Rassam Timimi

Angestellt, New works Manager, LafargeHolcim, Mombasa Plant -KENYA

Mombasa, Kenia

Fähigkeiten und Kenntnisse

Project Management
Electrical
manufacturing
Engineering consultancy
Engineering services
Building construction
project management
Maintenance
Excel

Werdegang

Berufserfahrung von Rassam Timimi

  • Bis heute 6 Jahre und 1 Monat, seit Apr. 2018

    New works Manager

    LafargeHolcim, Mombasa Plant -KENYA

    Streamlining projects department interms of cost reporting and Job tracking Achievement:- Spent 5.6M CHF against 8.0M CHF, Improved the departmental cross functional works by involvement of the section heads.

  • Bis heute 13 Jahre und 4 Monate, seit Jan. 2011

    New Works ENGINEER

    Lafarge Bamburi

    Responsible for new projects or expansion in the plant

  • 1 Jahr und 5 Monate, Okt. 2008 - Feb. 2010

    Projects Manager (long term mission)

    Lafarge, Hima Plant -UGANDA

    Installed a Gas conditioning Tower on 650 Ton/day Kiln [euro 0.97M] Achievement: - controls temperature to the filter, reduce dust emission and filter maintenance cost. Managed all CAPEX projects at Hima Cement including the Plant Fire suppression system [euro 1.9M] Achievement:- Reduced Plant Insurance premiums and better preparedness in the event of fire

  • 2 Jahre und 1 Monat, Okt. 2006 - Okt. 2008

    New Works Engineer

    Lafarge, Mombasa Plant - KENYA

    Shell change totaling 30.75 metres with a new outlet section on a 1965 Ton/day Kiln [euro 1.0M] Achievement:- Improved Kiln reliability and increased refractorReplacement of a cracked Tyre / shell at station 1 on a 1300 Ton/day Kiln [euro 0.7M] Achievement:- Improved reliability and renewed tyre life RK1 Cooler replacement / Kiln Hood / Burner pipe, site manager [euro 5.4M] Achievement:- Improved reliability +6% (92 - 98%) and performance +20 ton/hr (70 - 90 Ton/hr)

  • 10 Jahre und 7 Monate, März 1996 - Sep. 2006

    Burning Section Planner-Methods Department

    Lafarge, Mombasa Plant. KENYA

     Involved in set up of the Methods department  Responsible for the planning/scheduling of weekly maintenance activities and shutdown planning (resource/contracting, tools/ equipments, spare parts sourcing/quality approvals, cost control MCI and participate in the PIP)  Working closely with section foremen, first level/specific inspectors, production, process departments and TCEA  Advanced Downtime Analysis Programme – ADAP champion

  • 2 Jahre und 7 Monate, Aug. 1993 - Feb. 1996

    Section Engineer Kilns 1 & 2 Electrical

    Bamburi Portland Cement, Mombasa. KENYA

    Responsible to the senior maintenance engineer for implementing planned and condition monitoring maintenance of electrical equipments in the burning section including the electrical rooms. Isolators,CB,SF6 switchgears and transformers [11KV,3.3KV,415V,220V,48V,24V].Diesel generators 500KVA

  • 2 Jahre und 11 Monate, Sep. 1990 - Juli 1993

    Assistant Electrical Engineer

    Bamburi Portland Cement Co. Ltd

    Assigned to work in various operational areas reporting to the plant electrical engineer (crusher 4, Crusher 5, Pre blending hall, Tertiary Material hall, Raw mill 4, Raw mill 5, Raw meal Blending silos, Rotary Kiln 1, Rotary Kiln 2, Shaft Kilns, Crane Hall, Cement mill 1 - 4,Packing plant 1 – 3, outer stations Mbaraki and English point

  • 1 Jahr und 7 Monate, Feb. 1989 - Aug. 1990

    Graduate Trainee

    Bamburi Cement Ltd Group Cementia and Blue Circle

    Undertook a graduate training programme of 18 month duration and submission of suitable experience in lieu of training, in accordance with IEE (UK) regulations[Bye law 12C]

Ausbildung von Rassam Timimi

  • 2 Jahre und 10 Monate, Sep. 1985 - Juni 1988

    Electrical Engineering

    University of Nairobi

    Microwave and Telecommunications

Sprachen

  • Englisch

    Fließend

  • Arabisch

    Gut

  • Kiswahili Native

    -

Interessen

Swimming
soccer
running
travelling