Navigation überspringen

Ing. Reynaldo C. Cuadros

Bis 2017, Siemens T3000 DCS I&C Engineer (TA Controls), SIEMENS
Bis 1993, Automation & Industrial Electronics, TECSUP Institute of Technology
LIMA, Peru

Fähigkeiten und Kenntnisse

Power plants
Power Generation
Renewable Energy / Renewable Power
Gas Turbines
Commissioning

Werdegang

Berufserfahrung von Reynaldo C. Cuadros

  • 4 Monate, März 2017 - Juni 2017

    Siemens T3000 DCS I&C Engineer (TA Controls)

    SIEMENS

    Siemens T3000 I&C Commissioning

  • 3 Monate, Jan. 2016 - März 2016

    T3000 Dcs Commissioning Supervisor

    SIEMENS

    • Responsible for commissioning of control system Siemens T3000. • Installation of UPS, Application Servers, Thin clients, KVM, Profibus Cable, Ethernet cable. • Energize of cabinets: CRY(communications), CRK(controllers), CRB(input/output) • Perform Startup/shutdown of T3000 DCS, Troubleshooting on T3000 • Function Logic implementation and modification, configurations, forcing. • Carried out the Loop Testing of analog and digital signals

  • 8 Monate, Okt. 2012 - Mai 2013

    I&C Commissioning Engineer

    SIEMENS/ NES

    • Performed Erection and Commissioning of the Instrumentation & Control of SGT6-5000F4 Siemens Turbine rated at 200MW.

  • 2 Jahre und 2 Monate, Juni 2008 - Juli 2010

    Power Plant operations Supervisor

    Enersur GDF Suez

    • Provided Support during I&C commissioning and start-up of the SGT6-5000F gas turbine rated at 180MW. • Responsible for operation from the Control of two (2) SGT6-4000F Siemens Gas Turbines (V84.3A) each rated at 180 MW, running by the SPPA-T2000 (Teleperm XP) Control System. • Responsible for operation of a SGT6-5000FD Siemens Gas Turbine (W501F) rated at 190 MW, running by the SPPA-T3000 Control System.

  • 4 Jahre, Jan. 2003 - Dez. 2006

    Power Plant operations Supervisor

    PIC Energy Group

    • Operated from the Control Room of two GT11NMC ABB-Alstom Gas Turbines, rated at 86 MW, running by the Egatrol 300 DCS control system. • Made Improvements and troubleshooting problems on the DCS MOD 300 • Provided Support during the Compressor upgrade to improve the efficiency from 78Mw to 86 Mw per turbine. • Carried out preventive maintenance program on main and auxiliary systems of engines • Coordinated with maintenance staff the Minor, Hot Gas Path, and Major Inspections.

  • 5 Jahre und 3 Monate, Okt. 1997 - Dez. 2002

    Power Plant operations & Maintenance Supervisor

    Duke Engineering & Services ( a Duke Energy Company),

    • Worked with ABB vendor throughout the commissioning and start-up of Power Plant Project. • Operated two GT11NM ABB-Alstom Gas Turbine Generators, each rated at 78 MW. • Achieved experience with DCS: ABB Egatrol Hybrid Control system: Procontrol P13 + Mod 300. • Made Improvements and troubleshooting problems on DCS: Taylor ladder logic (TLL) and Configurable Control Functions (CCF). • Carried out preventive maintenance program on main and auxiliary systems of engines

  • 8 Monate, Okt. 1996 - Mai 1997

    Instrumentation and control I&C tech

    Mining Company Iscaycruz s.a.

    • Performed preventive maintenance program on Modicon PLC´s Industrial network with Wonderware Intouch Lite Scada and its associated field instrumentation. • Carried out calibration on field instrumentation: Foxboro PH transmitters, Outokumpu and Foxboro level controllers, Endress + Hauser Level and Pressure transmitters, Fisher and Porter Magnetic Flowmeters, Amdel Nuclear Densimeters, Outokumpu Electronic ceramic Filter, Sullair air Compressor, Limitorque - Auma motorized control Valves.

  • 6 Monate, Nov. 1995 - Apr. 1996

    Instrumentation and control I&C tech

    Smelting Plant Funsur s.a

    • Provided support during Start-up and Commissioning of the Smelting Plant. • Achieved experience with Austmelt Technology for production of refined Tin. Besides worked with the Distributed Control System (DCS). • Performed configuration and calibration using loop calibrators and ABB Handheld communicators on: ABB Kent-Taylor smart Transmitters: Flow, Temperature, Pressure and Level Tx, Fisher Control Valves. Merrick Weightfeeders, Yokogawa Vortex and Magnetic Smart Transmitters.

Ausbildung von Reynaldo C. Cuadros

  • 2014 - 2015

    Project Management Certificate Program (PMP)

    Universidad Nacional de Ingenieria

  • 3 Jahre und 1 Monat, März 1990 - März 1993

    Automation & Industrial Electronics

    TECSUP Institute of Technology

    Automation, Industrial Electronics

Sprachen

  • Englisch

    Fließend

  • Spanisch

    Muttersprache

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z