Deepak Parackal

Angestellt, Planning and Procurment Manager, Food Plastics Pty Ltd

Melbourne, Australien

Fähigkeiten und Kenntnisse

Production planning and control
Plastic injection moulding
Procurment
Assembly Line manufacturing
Scientific Injection Moulding
Experience of using SAP Manufacturing
Lean Manufacturing
International experience
Experience of Processing with 30+ Plastic material
Working with 6 axis Robots in Injection Moulding
Microsoft Excel
Automotive
Medical
Worked in Aerospace Defence and Marine
PowerPoint
Internal Auditor for AS9001 and TL16949
Electrical and FMCG
Processes
SEO
Verfahren

Werdegang

Berufserfahrung von Deepak Parackal

  • Bis heute 8 Jahre und 2 Monate, seit Aug. 2016

    Planning and Procurment Manager

    Food Plastics Pty Ltd

    Analyse forecast, customer demands and organize plan.Prepare production schedule.Maintain BOM, Liaise with Sales and operations through regular meetings and discuss about deliveries. Procure and Manage raw material.Ensure label and other customer supplied BOM material to adequate levels and in stock.Develop new suppliers for packaging and masterbatches.Coordinate strive to reduce cost and increase productivity as part of process and continuous improvement.

  • 1 Jahr und 1 Monat, Aug. 2015 - Aug. 2016

    PRODUCTION ENGINEER

    FAIRMONT MEDICAL PVT LTD

    Lead and mange Production and process of Injection moulding shop floor. Improve the process parameters as per standards.Create a seamless weekly plan for moulding to align with assembly product line. Implement process for procurement of resins and masterbatches to avoid wastage. Introduce KANBAN on high volume parts.

  • 2 Jahre und 4 Monate, Apr. 2013 - Juli 2015

    Die Setter

    CLIPSAL by Schneider Electric

    Do die changes on Injection moulding machines and start production as per schedule. Process setting of machines during start up and troubleshooting. Planning and assembling tools, jigs set up as per weekly plan sheet. Train and support team members during process issues and setup. Take part in SMED and KAIZEN implementation.

  • 1 Jahr und 1 Monat, Jan. 2012 - Jan. 2013

    Deputy Manager

    Tyco Electronics Corporation Ltd (TE connectivity)

    Leading a team of 100 empoyees, directly responsible for Safety, Quality and Deliery at optimum cost. Spearhead TEOA (business process based on Lean). Promote and implement innovation and continuous improvment through out the value streams . Direct involement in employee and union issues. Conduct everyday meetings with Supplychain, quality and Warehouse. Prepare reports and present to global team on improvments and performance of the plant.

  • 1 Jahr und 5 Monate, Sep. 2010 - Jan. 2012

    Associate Manager

    Tyco Electronics India Pvt Ltd.

    Directly responsible for cable harness production, GE medical cable assembly. Implement changes in responsible value streams baswd on Lean. Study bottle neck in operations to achieve 95% on time delivery and achieving cost targets.

  • 2 Jahre und 9 Monate, Jan. 2008 - Sep. 2010

    Senior Engineer

    Tyco Electronics Corp India Pvt Ltd.

    Die trials of new mould or modified tool as per the spec and drawing. Conduct Scientific Injection moulding to develop optimum process parameter for high volume production.Review PFMEA,PFC according to customer feedback and incorporate yearly improvements. Document all moulding parameters, work instructions and critical process of new parts.Troubles shoot any moulding issues with parts running with suppliers. Lead and participate in 2 Kaizen events per month on Safety, Quality and Cost.

  • 1 Jahr und 3 Monate, Okt. 2006 - Dez. 2007

    Engineer Moulding

    Tyco Electronics Corp Pvt Ltd.

    Manage over moulding cable assembly for currency machine and assembly of moulded connectors. Develop process parameter on the basis of trials. Trouble shoots quality issues and ensure parts as per specification. Schedule weekly production of smart terminal board assembly. Move manpower around assembly lines to complete daily targets. Coordinate transfer projects of medical cable assembly. Manage GE medical cable assembly.

  • 3 Jahre und 10 Monate, Jan. 2003 - Okt. 2006

    Moulding Engineer

    Motherson HAG Tooling LTD (Samvardhana Motherson Group)

    •Setting of moulds in machines and prepare for production. Take trials of new tools and prepare parameter sheets, Complete trial report. Procure raw material, Feed back on trials and of design of new tools. Prepare for quality audits. Prepare work flow for new products.

  • 3 Monate, Apr. 2004 - Juni 2004

    Production Planner

    Hag Kunststofftechnik GmbH, Liebring Austria

    Deputation as Planner for Ford Project. Plan production as per Demand in Saarlouis, Germany and Valencia, Italy Ford Auto plants. Communicate with Shift leader and plant manager, Create request with suppliers for Crates and packaging. Issue requirement for resins, Masterbatches and subassemblies. Take part in Process improvement and Quality audit preparations for TS16949.

  • 6 Jahre und 5 Monate, Aug. 1996 - Dez. 2002

    Engineer

    Timex Watches Ltd

    Joined Timex Watches as Mould Setter and rose to the Position of Assistant Engineer. Jobs include setting tool on the machine, taking trials, Setting up Parameter, Mangine the Shift, Depatment, Allocatting work for operators, Preparing reports.

Ausbildung von Deepak Parackal

  • 2 Jahre und 7 Monate, Dez. 2007 - Juni 2010

    Operations Management

    Symbiosis Institute

    Operations Management

  • 1 Jahr und 2 Monate, Juni 1994 - Juli 1995

    Plastic Technology

    Central Institute of Plastics Engineering and Technology (India)

    Plastic Processing, Plastic Testing, Basics of Mold design and Mold making

  • 3 Jahre, Apr. 1991 - März 1994

    Chemistry

    Mahatma Gandhi University Kottayam

    Chemistry, Physics and Mathematics

Sprachen

  • Englisch

    Fließend

  • Deutsch

    Grundlagen

  • Hebräisch

    -

  • Russisch

    -

  • Hindi

    -

Interessen

Philosophy
Reading History

21 Mio. XING Mitglieder, von A bis Z