Navigation überspringen

Bernd Beier

Angestellt, Process Engineer, Freudenberg Sealing Technologies GmbH
Schwalmstadt, Deutschland

Fähigkeiten und Kenntnisse

fundierte praxisnahe Erfahrungen in der Elastomerv
Projektmanagement
Projektplanung
Project Management Office

Werdegang

Berufserfahrung von Bernd Beier

  • Bis heute 8 Jahre und 3 Monate, seit Apr. 2017

    Process Engineer

    Freudenberg Sealing Technologies GmbH

    Main Tasks • Improvement and redesign of existing production processes • Independent implementation of projects, proof of target achievement • Planning and realization of new manufacturing processes and production equipment • Overall support of the assigned value stream (CIP, cost cards) Main projects: • Introduction of 4 cavity manufacturing concept in combination with a valve gate cold runner, ongoing. Goal: Increase material efficiency • Roll Out Single Cavity Net Shape Process

  • 7 Jahre und 7 Monate, Sep. 2009 - März 2017

    Project Manager - Process Development

    Merkel Freudenberg Fluidtechnic GmbH

    Main tasks • Advance development of new production technologies and further development of existing technologies • Planning and realization of new mold concepts • Improvement of existing production processes, • Participation in strategic and operational planning Main projects: • Introduction of a single cavity net shape process • Development and introduction of a new variant of the Injection Compression Molding process • Analysis of the process suitability of a low-cost Compression Molding press

  • 3 Jahre und 11 Monate, Okt. 2005 - Aug. 2009

    Manager Industrialization

    Merkel Freudenberg Fluidtechnic GmbH

    Main tasks • Industrialization of new processes, products, and materials • Responsible for the standards in the manufacturing and tooling concepts and their further development • Ensure process and tooling knowledge • Creation and implementation of the technology roadmap Main projects: • Development of a small series manufacturing concept • Procurement, installation and transfer of a TPU production cell for China

  • 2 Jahre und 7 Monate, März 2003 - Sep. 2005

    Production Manager Business Unit Elastomer

    Merkel Freudenberg Fluidtechnic GmbH

    Main tasks • Technical, organizational and personnel management • Ensuring cost-effective and timely production at an important level of quality • Optimization of quality and costs • Optimization of the manufacturing processes used in series production • Planning, leadership, and qualification of subordinate staff • Collaboration in the implementation of projects, as well as the further and new development of processes • Collaboration in operational and strategic planning • Budget responsibility

  • 1 Jahr und 1 Monat, Feb. 2002 - Feb. 2003

    Manager Industrial Engineering and Process Engineering

    Merkel Freudenberg Fluidtechnic GmbH

    Main tasks • Technical and disciplinary management of project engineers in the department of engineering technology • Implementation of projects for the optimization of production processes, procurement of machinery and equipment within the approved investment budget • Investment planning and control of investments

  • 1 Jahr und 7 Monate, Juli 2000 - Jan. 2002

    Production Engineer

    Merkel Freudenberg Fluidtechnic GmbH

    Main tasks • Procurement of machinery and equipment within the scope of defined projects based on investment planning • Economic feasibility studies Main projects: • Installation of a manufacturing cell consisting of two injection molding machines and a Kuka robot

  • 2 Jahre und 6 Monate, Jan. 1998 - Juni 2000

    Production Engineer

    Pneumant Reifen GmbH

    Main tasks • Production support: process optimization, Approvals of the compound batches for the following processes • Specification and optimization of the process parameters for the mixing units and peripherals • CIP regarding productivity and quality • Preparation of working and testing instructions Main projects: • Installation of new silo units for carbon black and Silica incl. transport lines by air • Installation of new controls for the mixing units • Installation of new production lines

  • 2 Jahre und 9 Monate, Apr. 1995 - Dez. 1997

    Project Engineer

    WEGU GmbH & Co. KG

    Main tasks • Process optimization, introduction of new products or product changes (APQP) • Economic feasibility studies • Enquiry processing incl. calculations • Develop manufacturing processes • Project Manager and Coordinator Advance Quality Planning • Implementation of continuous improvement projects

  • 2 Jahre und 4 Monate, Dez. 1992 - März 1995

    Process Engineer

    WEGU GmbH & Co. KG

    Main tasks: • Optimization of injection molding processes, hot and cold runner systems with and without inserts, also made of silicone rubber • Process optimization of metal part pre-treatment of the technical rubber department (degreasing, blasting, coating) • Use of the DEAS measuring system for production optimization • Sampling of prototype and series tools

Ausbildung von Bernd Beier

  • Technologie der Elastomerverarbeitung

    Ingenieurschule Fürstenwalde (Spree)

Sprachen

  • Deutsch

    Muttersprache

  • Englisch

    Gut

  • Russisch

    Grundlagen

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z