
Milan Bozic
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Milan Bozic
- 1 Jahr und 1 Monat, Juni 2017 - Juni 2018
Project Manager
Lyra Health
Warehouse Automatization
- 10 Monate, Sep. 2016 - Juni 2017
Krušik Valjevo logo Team Lead Mechanic
Krušik Valjevo
Transfer technology.Transfer technology. Skills: Defense · Cross-cultural Teams · Production Planning · Organization Skills · Industry Automation · Computer-Aided Design (CAD) · Search · Interpersonal Communication
- 6 Monate, Juni 2015 - Nov. 2015
Project Coordinator As.
Jacobs Projects GmbH
- PROTOCOL AND DATA MANAGEMENT: -Scope of Project.; Conformity Certificate; Manufacturing isometry.Pipe class, list of components, Equi-spec; P&ID and Flow charts; 3D model Snapshot(PDMS and Navisworks), Pipeline plan view; Representation of Pipelines(Montage and Demontage); List a binding points (EP)... Detail sketch of new pipeline with hangers, supports and steel structure for support pipelines. Independent decision making: materials, type and design of the support construction
- 5 Monate, Feb. 2015 - Juni 2015
Lead Engineer
Blist d.o.o.
Manage production life cycle Planning &Production of solid fuel stoves,boilers*Technical documentation of product (Detail drawing of assembly and parts for fabrication,plan of weld and montage);Machines and tools (CNC cut machine,shearing machine,press machine,welding with electrode and CO2, automatic line for coating, tools for punching and stamping*Development new product-Planning,produce,test of Pellet Stove. Create prototip.
- 3 Monate, Jan. 2014 - März 2014
Anlage Planer - Project Engineer
Bilfinger-Kuraray Europe-PetersTebodin ( SPLU EXPERTS)
Material Steel,Diameter up to 150, PN16. According to P&ID Modeling Pipes with all components, supports,steel structure needed for hang or support Pipes. Creating,Analyse,Modification of Model are base for high QM,also, lead ideas while working are: Task done in appropriate time, minim. of material, simply geometry and low cost of production, min. cost of montage, possibility for service.
- 4 Monate, Okt. 2013 - Jan. 2014
Project Engineer
7(S) Engineering - max streicher anlageplanung leipzig - delitzsch
Plant :Biogas Refinery Detail level Responsability over Proces Water Units: civil pipe equipment steel structure. Responsible over : General Layout of Plant; Isodraft of Pipelines, ;Build Documentations; Material List-Komponents; Drawings (Plant Layout, Process Units, Pipe Layout)
- 10 Monate, Sep. 2012 - Juni 2013
Project Engineer
IKP WORMS -UHDE-THYSSENKRUPP DORTMUND
Uhde-ThyssenKrupp, Dortmund,hired from IKP(IPZ) Worms From 09/2012 to 06/2013. Offer and Basic level of Chemical Plant. Offer Task: General Arrangement of Civil,Equipment,Steel Structure and Pipes at appropriate level. Project executing ,creating 3D model of a plant,drafts, isodrafts, material lists. Projects: Agrium Lighting(Ammonia-Urea-Ammonia Nitrate Plant)
- 3 Jahre und 6 Monate, März 2009 - Aug. 2012
Chief Planer,Project Engineer
R.B.Kolubara (EPS Serbia)
Kolubara Metal l.t.d. , R.Serbia Chief Planer Profit Center Electromechanical field overhaul Project Engineer - periodically engaging,one year Profit Center Engineering Technologist-Manufacturing Engineer - periodically engaging,half year Profit Center Mechanical overhaul in workshop Planning of service and emergency maintenance (SEM) of open pit coal mine Tamnava West Field-Kalenic, Serbia ; SEM business analysis, daily reporting to Mechanical Manager Tamnava WF, monthly reporting to the Director
- 1 Jahr und 3 Monate, Nov. 2007 - Jan. 2009
Project Engineer
Uhde-ThyssenKrupp Dortmund.
Project - Orica Type - Ammonia Nitrate Plant Year – 11.2007./01.2009. Responsible over Units: Dry part, Separation and Stock Place of plant . Cover: Pipes,Equipment, Steel Structure, Civil,HVAC Project - EAgrium Type - Ammonia & Urea Plant Year - 08.2007.one month
- 10 Monate, Feb. 2007 - Nov. 2007
Project Engineer
IPZ (IKP) Worms,Germany ; Ino Ing Belgrade
Projects: Cenco (Refinery); Nikola Tesla (Thermal Plan); Jeda(P.P. Gas), Neurath(Thermal Plant). Detail level. Neurath:Water treatment department was my part of project. Nikola Tesla: Accodring to GAD of Plant,P&ID and Process Flow build 3D model,Draft and Isodraft for Maintenance. Cenco:Relocation of Refinery.Creating 3D model with PDMS and Laser scan(processed with Plant Links software).
- 1 Jahr und 4 Monate, Nov. 2005 - Feb. 2007
Lead Technologist,Technologist.
Krusik
Creating offer, product development, manage production, reports to P.C. Manager, coordination with other Profit Centers, implementation of Quality Management, maintenance of mold tools(plastic-bakelit). Key Achievements: • Manage all phases over -Project (Initiating, Planning, Executing, Monitoring and Controlling, and Closing) -Production (Design, Build, Quality Assurance, Exploitation) of PRODUCTION LINE FOR ASSEMBLING OF ANTY-HAIL ROCKET. • Project of Repair Facility,Assisting to Manager.
Ausbildung von Milan Bozic
- 8 Jahre, Okt. 1996 - Sep. 2004
Mechanical Construction and Mechanization
Mechanic Faculty , Belgrade University
Civil and Mining mechanization
Sprachen
Englisch
Fließend
Deutsch
Gut
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.