efficiency Intern-Six Sigma: Lighting

    Rio Tinto Alcan

    University Foreign Exchange Work Program Analyzed plant lighting and made suggestions to convert the current lighting into a more efficient alternative source through the use of Six Sigma-DMAIC methodology Made recommendations based on calculations of energy expenditure and plant lighting history research Completed project under the supervision of a Master Black Belt

  • 1 Jahr und 8 Monate, Mai 2007 - Dez. 2008

    Mechanical Engineer

    BMW Manufacturing Co., LLC

    Worked on variety of projects, including Test-Car Builds, Process Sheet updates, Robot Removal Rail Installation, webpage creation, and Continuous Improvement projects (Value-added Production System).

Ausbildung von Philip Wotortsi

  • 1 Jahr und 5 Monate, Jan. 2012 - Mai 2013

    Integrated Manufacturing Systems Engineering

    North Carolina State University

  • 4 Jahre und 5 Monate, Aug. 2007 - Dez. 2011

    German studies

    North Carolina State University

  • 4 Jahre und 10 Monate, Aug. 2006 - Mai 2011

    Mechanical Engineering

    North Carolina State University

Sprachen

  • Englisch

    -

  • Deutsch

    Gut

21 Mio. XING Mitglieder, von A bis Z