Berufserfahrung von CUMA SARI
- 2 Jahre und 3 Monate, Aug. 2018 - Okt. 2020
Mechanical Engineer
Maire Tecnimont S.P.A
MECHANICAL PIPING SUPERVISOR I've worked on a lot of big, hard projects around the world. and I gained valuable knowledge and experience. I've worked with people from very different countries is my experience. OIL & GAS & LNG & POWER PLANT. my experience is very high I am. Pipe Spool Fabircation and Erection SUPERVİSOR I am Hydor & Pneumatic Test SUPERVİSOR I Can Work Anywhere in the World Respects
- 1 Jahr und 11 Monate, Mai 2016 - März 2018
Mechanical Piping Supervisor
REGA JV. Renaissance Heavy Industries Construction
Project : YAMAL SPG. LNG – 1 - PROJECT /RUSSİA Client : YAMAL SPG LNG- 1 JOB RESPONSIBILITIES: • The main responsibility is to organize and manage the test team on the field • Supervision of all piping works and ensures safety and quality standards. Fabrication & Erection of Piping Works. Hydrostatic and Pneumatic Testing. • 1400 test packages were made and delivered safely.
- 2 Jahre und 1 Monat, Jan. 2014 - Jan. 2016
Mechanical Piping Supervisor
ENKA A.S Construction & Industry Engineering for a better future
Suleymaniyah Combined Cycle Power Plant Project- Suleymaniyah/IRAQ JOB RESPONSIBILITIES: • Supervision of all piping works and ensures safety and quality standards. • Fabrication and erection ACC/CS Piping (302 tons). • Fabrication and erection of Water Treatment Plant C.C. Piping (25 tons). • Erection of STG Large Bore (P91) piping (2275 Tons). • Fabrication and erection Small Bore C.C/CS/P91/Piping (27000 meters).
- 3 Jahre und 11 Monate, Feb. 2010 - Dez. 2013
Mechanical Piping Supervisor
Tecnicas Reunidas/ ENKA A.S Construction Industry Engineering
Project : Refinery Hydroprocessing Expansion Project- Khabarovsk/Russia Client : Alliance Oil Company/Tecnicas Reunidas JOB RESPONSIBILITIES: • Main responsibility to supervise pipe fabrication and Erection teams on the field • Fabrication & erection of all piping works (9000 tons Pipe) without LTA. • Controlling Piping Works according to Quality Standards. • Hydrostatic Testing and Pneumatic Testing. • 915 test packages were made and delivered safely.
- 5 Jahre und 7 Monate, Apr. 2004 - Okt. 2009
Mechanical Piping Supervisor
BECHTEL JV. ENKA A.S Construction & Industry Engineering for a better future
Project : Sakhalin II Phase 2 Project, Onshore Processing Facility Client : Sakhalin Energy Envesment Company/RUSSİA JOB RESPONSIBLITIES: • Fabrication & erection of all piping works without LTA. • Controlling piping works according Quality Standards. • Hydrostatic Testing and Pneumatic Testing. • 1620 test packages were made and delivered safely.
- 1 Jahr und 9 Monate, Juni 2002 - Feb. 2004
Mechanical Piping Supervisor
MITSUBISHI JV. ENKA A.S Construction Industry Engineering for a better future
Project : AEB Power Plant Project, Kahramanmaras/TURKEY Client : EUAS/Turkey JOB RESPONSIBLITIES: • Piping erection (P91-P22-P11-CC-CS)(Between Boiler and Turbine Main Steam Lines ) works without LTA. • Controlling piping works according Quality Standards.
- 7 Jahre und 3 Monate, März 1995 - Mai 2002
Mechanical Piping Supervisor
BECHTEL JV. ENKA A.S Construction & Industry Engineering for a better future
Project : Refurbishment of the existing Sulphur Recovery Unit 2.1 & 2.2 and LPG Unit Client : TENGIZ OL/ KAZAKHSTAN JOB RESPONSIBLITIES: • Controlling piping works according Quality Standards. • Erection of all support and piping works. • Preparing shutdown for tie-in points. • Hydrostatic Testing and Pneumatic Testing. • 1310 test packages were made and delivered safely
- 2 Jahre und 1 Monat, Jan. 1993 - Jan. 1995
Mechanical Piping Foreman
ENERKAL A.S Construction & Industry Engineering
Project : Hydroelectric Power Plant Project/MERSIN/TURKEY JOB RESPONSIBLITIES • Fabrication and erection of all Mechanical Piping and support works without LTA.
- 1 Jahr und 1 Monat, Jan. 1991 - Jan. 1992
Mechanical Piping Foreman
BELELI C.P.E. JV NUOVA CIMIMONTUBI
Company : BELELI C.P.E. JV NUOVA CIMIMONTUBI S.p.A. Project : Arak Refinery Project/IRAN JOB RESPONSIBLITIES • Fabrication and erection of all piping works without LTA. • Erection of all support and piping works. • Preparing shutdown for tie-in points.
- 2 Jahre, Jan. 1989 - Dez. 1990
Pipe Fitter Lead Head
AMEC FOSTER WILLER/ WOOD
Project : Revision and Rehabilitation Crude Oil Rafinery Project, ARUBA JOB RESPONSIBLITIES • Fabrication&Erection of all Piping Works without LTA. • Erection of all support and piping works. • Preparing shutdown for tie-in points
Ausbildung von CUMA SARI
- 5 Jahre und 4 Monate, Juni 1999 - Sep. 2004
MECHANICAL ENGINEER
K.Zhubanov Aktobe Regional State University Kazakhstan/ AKTOBE
Bachelor Degree, MECHANICAL ENGINEER K.ZhubanovAktobe Regional State University Kazakhstan/ AKTOBE
Sprachen
Englisch
Fließend
Russisch
Fließend
Türkisch
Muttersprache
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.