Dipl.-Ing. Alex Talmon-l'Armee

is available. ✅

Bis 2024, Engineer, IGAD, KfW, NIRAS
Entebbe, Uganda

Fähigkeiten und Kenntnisse

Architecture
civil engineering
disaster management
International Development
Emergency Response
Disaster Recovery
Damage Analysis
Infrastructure
Site management
Assessment
Vulnerability Assessment
Risk Management
Natural Disasters and Hazards
International Project Management
programme management
IDS/IDP
Quality Control
Monitoring
Technical Supervision
Contract Negotiation
IT
ICT
MapInfo
MS Project
Database Design
AutoCAD
cross-platform WIN&MAC
most application software
blogging (audio/video)
video conferencing
Appraisal
Construction

Werdegang

Berufserfahrung von Alex Talmon-l'Armee

  • 2 years and 5 months, Jul 2022 - Nov 2024

    Engineer

    IGAD, KfW, NIRAS

    BMZ financed, KfW managed, NIRAS implemented cross-border infrastructure projects in Djibouti, Ethiopia, Somaliland, Kenya, South Sudan and Uganda.

  • 1 year and 11 months, Oct 2020 - Aug 2022

    Senior Director Technical Engineering

    NIRAS

    IFE financed by KfW for 8 African countries. Côte d‘Ivoir, Egypt, Ethiopia, Ghana, Morocco, Rwanda, Senegal, Tunesia

  • 1 year and 7 months, Mar 2019 - Sep 2020

    Team Leader

    GOPA Infra GmbH

    GIZ financed infrastructure projects in and around Cairo, Egypt

  • 1 year, Mar 2018 - Feb 2019

    Senior Engineer - Education Sector

    European Investment Bank (EIB)

    - evaluate technical aspect of knowledge infrastructure projects in the education sector - promote the understanding of the main issues and challenges of the education sector to key decision makers in the Bank and to present the Bank’s contribution to the interested outside world, including the European Commission and other international bodies and peer groups concerned with the sector. - Prepare comparative cost studies (including methodology, strategy and sector perspectives)

  • 5 months, Oct 2017 - Feb 2018

    Team Leader – Key Expert for Infrastructure Reconstruction

    GOPA Consultants

    Technical Support (‘quick win measures’) for roads & bridges for the German Credit Facility for Iraq (KfW) to Assist the Return of IDPs: a) ReFAATO & Ministry of Construction, Housing (MoCH) to support the procurement of rehabilitation works (including bidding documents) for bridges & roads in the Nineveh Governorate (Mosul area); b) Investment Plan for Road Infrastructures for immediate implementation (~45 million Euro, first phase) and a second phase on complimentary required investments.

  • 1 year and 4 months, Jun 2016 - Sep 2017

    (re)construction specialist

    Talmon-l'Armée

  • 4 months, Mar 2016 - Jun 2016

    Technical Proposal Coordinator, Renewable Energy Proposal

    UNOPS Sierra Leone

    Gov. of Sierra Leone requested the formulation of a Renewable Energy Proposal through hybrid renewable energy sources in 50-60 rural locations, ~$60 million. - multidisciplinary team of experts - UNOPS engaged a Proposal Coordinator to lead the implementation of the pre-feasibility study. He was also the key interface with key stakeholders to ensure needs and observations are appropriately taken into account in the analysis & proposal formulation. Both the PFS and the main project are funded by DFID.

  • 4 months, Sep 2015 - Dec 2015

    STE- assessment of infrastructure needs & preparation of technical designs, PNG

    GFA Consulting Group

    Preparation of tender documents for 12 TVETs in six provinces. HRDP2, a programme of the Gov. of Papua New Guinea (PNG), funded by the European Union (EU) under the 10th European Development Fund (EDF), with a total budget of € 26 million, approx., half of which is foreseen to be spent on infrastructure, equipment and materials; overall objective is to reinforce the vocational stream of education at lower secondary level in order to promote the development of skilled labour force.

  • 3 months, Jul 2015 - Sep 2015

    Consultant Senior Engineer, Khartoum, Sudan

    UNOPS Sudan

    Technical audit of 12 infrastructure projects for UNOP’s Sustainable Infrastructure Practice Group (SIPG) A key objective for UNOPS is to be recognized as delivering world-class infrastructure even in the most challenging environments such as Sudan), where it has implemented annually USD 12.5 million.

  • 6 months, Jan 2015 - Jun 2015

    project manager; UNDP; Green ONE UN House GOUNH; Hanoi, Vietnam

    UNDP United Nations Development Programme

    The Green UN House, ~7800 m2, 6 floors, workspace for 400 people, designed and constructed in conformity with Vietnamese construction codes and highest international standards for quality control and quality assurance. Project Manager critical to ensuring that the design and construction phase of the project, including the eco-friendly and team-friendly design aspects of the UN House are realized successfully and PRINCE 2 methodology is applied.

  • 2 years, Jan 2013 - Dec 2014

    Team Leader & Rural Infrastructure Engineer; MPP9; Nigeria

    Louis Berger

    Supervise 10 civil engineers in Decentralised Management Units (DMUs) Training and maintenance of quality and standards in projects, development of standard Bills of Quantity for infrastructure work. Preparation of tender dossiers. Supervision & provisional acceptance of 764 building projects & coordination of the monitoring of infrastructure. Carrying out of regular ‘on the spot’ assessments of projects. Act as Imprest Administrator of Programme Estimate.

  • 3 months, Oct 2012 - Dec 2012

    Evaluation expert, Mid-Term Evaluation of UNRWA Medium Term Strategy; Palestine

    TRANSTEC

    Mid-Term Evaluation of the UNRWA Medium Term Strategy (MTS)

  • 3 months, Oct 2012 - Dec 2012

    Rural Infrastructure Engineer; ‘Micro Projects Programme in the Niger Delta' MPP

    GOPA Consultants

    Supervise work of engineers in Decentralised Management Units (DMUs). Training and maintenance of quality and standards in projects, development of standard Bills of Quantity for infrastructure work. Preparation of tender dossiers of all the construction contracts foreseen under the programme. Coordination of the monitoring of infrastructure in the field, regular ‘on the spot’ assessments of projects.

  • 2 months, Sep 2012 - Oct 2012

    planner; Uganda

    sabbatical

    development of private properties with housing solutions in Kampala and Fort Portal, Uganda. Including technical infrastructure such as water, electricity, sewerage; structural engineering; FIDIC red book form of contract

  • 2 months, Jul 2012 - Aug 2012

    Consultant; Malawi

    KfW

    Review of the primary education facility reconstruction programmes in Malawi

  • 6 months, Jan 2012 - Jun 2012

    planner; Uganda

    sabbatical

    research of housing market in Uganda, including technical infrastructure, WATSAN, FIDIC red book form of contract

  • 2 years and 9 months, Apr 2009 - Dec 2011

    social infrastructure; Western Balkans Infrastructure Projects Facility IPF

    WYG International

    TA to Gov. of Western Balkans (CR, BiH, SER, CG, MAC, ALB) in the social infrastructure (edu, health, penitentiary) to develop bankable projects fit for financing by an IFI. identifying projects, writing Terms of reference, identifying, and contracting and managing consultants. all project stages, i.e. pre-feasibility, feasibility, preliminary design, main design, Bill of Quantity, and tendering (FIDIC red book (design, bid, build), pink book (MDB harmonised edition), yellow book (plant and design-build)).

  • 9 months, Apr 2008 - Dec 2008

    team leader/ project manager Papua New Guinea

    LINPICO

    Team Leader for a project to 'Improve Rural Primary Educational Facilities' in three districts in three provinces in Papua New Guinea.

  • 1 year and 6 months, Oct 2006 - Mar 2008

    Head of Mission- Iraq

    International Management Group

    Head the European Commission Technical Assistance Facility - Iraq, providing TA to the European Commission's Delegation in Baghdad.

  • 2 months, Aug 2006 - Sep 2006

    Housing & Infrastructure Specialist; mid-term evaluation; Aceh, Indonesia

    italtrend

    Evaluation of the individual projects financed by the MDF ($550 million) and of their contribution to the overall reconstruction process in Aceh and Nias.

Ausbildung von Alex Talmon-l'Armee

  • 1 year and 1 month, Aug 2000 - Aug 2001

    Disaster Management

    Cranfield University

  • 4 years and 5 months, Oct 1989 - Feb 1994

    Civil Engineering

    University of Regensburg

  • 2 years, Oct 1987 - Sep 1989

    Architecture

    University of Regensburg

Sprachen

  • German

    C2 (Verhandlungssicher / Muttersprachlich)

  • English

    C2 (Verhandlungssicher / Muttersprachlich)

  • French

    B1-B2 (Gute Kenntnisse)

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z