Mag. Vikram Gupte PMP® PSM

Angestellt, Chief Program Manager, Skoda Auto Volkswagen India Pvt Ltd

Bis 2008, Operations management, S. P. Jain Institute of Management and Research

Pune, Indien

Über mich

Head of MQB and PQ Projects Implementation and Technical Change Management at at ŠKODA AUTO Volkswagen India Private Limited.

Fähigkeiten und Kenntnisse

Program Management
Project management
New Product Development
New Product Launches
Project Implementation
AVON
TEVON
EBON
KVS
NX Unigraphics
Catia V5
Microsoft Windows 10
SAP ECC 6.0
Conflict Management
Risk Management
Projekte
Management
Change Management
MS Office
Project Coordinating

Werdegang

Berufserfahrung von Vikram Gupte PMP® PSM

  • Bis heute 3 Jahre und 11 Monate, seit Aug. 2020

    Chief Program Manager

    Skoda Auto Volkswagen India Pvt Ltd

  • 10 Monate, Okt. 2019 - Juli 2020

    Senior Manager

    Skoda Auto Volkswagen India Pvt. Ltd.

    India 2.0 Project: • Executed the parts’ feasibility followed by Make Vs Buy analysis • Tracked Target Vs Nominated investments for all parts on weekly basis for meeting the overall target and savings • Implementation Manager for the India 2.0 Notchback Project responsible for smooth launch till SOP+3 months • Tracked the status of Commitment meetings and Part Development for Notchback and Model Year cars

  • 6 Jahre und 8 Monate, Feb. 2013 - Sep. 2019

    Project Manager

    Volkswagen India Pvt. Ltd.

    Bridging Strategy, Model Year and CKD Plant Projects: • Implemented new localization potentials for Volkswagen Passat B8 and Audi (Q7, Q5, Q3, A6, A4 and A3) cars • Managed Steering of all New Projects from Germany for 1 month in January 18 and 1.5 months in February 19 • Ensured successful implementation of the prestigious PQ Bridging Strategy (2020, 2019 and 2018), Ameo (2016), Vento (2015), Polo GP (2014) and Model Year Projects within approved budget and time line of 1.5 years

  • 2 Jahre und 5 Monate, Okt. 2010 - Feb. 2013

    Program Manager

    Lear

    • Program Manager; managed up to 7 new seat programs within specifications, timeline and allocated budget • Managed tooling costs within the allocated budget of $ 9.0 Mio for these projects • Worked in coordination with suppliers for completion of IMDS and MMA activities for production readiness • Generated proposals and executed various cost savings ideas to bring annual savings of $ 450000 in 2011-12

  • 2 Jahre und 10 Monate, Jan. 2008 - Okt. 2010

    Supply Chain Management Consultant

    L&T Infotech

    • Acted as Offshore Lead; drove the SAP implementation project for L&T subsidiary TAMCO in Malaysia • Structured and conceptualized process repository for implementing solution at client end for up to 80% readiness • Ensured utilization of SCOR modelling, ARIS and SAP SolMan for Business Process Management of Make to Stock and Made to Order manufacturing strategies • Recognized and created a readymade solution fitting to 70% client requirement

  • 2 Jahre und 1 Monat, Sep. 2004 - Sep. 2006

    Engine Design Engineer

    General Motors Technical Center India

    • Reduced Product Lifecycle by 1.5 years by using Team Centre Engineering and UG-NX3 • Worked closely with General Motors, North America, Europe and Australia for the development of new engine programs • Performed Tolerance Stack analysis that gave critical inputs for change in the Product Design

  • 11 Monate, Nov. 2003 - Sep. 2004

    Materials Engineer

    John Deere

    • Managed a 12 members team in raw material replacement of timing gear cover leading to savings of INR 3,000,000 annually • Exceeded savings by INR 2,000,000 annually through execution of various cost reduction projects

  • 1 Jahr und 5 Monate, Juli 2002 - Nov. 2003

    Design Engineer

    Bharat Forge Limited

    • Contributed in ‘First Time Right’ design of a crankshaft leading to generation of 3 additional orders from the same OEM for development and production • Played a key role in Die Index Analysis of connecting rod dies leading to cycle time reduction by 15% • Imparted 5S Training to shop floor employees leading to increase in production time by 4% • Managed yield improvement projects by optimizing the raw material flow using 3D Deform

Ausbildung von Vikram Gupte PMP® PSM

  • 1 Jahr und 1 Monat, Jan. 2007 - Jan. 2008

    Operations management

    S. P. Jain Institute of Management and Research

    Operations Management

  • 3 Jahre und 11 Monate, Aug. 1998 - Juni 2002

    Mechanical Engineering

    University of Pune

    Machine Design, Strength of Materials, Dynamics of Machinery, Manufacturing Processes.

Sprachen

  • Deutsch

    Fließend

  • Englisch

    Muttersprache

Interessen

Traveling and exploring new places
Playing Cricket
Driving
Home cooking
Photography

21 Mio. XING Mitglieder, von A bis Z