Navigation überspringen

Mohammed Amanot Ullah

Angestellt, Senior Engineer - EWIS | Aerospace, Deutsche Aircraft GmbH
Bis 2006, Electrical and Electronics Engineering, American International University-Bangladesh (AIUB)
Munich, Deutschland

Fähigkeiten und Kenntnisse

Wiring Harness
LCable
VOBES
hyperKVS
Microsoft Office
Worldwide Engineering Release System (WERS)
FordSpeak
GPDS
Project Engineering and Development
E3-Cable
SSP & SLP
LD4TW
BMW Bordnetzentwicklung
Pinning DB
TEREG
TAIS
Project Management
PBE-SDV
DZA
LDorado Design
Elektrotechnik
COMSOL Multiphysics
Fiber optics
Englische Sprache
Elektrik
High Voltage
EWIS
Polarion
Requirements Engineering
Verification and validation
Cable Technology
Energy
Sustainability
Systems Engineering
Systemengineering
Automotive Business
Leadership
Responsible
Team work
Communication skills
Technical Knowledge
Leadership skills
willingness to learn
hands-on mentality
Strategic mindset
Creativity
Commitment
ambitious
Enthusiasm
Flexibility
Conceptual thinking
Organizational skills
Fast learner
problem solving skills
Teamcenter
Aerospace
Electrical Wiring Interconnect System
Engineering Project Management

Werdegang

Berufserfahrung von Mohammed Amanot Ullah

  • Bis heute 7 Monate, seit Dez. 2024

    Senior Engineer - EWIS | Aerospace

    Deutsche Aircraft GmbH

    Progressive ten years of experience in Germany in aerospace, automotive and high voltage domain, from which, multiple years explicitly in design and development of Electrical Wiring Harness/ HV Electrical Wiring Interconnection System (EWIS). Worked successively in three different automotive-OEM atmospheres in Europe and learned their various process developments.

  • 2 Jahre und 8 Monate, Apr. 2022 - Nov. 2024

    Senior Systems Engineer, High Voltage EWIS

    Lilum eAircraft GmbH

    MAIN JOB RESPONSIBILITIES: i) Developing the concept of High Voltage (HV) EWIS system. Writing Technical Requirements Document (TRD) for HV EWIS components. ii) Leading EWIS System's safety analysis (e.g., segregation, separation distance, arc-fault analysis). iii) Performing Validation & Verification (V&V). iv) Coordinating internal HV test campaign. v) Supplier management and supports. vi) Working with aerospace technical specifications and standards.

  • 1 Jahr und 7 Monate, Sep. 2020 - März 2022

    System Engineer – HVDC Transmission

    Prysmian Group - Norddeutsche Seekabelwerke GmbH

    German energy corridors: a new frontier in Germany's energy transition with 2 GW HVDC-connection from North-East Germany (Area of Wolmirstedt) to the South of Bavaria (area of Isar). A Capacity extension to 4 GW is under investigation.

  • 2 Jahre und 3 Monate, Juni 2018 - Aug. 2020

    Ingenieur - Bordnetzentwicklung (Wiring Harness Development Engineer)

    Allgeier Experts Pro GmbH

    * Entwicklung Physisches Bordnetz - EE433 (BMW Project) * E3-Cable (SSP & SLP) * LD4TW * LDDesign * PINNINGDB * PBE-SDV * DZA * TAIS * MSTAIS * DMS IM PEP

  • 3 Jahre und 11 Monate, Juli 2014 - Mai 2018

    Project Engineer (EESE)

    Segula Technologies GmbH

    Worked under the department of Electrical & Electronic System Engineering (EESE) for Russian Localization Project of Ford of Europe (FoE). * WERS * GPDS * EESE Project Management * Responsible meeting representative * Analyzing technical drawings, PFEP list, AVBOM regarding EDS & Fasteners

  • 1 Jahr und 1 Monat, Okt. 2012 - Okt. 2013

    Asst. Manager, Electrical Wiring Harness

    Runner Automobiles Limited

    Runner Automobiles Ltd. is the first manufacturer of wiring harness for the entire cross-section of Automobile Industry in Bangladesh. I am the incharge of 'Electrical Wiring Harness (EWH)' department. Main tasks: coordinating the entire project, developing harness concept, preparing wire list & BOM and manufacturing wire harness.

  • 3 Jahre, Apr. 2009 - März 2012

    Design Engineer, Electrical Wiring Harness

    DAB Dräxlmaier Automotive Bangladesh Pvt. Ltd.

    Main tasks: Preparing Schemetics, Wire-list & BOM, Creating Change Report, Introducing Change Reports to KSK, Preparing DFS-Kostenbewertungs, Preparing documentation and Systemuebersicht for the concept project, Preparing Systemuebersichts, for example: SiDo, Nano, HV, Massebolzenübersicht, CAN (BUS Topologies) für KSK and Autarke. Main tools: Lcable, MS office packet, Wire Engineering, Wire Construct, Spicer, Diacalc etc.

  • 1 Jahr und 1 Monat, Feb. 2008 - Feb. 2009

    Assistant Manager (Technical)

    China National Electric Wire & Cable Imp./Exp. Corporation (CCC)

    Main tasks: Implementation of electrical equipments, Cabinet and panel wiring, Testing of tripping relays, Primary testing of different types of Transformer, Designing and editing Electrical layouts, connection scheme and single line diagram of 132/33/11kV sub-station using AutoCAD

  • 1 Jahr, Feb. 2007 - Jan. 2008

    Engineer (Coordination)

    Wintech Engineers Limited

    Main tasks: Divisional resource and project management as a coordinator of the project, Supervision of 11kv/0.415kv Transformer, overhead distribution lines and their equipments.

Ausbildung von Mohammed Amanot Ullah

  • 4 Jahre und 4 Monate, Sep. 2002 - Dez. 2006

    Electrical and Electronics Engineering

    American International University-Bangladesh (AIUB)

    • Electrical Circuits (DC & AC) • Electrical Machines (DC & AC) • Electrical Power Transmission and Distribution • Power System Analysis • Power Stations • Basic Mechanical Engineering • Microprocessor & I/O System • Electronic Devices • Industrial Electronics

Sprachen

  • Englisch

    Fließend

  • Deutsch

    Gut

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z