Richard Meier-Windhorst

Angestellt, Project Manager, ESCAD AG

Hamburg, Deutschland

Fähigkeiten und Kenntnisse

Project Manager IPMA Level D

Werdegang

Berufserfahrung von Richard Meier-Windhorst

  • Bis heute 6 Jahre und 8 Monate, seit Sep. 2017

    Project Manager

    ESCAD AG

    Project Manager for the General Cargo Box Management for the FAL's ASIA and USA General Cargo Mod Management for Mod implementation for the FAL's ASIA and USA Secondary Flow Material Management for the FAL's ASIA and USA

  • 1 Jahr und 6 Monate, Juni 2015 - Nov. 2016

    Project Manager

    ESCAD AG

    General Project Management for the General cargo processes for the FAL's ASIA and USA Generating, supporting and implementing the DG process for the FALs USA and China Solve DG transportation issues All done on the Airbus facility in Hamburg Finkenwerder, Department BSLGB2

  • 2 Jahre und 10 Monate, Aug. 2012 - Mai 2015

    Project Manager

    ESCAD AG

    Generating a project management plan for the Back Office implementation to the FAL USA Project. Creation of management performance evaluation and reporting. Consolidation of all involved departments and unification of integration process. Change management implementation and tracking. All done on the Airbus facility in Hamburg Finkenwerder, Department BSLGB3

  • 4 Monate, Apr. 2012 - Juli 2012

    Technical Consultant

    Self Employed Technical Consultant

    Regenerative Energies / Automotive / Aeronautical / Insurance

  • 6 Monate, Okt. 2011 - März 2012

    Management Consultant

    BMW Group

    Implementation and creation of necessary processes and methods for the project ‘Reduction of warranty costs’ for the drive train department for all vehicles. Consolidation of all involved departments and unification of integration process. Creation of performance evaluation and reporting.

  • 1 Jahr und 6 Monate, Apr. 2010 - Sep. 2011

    Technical Advisor

    Guide Group GmbH

    Technical advisor for different projects in house and at trade fair stands. Risk assessment in the field of regenerative energy insurances.

  • 4 Monate, Okt. 2009 - Jan. 2010

    Selbstständig

    GAT-E Engineering facilities, Hamburg, Germany

    Generation of specification documents for a FAL (Final assembly line) in Russia. Pre-design of jigs and tools based on optimizing of work flow.

  • 1 Jahr und 9 Monate, Jan. 2008 - Sep. 2009

    A350-XWB FAF-Electric Project Performance Manager (PMO) Airbus Hamburg

    HIGH-END Engineering GmbH

    Implementation and creation of necessary processes and methods for development tracking Creation of automated performance evaluation and reporting Consolidation of all involved departments and unification of integration process

  • 7 Monate, Juni 2007 - Dez. 2007

    Administration – Manager Electrical System Integration – Dept. DTDUE Airbus Brem

    HIGH-END Engineering GmbH

    Management of ‘Fast Track’ TRS Support in problem solution. Communications management between departments. Creation of report documents.

  • 2 Jahre und 7 Monate, Nov. 2004 - Mai 2007

    Group manager – Processes & Methods

    HIGH-END Engineering GmbH

    Project administration and coordination in the area of Processes & Methods Enterprise resource planning (>100 employees) Coordination of partners and sub contractors Creation of calculations and requests for proposal Acquisition and customer service

  • 6 Monate, Mai 2004 - Okt. 2004

    Project manager and trouble shooter – HIGH-END Engineering

    HIGH-END Engineering GmbH

    Co. administration of the team for the optimization of the FTI (Flight Test Installation) design process at AIRBUS – Department TREVI Development and implementation of a design process optimisation

  • 1 Jahr und 1 Monat, Apr. 2003 - Apr. 2004

    Project manager – Airbus Hamburg

    HIGH-END Engineering GmbH

    Coordination and supervision of the assembly of a A380 Demonstrator for and at AIRBUS Management of all involved partners and subcontractors Coordination, supervision and execution of various tests with the aim on improving the upcoming manufacturing of this section point C95 in the AIRBUS FAL. Tests included checking and improving of manufacturing tools and methods, development of new measuring devices and methods and the implementation of these into the upcoming manufacturing process

  • 1 Jahr und 8 Monate, Aug. 2001 - März 2003

    Project engineer – Airbus Hamburg

    HIGH-END Engineering Gmbh

  • 2 Monate, Juni 2001 - Juli 2001

    Project manager – Trouble shooter

    HIGH-END Emgineering GmbH

    Construction of jig and tools for the AIRBUS test facilities Supervision of final production, delivery, technical approval and installation of a A318 Belly-Fairing Jig for AIRBUS

  • 8 Monate, Okt. 2000 - Mai 2001

    DMU Zone Manager (Digital Mock Up)

    HIGH-END Engineering GmbH

    Implementation of DMU Zone Management in the VOLKSWAGEN Interior Division D1(Phaeton) and Polo (Wolfsburg) Creation and monitoring of the necessary DMU Structure Training of all division employees in the use of DMU Execution of collision investigation using CATIA and DMU Navigator Securing/monitoring of the investigations

  • 5 Monate, Mai 2000 - Sep. 2000

    Constructional engineer – support brackets

    HIGH-END Engineering GmbH

    Construction of system support brackets for AIRBUS

  • 2 Jahre und 4 Monate, Jan. 1998 - Apr. 2000

    Constructional engineer – jig and tools – Airbus Hamburg

    HIGH-END Engineering GmbH

    Construction of jig and tools for the AIRBUS test facilities Supervision of production, installation and life cycle monitoring during the test phases Adaptation of jig and tools where appropriate

Ausbildung von Richard Meier-Windhorst

  • Penn State Univercity & Fachhochschule Hamburg

Sprachen

  • Deutsch

    Muttersprache

  • Englisch

    Muttersprache

21 Mio. XING Mitglieder, von A bis Z