Luis Enrique Martínez Chapa

Bis 2004, Process Engineer, Sanmina SCI Cable Systems
Guadalupe, Mexiko

Werdegang

Berufserfahrung von Luis Enrique Martínez Chapa

  • 2004 - 2007

    Manufacturing Shop and Operations Manager

    General Electric Drives America, S.A. de C.V.

    Departamento: Producción - Calidad, Prodn: Define the prod. plan with the team, define the balance and follow the performance Labor contract (rules, penalties, vacations, absent) Eng.: Lean Mfg. Leader Eng. changes follow up Coordinate NPI, Cost red. projects, capital investment, projects (Six Sigma) Maint. and Quality: T. Hunt Leader (utilities red.) Keep the tracking of all customer complaints Follow up of ppm (Int. & Ext., create action plans) CAR to suppliers Prev. and Corr. Maint. follow up Cost red. p

  • 2004 - 2004

    Process Engineer

    Sanmina SCI Cable Systems

    Departamento: Producción - Calidad, Technical support to the shop (Product Spec., Tools design, Std. Times, Balancing of lines). Coordinate the NPI Creation of the manufacturing instructions. Following of Productivity, Scrap, line fill on the lines in charge (Create Action Plans on lines out of goal). Resp. of the training on the shop (operators & supervisors). Resp. of following corr. actions caused by defects in process, Int. & ext. audits and cust. complaints PFMEA leader. Lean Mfg. activities

  • 2000 - 2004

    Manufacturing Superintendent (fabrication and assembly)

    Schneider Electric

    Departamento: Producción - Calidad, Prodn: Define and achieve the prodn plan for 12 lines based on forecast and history sales, defining the headcount follow the performance and be the primary resp. to the strategy goal (safety, efficiency labor, scrap, customer service, Defect per Million). Mfg.: Coordination (project leader) with different plants (US, Mexico & Canada) of transfer lines & products (4 different lines transferred). Cost red. proj., capital investment, improvement projects (Lean Mfg) Labor co

  • 1998 - 2000

    Process/Product Engineer

    Servicios de Manufactura de Monterrey

    Departamento: Producción - Calidad, Technical support to the shop (Product Spec., Tools design, Std. Times, Balancing of lines). Coordinate the NPI Creation of the manufacturing instructions. Following of Productivity, Scrap, line fill on the lines in charge (Create Action Plans on lines out of goal). Resp. of the training on the shop (operators & supervisors). Resp. of following corr. actions caused by defects in process, Int. & ext. audits and cust. complaints PFMEA leader. Lean Mfg. activities

  • 1997 - 1998

    Project Engineer

    LTH

    Departamento: Producción - Calidad, Technical support to the shop ( Standard Times, Balancing of lines, ).

Ausbildung von Luis Enrique Martínez Chapa

  • 1992 - 1997

    U.A.N.L.

Sprachen

  • Spanisch

  • Englisch

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z