Jindrich Popelka

Angestellt, Electrical Engineer/Secondary technician, TenneT TSO GmbH
Bayreuth, Germany

Fähigkeiten und Kenntnisse

Ruplan EVU 4.6 - 4.8
Ruplan LOCO
Engieneering Base
MS-Office-Programme
E3 Cable
PLC
PLC Programming
Siemens Step 7

Werdegang

Berufserfahrung von Jindrich Popelka

  • Current 6 years and 2 months, since Apr 2020

    Electrical Engineer/Secondary technician

    TenneT TSO GmbH

    Planning of secondary technical facilities for insulated switchgear in conventional technology or in control technology in the subtransmission voltage level 20kV bis<380kV. Creation of customer-friendly approval documents in CAE-Tool, RUPLAN EVU, Enginieering Base, taking into account the different customer requirements and compliance with all applicable regulations DIN/VDE, IEC, EN and safety regulations. Drawing plans of circuit breakers, disconnectors, earthing switches.

  • 10 months, Jun 2019 - Mar 2020

    Maintenance Technician/ Elektrician

    keipp elektro-bau-technik GmbH

    Wiring, motors, pumps, control components, switchboards, PLC (Siemens), lighting. Preparation of cables and cable routes

  • 3 years and 4 months, Feb 2016 - May 2019

    Electrical Engineer/Secondary technician

    SII Technologies GmbH

    Planning of secondary technical facilities for SF6 gas-insulated switchgear in conventional technology or in control technology in the subtransmission voltage level 60kV bis<170kV. Creation of customer-friendly approval documents in CAE-Tool, E³ Cable, RUPLAN EVU, Enginieering Base, taking into account the different customer requirements and compliance with all applicable regulations DIN/VDE, IEC, EN and safety regulations. Drawing plans of circuit breakers, disconnectors, earthing switches.

  • 6 years and 9 months, Jan 2008 - Sep 2014

    Elektroplaner/Secondary technician

    Technodat Elektro s.r.o

    Elektrical designer Digitizing of power station, VVN 400, 220, 110, 22 kV. Repair database, support customers.

  • 2 years and 9 months, Sep 2004 - May 2007

    Control equipment technician

    EDTS ZLÍN

    Machines electrical maintenance. Automatization control system - Siemens

  • 1 year and 11 months, Jun 1998 - Apr 2000

    Control equipment technician

    AŽD PRAHA

    Electrical installation of automatization equipment for traction. Assembly and comissionig of relays stations.

  • 2 years and 9 months, Oct 1995 - Jun 1998

    Control equipment technician

    Minas Uherské Hradiště

    Electrical installation in the building, safety equipment, preparing of drawings documentation.

  • 3 years and 3 months, Aug 1992 - Oct 1995

    Control equipment technician

    EŽ PRAHA

    Assembly on the traction equipment, control isolating switch, circuit closer, circuit breaker, lighting.

Ausbildung von Jindrich Popelka

  • 4 years and 10 months, Sep 2002 - Jun 2007

    Engineering Informatics

    Tomas Bata University in Zlin

    Automatic Control and Informatics

  • 1 year and 10 months, Sep 1992 - Jun 1994

    Control equipment technician distributing manifold with sight on power supply

    SOUS Zetor Brno, Brno

  • 2 years and 10 months, Sep 1989 - Jun 1992

    Control equipment technician distributing manifold

    SOU VS Brno, Brno

Sprachen

  • English

    A1-A2 (Grundkenntnisse)

  • German

    A1-A2 (Grundkenntnisse)

  • Czech

    C2 (Verhandlungssicher / Muttersprachlich)

  • Slovak

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z