Senior Technical Consultant
Kasra Industrial Coating & Lining Co.
Responsibilities include providing practical, technical, and economical solutions to corrosion control, coatings and linings issues. The specific duties vary from project management, litigation support, failure investigations and analysis, inspection and applicator training, in process coatings inspections, condition assessment, and business development.
- 2 Jahre, Sep. 2016 - Aug. 2018
Project Manager
Moshanir Power Engineering Consultant
Audit, Review, Develop & Approval of contractor’s design, material selection, drawings, construction, purchasing, installation & commissioning documents/procedures, QA/QC Plans, ITPs, Invoices & etc. Monitor project time schedules and capital cost budget on project to satisfy the client as well as construction control. Ensure all work (engineering, procurement & construction) meets the contract specifications and standard of excellence. Prepare effective work plans and man-hour budgets as per client request
- 1 Jahr und 5 Monate, Mai 2015 - Sep. 2016
Technical Inspector
Lloyd-Alman, Third Party Inspection Company
Technical inspection of all manufacturing steps (A-Z) of 200 different Industrial Pumps of South Pars Project, Phase 20 & 21 as per API 610 standard & client ITP includes: Single-Stage Overhung (OH), Between-Bearings (BB2, BB3), Vertically Suspended Pumps (VS1) pump types in Iran Industrial Pump (IIP) factory.
- 5 Monate, Jan. 2015 - Mai 2015
Residence Technical Inspector in China
IHTI -Third Party Inspection Company (Client: GMI Projects Homburg)
Technical inspection of all (A-Z) fabrication stages of Rotary Kiln& Dryer Kiln from raw material up to marking & packing in CITIC Heavy Industries in China,Luoyang. Technical inspection of all (A-Z) fabrication stages of Stacker & Recliamer from raw material up to marking & packing in Northern Heavy Industries in China, Shenyang, www.nhi-group.com. Review & verify fabrication and inspection records and final documentation for all above mentioned equipment that was fabricated in different contract’s shop.
- 4 Jahre und 9 Monate, Apr. 2010 - Dez. 2014
Fabrication Manager
Zolal Iran
Prepare tender documents, audit of all subcontractors capabilities & technical/commercial offers, select winner, Managing fabrication & inspection activities of 5000 tons Steel structure, More than 400 of different type (Centrifugal, Dosing, Submersible, Screw& Mono) pumps , 20 Cartridge filters,150 Pressure vessels with lining,20 Storage tanks, Pipe spools, Heat exchangers, Skid mounted packages and other Fajr I & II Petrochemical, Iran LNG, Persian Gulf Star Refinery & South pars phases: 9&10,12,19,20&21
- 4 Jahre und 3 Monate, Jan. 2006 - März 2010
QA/QC Manager
Zolal Iran
Preparation, review and approval of tests and QA/QC documents/ procedures : QA/QC Plans, ITP, WPS, PQR, WQT, Weld Map NDT Map ,Performance test, Coating & Lining, Hydro test, HSE, Material Traceability, Packing, Marking & Shipping, NDT, etc. Establish the project quality management system including project quality management strategy, plan and procedures for about 20 different industrial & urban projects. Develop organization department’s procedures with ISO 9001-2000 Inspection of all construction stages.
- 2 Jahre und 10 Monate, Sep. 2002 - Juni 2005
Technical Inspector
Farab
Inspection & supervision of all fabrication steps of hydro electrical power plant's component (12* 250 MW units) including: Francis turbine parts: Runner, shaft, distributor, wicket gates, heavy butterfly valves, draft tube, head cover, sealing ring & etc. Generator Parts;:Stator Frame, Rotor Spider Arm, Main shaft, Rotor Hub, Lower & upper bracket arms & etc Hydromechanical gates. Overhead Cranes (70 up320 Tons) Pipe & fitting, Gate-Check-Globe-Butterfly valves, Pipe & Fittings, Bolt & Nuts (1/2 up 56 in)
- 1 Jahr und 4 Monate, Mai 2001 - Aug. 2002
Quality Engineer
Mangan Manufacturing Co.
Inspection of all fabrication& installation steps of offshore cranes, RTG cranes, stackers, reclaimers, blowers & fans Participate in contractor’s material selection process to ensure that the selection are in line with client project specification& relevant standards. Preparation of different quality documents: ITP, WPS, PQR, Weld & NDT MAP, final book, coating & painting, material traceability, packing, marking & shipping, and NDT procedures. Developed the Static & Dynamic Balance test equipment in shop
Sprachen
Englisch
Fließend
Deutsch
Grundlagen
Persian
-
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.