
Markus Rothschedl
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Markus Rothschedl
- Bis heute 6 Jahre und 4 Monate, seit Mai 2019
Well Delivery Department
OMV
- 1 Jahr und 2 Monate, März 2018 - Apr. 2019
Sabbatical leave due to private reasons.
N/A
- 3 Jahre und 10 Monate, Mai 2014 - Feb. 2018
Drilling & Workover Department (Cairo, Egypt)
PetroAmir/PetroSafwa (NPIC - North Petroleum International Company)
Drilling & Workover department in PetroAmir/PetroSafwa, which are JVs between NPIC & EGPC.
- 2 Jahre und 2 Monate, März 2012 - Apr. 2014
Drilling & Workover Department (Cairo, Egypt)
PetroAmir/PetroSafwa (Vegas Oil & Gas)
Drilling & Workover department in PetroAmir/PetroSafwa, which are JVs between Vegas Oil & Gas & EGPC.
- 3 Jahre und 4 Monate, Nov. 2008 - Feb. 2012
Drilling (Operations) Department-International Operations (Hamburg, Germany)
RWE Dea AG
Focal point for international drilling activities; developing standards for drilling related topics; implementation of company integrated DDR system in the OPCOs; reviewing & working on field development plans for operations in Algeria, Egypt, Norway, UK; supporting exploration team; supporting project team for Denmark in drilling related topics, temporary based in Cairo, Egypt to gain offshore experience in the Nile delta offshore; first exploration well planning offshore Azerbaijan.
- 2 Jahre, Nov. 2006 - Okt. 2008
Field Drilling Operations (Libya)
RWE Dea AG - NAME - Libya Branch
In-field support during the move in/rig up of all drilling rigs; road construction as well as patch construction; field safety; road signs; logistics for up to 7 rigs; casing & cementing operations on nearly all the wells drilled during these 2 years; fishing operations; part time tender preparation and evaluation in Tripoli office; second half of assignment: (night) drilling supervisor.
- 10 Monate, Jan. 2006 - Okt. 2006
Drilling (Operations) Department (Cuxhaven/Hamburg, Germany)
RWE Dea AG
Started w/ running 7" liner on MPA19. Planning & execution of MPA20. First well w/ newly installed rig T150 & longest well after 25 years of drilling at that time. First run in Germany of casing drilling equip. to ream casing to bottom (combined 9 5/8" x 10 3/4" string). Preparations for casing drilling in future. First time using cutting bed impeller & using cutting material balance for proper hole cleaning control. Assisting with casing running & cementing operations.
Ausbildung von Markus Rothschedl
- 2005 - 2005
Petroleum Engineering
NTNU (Norwegian University of Science and Technology) - Trondheim (Norway)
Drilling Engineering, Offshore Drilling Technology, Well Control Applications, Drilling Fluids Engineering, Production Engineering
- 1999 - 2005
Erdölwesen / Petroleum Engineering
Montanuniversitaet Leoben (Austria)
Bohrtechnik / Drilling Engineering; Master Thesis: Drilling problem analysis in the Mittelplate field with solution proposals for future wells.
Sprachen
Englisch
Fließend
Deutsch
Muttersprache
Italienisch
Grundlagen
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.