Ing. Reinhard Moedl
Angestellt, yacht skipper, exit strategy
on the seas, Thailand
Werdegang
Berufserfahrung von Reinhard Moedl
Bis heute 8 Jahre und 8 Monate, seit Sep. 2015
yacht skipper
exit strategy
skipper on our yacht Exit Strategy. Responsible for safety, hospitality, navigation, repairs of any kind
3 Jahre und 1 Monat, Aug. 2011 - Aug. 2014
commissioning manager mechanics for CCGT power plants
Siemens AG Österreich
Commissioning manager for mechanical issues as well as warranty engineer. Duties: coordination of mech. comm., responsible for compliance with project time schedule, support of team in technical details, coordination with client, safety releases for work permits, daily and weekly forecasts for gas and electric energy. Decision of acceptance or rejection of warranty claims, planning of repair works, coordination of plant outages. Units: CCGT Enecogen, 2x440MW / NL; CCGT Hemweg 9, 440 MW / NL
11 Monate, Sep. 2010 - Juli 2011
coordinator of functional issues for boilers of power plants
Josef Bertsch Ges.m.b.H. & Co KG
Engineer for development of control logics for boilers in power plant projects. Duties: preparation of detailed logic diagrams and descriptions, technical clarification with boiler engineering as well as suppliers of gas turbine and burner systems, coordination with client and owners engineer. Operational area: A, D, CH
10 Jahre, Sep. 2000 - Aug. 2010
managing director, project coordinator
abacus engineering & consulting GmbH
Commercial and technical managing director. Project management for clients in international industrial projects in the fields of CCGT – power units, metallurgic plants, gas reducing stations, general industrial plants. Excerpt of clients: SIEMENS, VATECH, SGP-VA, BABCOCK, WABAG, LURGI, ANDRITZ, BLOHM & VOSS, ENVIRGY, WIENER WASSERWERKE, GAT, ... operational area: A, D, CHI, CHN, GR, IND, MAL, IR, TRK, ZYP
1995 - 2000
independent contractor
TB Mödl
planner contracts in industrial plants, CCGT power plants, water- and waste water plants, sludge treatments. Activities: overall commissioning of plants (process, mechanical, controls, electrics); engineering in the fields of caloric power plants and water / waste-water Operational area: Austria, Germany, Cyprus, Iran, Egypt
1988 - 1994
department manager
GWT Ges.m.b.H.
Duties: commissioning engineer, later head of department for electric, instrumentation, automation. Activities: setup of the very young company by international commissioning of the plants and feedback to the engineering departments, training of new employees, initiation and setup of a new department for electric, instrumentation, automation and electric panel workshop. Operational area: Austria, Birma, Yugoslavia, North-Cyprus
1985 - 1988
commissioning engineer
Simmering Graz Pauker (SGP)
Duties: commissioning engineer Activities: commissioning and hand over of all international built plants such as filters, flocculators, reverse osmosis, demineralizations, evaporators, sludge combustions, industrial waste water plants, cooling towers, boiler dosing and sample stations, etc. Operational area: UdSSR, Algeria, Syria, North-Cyprus, Turkey
1982 - 1985
engineer
ELIN UNION
Duties: engineer for offering projects for high voltage switchgears and generator busducts; commissioning engineer Activities: quotation projects (e.g. 420 kV supergrid project in Syria, several HV switchgears outdoor and indoor, generator busducts in Thailand and Indonesia, further modification and commissioning of burner controls for oil fired power plant La Kadischa / Lebanon (light- and heavy oil), assistant at 380 kV switchgear Duernrohr and 220 kV switchgear in river power plant Feistritz
Ausbildung von Reinhard Moedl
1976 - 1981
electric engineering
HTBLA Hollabrun
energy
Sprachen
Deutsch
Muttersprache
Englisch
Fließend