Alan Salisch

Bis 2018, Lead Project Engineer, MV WERFTEN

Wismar, Deutschland

Fähigkeiten und Kenntnisse

Strong team building ethos to bring all stakeholde
International Project Management

Werdegang

Berufserfahrung von Alan Salisch

  • Bis heute 5 Jahre und 11 Monate, seit Aug. 2018

    Project Engineer, Ship Design

    MV WERFTEN

    New-build ship design from concept phase through basic design • Collaboration in the development of cruise and offshore ship concepts and general arrangements in compliance with applicable regulations, classification societies and client requirements • Preparation and evaluation of area function demarcation & statistics

  • 8 Monate, Jan. 2018 - Aug. 2018

    Lead Project Engineer

    MV WERFTEN

    Team lead engineer for “Room Responsible” engineers, public areas • Coordination/liaison between owner’s team, external architects and public area managers • Organize and lead architect, internal engineering, and public area manager meetings • Monitor and control design variation TCAs, ROMs and AOMs • Control drawing schedule and delivery for public areas

  • 1 Jahr und 1 Monat, Aug. 2016 - Aug. 2017

    Design Manager

    Frers Design + Naval Architecture

    Project team manager for high-performance bespoke sail and motor yachts. • Coordination of internal and external design and engineering teams • Liaison of external subcontractors (engineering, rig and sail design, interior design and shipyards) • Design of General Arrangements, Exterior Arrangements and Styling of new proposals • Project Management for the engineering, construction, outfit, systems and interior for 56m performance lifting-keel sloop

  • 3 Jahre und 8 Monate, Nov. 2012 - Juni 2016

    Project Manager

    Deutsche Werkstätten Hellerau

    Project management for the engineering, manufacture and installation of bespoke interiors aboard the 147 meter Sail Yacht A (Project White Pearl), built to PYC classification at Nobiskrug/ADM Kiel.

  • 9 Monate, Nov. 2012 - Juli 2013

    Design Engineering Manager

    Deutsche Werkstaetten Hellerau

    Project and engineering team management for the engineering of bespoke Interiors aboard Deutsche Werkstätten’s inaugural aviation project, a “green” OEM Boeing 737 private jet, in collaboration with Altitude Aerospace Interiors, Auckland, New Zealand.

  • 3 Jahre und 1 Monat, Juni 2009 - Juni 2012

    Head of Yacht Division

    Grupo Cándido Hermida S.L.

    Created and managed a new subsidiary luxury yacht interiors division consisting of design, project coordination, technical, production and quality control personnel. Developed and implemented an aggressive international new business strategy for the supply and installation of series and bespoke yacht interiors.

  • 4 Jahre und 2 Monate, Apr. 2005 - Mai 2009

    Senior Designer

    Farr Yacht Design

    Design of high performance production, custom and grand-prix racing yachts including competitors for the Volvo Ocean Race, Vendée Globe, Barcelona World Race and other high-profile events.

  • 10 Jahre und 4 Monate, Jan. 1995 - Apr. 2005

    Principal

    Salisch Design

    Independent design & design engineering consultancy. Project management, concept design, naval architecture, design engineering, exterior styling, interior arrangements, mechanical systems, rig & deck layout of series production and custom yachts.

  • 2 Jahre und 10 Monate, März 1992 - Dez. 1994

    Designer

    Francis Design

    Project coordination, naval architecture, exterior styling, interior arrangements, design engineering of custom yachts.

  • 4 Jahre und 3 Monate, Jan. 1988 - März 1992

    Joiner Foreman

    Renaissance Yachts

    Construction and fit-out of the Bruce King / Joseph Artese 115 ft (35 m) wood composite ketch "Signe".

  • 2 Jahre und 7 Monate, Juni 1983 - Dez. 1985

    Architect / Designer

    Raynes Associates

    Multidisciplinary Architectural, Signage, Exhibit, Graphic, Visual Identity & Branding Design.

  • 1 Jahr und 8 Monate, Jan. 1981 - Aug. 1982

    Architect

    Skidmore, Owens & Merrill

    Architecture, planning and engineering

Ausbildung von Alan Salisch

  • 4 Jahre und 10 Monate, Sep. 1980 - Juni 1985

    Architecture

    Boston Architectural College, Boston, Massachusettes

  • 1 Jahr und 10 Monate, Sep. 1977 - Juni 1979

    Business Administration

    Long Island University, Southampton, New York

Sprachen

  • Englisch

    Muttersprache

  • Spanisch

    Fließend

  • Deutsch

    Fließend

21 Mio. XING Mitglieder, von A bis Z