
Ing. Luis Díaz López
Suchst Du einen anderen Luis Díaz López?
Werdegang
Berufserfahrung von Luis Díaz López
- 4 Jahre und 3 Monate, Apr. 2017 - Juni 2021
Director
National Institute for Silicosis
- 1 Jahr, Sep. 2015 - Aug. 2016
Senior Project and Commercial Manager
thyssenkrupp Airport Services, S.L.
• Responsible for Commercial and Project Management areas of the UK Branch. Installation, refurbishment and maintenance projects of Passenger Boarding Bridges for aircrafts in the UK and Ireland Airports (Heathrow, Gatwick, Birmingham, Cork, Stansted and Edinburgh): - Responsible for costing, planning and delivery of projects. - Responsible for changes in the design. - Responsible for tenders and customers relationship management. - Responsible for managing clients contracts under NEC3 contracts.
- 1 Jahr und 10 Monate, Sep. 2011 - Juni 2013
Project Manager / Project Engineer
Ingeniería Trading, S.L.
Responsible for construction of the new manufacturing plant for SAMOA Industrial, S.A. - Plan and design site infrastructure. - Supervise and coordinate contractors. - Provide changes in design. - Mantain budget and schedule. - Quality control. Project engineer for new manufacturing plants for Asturiana de Zinc, S.A. and ThyssenKrupp Elevator, S.L. - Design of steel and concrete structures. - Design of foundations. - Retaining walls. - Earth movements. - Budgets. - Tenders.
- 2 Jahre und 10 Monate, Sep. 2008 - Juni 2011
Project Manager / Site Manager
Mieres City Council
- Responsible for civil works in a city council: roads, water supplies, sewage networks, parks, foundations, buildings and retaining walls. - Site management. - Quality control. - Control schedule. - Supervise contractors. - Provide changes in design. - Control budget. - Control scope
- 1 Jahr und 4 Monate, Mai 2007 - Aug. 2008
Project manager / Project Engineer
Ingeniería Trading, S.L.
Responsible for construction of the new manufacturing plant for RIOGLASS SOLAR I y II - Plan and design site infrastructure. - Supervise and coordinate contractors. - Provide changes in design. - Mantain budget and schedule. - Quality control. Project engineer for new manufacturing plants for Asturiana de Zinc, S.A. and ThyssenKrupp Elevator, S.L. Design of steel and concrete structures. - Design of foundations. - Retaining walls. - Earth movements. - Budgets. - Tenders.
- 1 Jahr und 2 Monate, März 2006 - Apr. 2007
Shift Engineer - Tunnel
GEOTUNEL, S.L.
- Coordination of tunnelling excavation work (drilling, blasting, loading) - Temporary support with shotcrete, steel arches, bolts and forepoling.
- 8 Monate, Aug. 2005 - März 2006
Project Manager Safety Galleries
DRAGADOS, S.A.
Responsible for tunnel works of safety galleries in Le Perthus Tunnel (LAV Spain-France) - Plan and design site infraestructure. - Plan schedule. - Engage. - Supervise and coordinate contractors. - Blasting. - Coordination of galleries excavation works.
- 1 Jahr und 4 Monate, Mai 2004 - Aug. 2005
Land Surveyor
EPSA Internacional, S.A.
Design and as-built survey for railway and road construction projects. - Measurement. - Collection and process of data. - Use of GPS and conventional methods.
Ausbildung von Luis Díaz López
- 3 Jahre und 1 Monat, Sep. 2008 - Sep. 2011
Civil Engineering
University Alfonso X el Sabio
- 4 Jahre und 1 Monat, Feb. 2000 - Feb. 2004
Mining engineering
School of Mines at the University of Oviedo
- 3 Jahre und 4 Monate, Sep. 1996 - Dez. 1999
Mining engineering
School of Mines at the University of Oviedo
Sprachen
Englisch
Fließend
Französisch
Grundlagen
Deutsch
Grundlagen
Spanisch
Muttersprache
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.