Navigation überspringen

AYSE CIRDI

Bis 2020, Reservoir Engineer, Ridgeway Kite Inc
Houston, Vereinigte Staaten

Werdegang

Berufserfahrung von AYSE CIRDI

  • 1 Jahr und 2 Monate, Juni 2019 - Juli 2020

    Reservoir Engineer

    Ridgeway Kite Inc

    • Utilized Ridgeway Kite’s 6X Reservoir Simulator and NITEC LLC’s proprietary Lynx software for reservoir modeling, simulation, and project life cycle management. • Performed simulator quality testing based on client inquiries and applications in development. • Proposed software and user guide improvements with a focus on unconventional reservoir models. • Resolved client issues via testing models and providing example datasets. • Enhanced training material for delivery to clients.

  • 2 Jahre und 9 Monate, Sep. 2016 - Mai 2019

    Graduate Teaching and Research Assistant

    Texas A&M University

    • Prepared and taught computer laboratory classes based on VBA implementations, proctored exams, and graded assignments of two undergraduate Petroleum Engineering courses for four total semesters. • Performed research experiments utilizing various laboratory apparatuses used for foam generation, core flooding, and viscosity measurements.

  • 1 Jahr und 4 Monate, Mai 2017 - Aug. 2018

    Petroleum Engineer – Underwriting Intern

    Munich Re (Group)

    • Prepared technical docs and interactive calculation sheets for petrophysical data gathering, material balance assessment, horizontal well flow sensitivity analysis, and well testing and formation evaluation. • Proposed updates to internal technical procedures on analog well selection for reserves. • Participated in meetings with collaborators and potential clients. • Performed decline curve analysis for economic forecast studies • Evaluated field and well information via two oil and gas databases.

  • 7 Jahre und 8 Monate, Juli 2007 - Feb. 2015

    Reservoir Engineer

    Halliburton

  • 2 Jahre und 1 Monat, Aug. 2006 - Aug. 2008

    Graduate Research Assistant

    Penn State University

    • Developed a methodology for reservoir simulation of an oil reservoir that extensively deals with geomechanical aspects coupled with reservoir depletion. • Performed sensitivity analysis of the effecting parameters and proposed it as a system for depletion analysis of an oil field.

Ausbildung von AYSE CIRDI

  • 5 Jahre, Sep. 2016 - Aug. 2021

    Petroleum Engineering

    Texas A&M University

  • 2 Jahre und 1 Monat, Aug. 2006 - Aug. 2008

    Petroleum Engineering

    Pennsylvania State University

  • 3 Jahre und 10 Monate, Sep. 2002 - Juni 2006

    Petroleum Engineering

    Middle East Technical University

Sprachen

  • Türkisch

    Muttersprache

  • Englisch

    Fließend

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z