Ricardo Galleguillos Pizarro
Bis 2021, Lean Manager (CBS), Continental AG
Santiago, Chile
Werdegang
Berufserfahrung von Ricardo Galleguillos Pizarro
Bis heute 2 Jahre und 11 Monate, seit Juni 2021
Operational Excellence Consultant
Codelco
In charge of the Continental Business System (CBS) in Chile. Directly reporting to the Plant Manager. Responsible for creating a "Lean Culture", implementing the corporate strategy and lean tools (gemba walk, 5S, Problem Solving A3, VSM, TPM, OEE). On my leadership we improved Mixer OEE from 78% to 89%, and achieved a total of 1.000 kEur of cost savings and with a forecast of 600 kEur for 2021 based on Engineering Projects, Process Optimization and Quality Improvements.
Purchases of raw materials (chemicals, fabrics, rubbers, accelerators, retardants, oxides, resins, carbon black and steel cables), finished products (belts, hoses and antennas), Martin line products, maintenance services (modifications, repairs and fabrications), personal protection elements, corporate clothing, packaging (wooden crates and pallets, lecterns and metal reels), metal inserts, steel profiles and fasteners, with suppliers from Chile, Brazil, Peru, United States, Germany, China and India.
Mercedes Benz “Quality Control” project: Quality control and assurance of the Pilon´s supplied by IMM/Say to Mercedes Benz through the conduction of weekly spot Audits, KPI, Pareto and shopfloor, VDA 6.3 in the factory in Turkey and warehouse in Germany. ThyssenKrupp “Quality Excellence” project: Lead Workshop group through quality tools such as, Brainstorming, 5Why´s, and Turtle Diagram. Report of prioritization of improvement pilot project´s based on root causes.
The project aimed to achieve "Excellence in Quality" in the final product, through the implementation of pilot projects for continuous improvement in the Supply Chain in Spain. As part of a team of 4 Senior and Executive Consultants from Germany and China, I was responsible for developing surveys, leading interviews with senior executives (Spanish and English), analyzing the data and preparing progress reports.
11 Monate, Nov. 2013 - Sep. 2014
Supply Chain and Procurement Manager
Atacama Water & Technology Ltda.
Leader of the logistics, purchasing and procurement for works, equipment, parts, chemicals, major and minor supplies for the Operation and Maintenance of the Plants of Antofagasta (USD 3M) and the Expansion Project of the Desalination Plant (USD 30M). Participation in negotiations with foreign suppliers from United States, Japan, and Spain. Creation of economic proposals for new projects (Radomiro Tomic, Codelco Desalination, Mitsubishi Industries).
6 Monate, Okt. 2013 - März 2014
Project Manager of the “Safety Tanks Project”
Atacama Water & Technology Ltda.
Lead a team of 4 engineers and manage a project budge of USD 40M. Plan, control and monitoring all the activities of the bidding process. Elaborate the Specific Administrative Bases (Financial and administrative requirements) and present the progress of the Project to the board of Managers.
1 Jahr und 2 Monate, Okt. 2012 - Nov. 2013
Purchasing and Logistic Engineer
Atacama Water & Technology Ltda.
Implementation of workflow, procedures, instructions, and policies for the purchasing process. Categorization and management of spare parts for the Desalination Plant and the Construction Department. Design of the logistics network plan and the critical parts plan for the Desalination Plant. Deployment and implementation of Purchasing and Inventory software created by Oracle for the company. Continuous improvement and standardization of the logistic and contract processes.
8 Monate, Apr. 2010 - Nov. 2010
Thesis Engineer
Nexografica
Management improvement through the implementation of the Scaling Continuous Improvement System.
3 Monate, Jan. 2010 - März 2010
Practice Engineer
Minera Escondida Ltda
Development and Control of work accident statistics in the Safety and Occupational Hygiene Department
Ausbildung von Ricardo Galleguillos Pizarro
1 Jahr und 2 Monate, Mai 2013 - Juni 2014
Logistics Diploma
Pontificia Universidad Católica de Chile
1 Jahr und 1 Monat, Sep. 2011 - Sep. 2012
Master in Science of Project Management
University of Salford
5 Jahre und 10 Monate, März 2005 - Dez. 2010
Industrial Engineering
Universidad Católica del Norte
Sprachen
Spanisch
Muttersprache
Englisch
Fließend
Deutsch
Grundlagen