
Dr. Alexander Beeck
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Alexander Beeck
- Bis heute 6 Jahre und 5 Monate, seit Jan. 2019
Retired, independent and curious
See me at LinkedIn.com
After nearly 18 year with Siemens Gas Turbine Engineering I decided to shift the scales of my work-life balance more towards “life”. Please find more at LinkedIn.com
- Bis heute 17 Jahre und 9 Monate, seit Sep. 2007
Director Gas Turbine Engineering
Siemens Energy Inc.
Guide technology leaders and managers relating to concepts, development, testing, and implementation of new technologies and innovations. Mentor Managers and Engineers in the Gas Turbine arena. Establish and maintain relationships to external partners in business, government, universities and research centers. Provide directions for product strategies for new engine and service engine business. Drive knowledge management and mentoring related to robust and manufacturable design.
- 6 Jahre und 6 Monate, Apr. 2001 - Sep. 2007
Head of Department for Turbine Design
Siemens Energy, Inc.
Development and Testing of Turbine Components from concept phase, through supplier selection, manufacturing development, and pre-serial production. Proven success in New Engine development and Service Upgrade products. Effective concurrent engineering with supply chain (casting, machining and coating), validation in engines (test center and at customer sites) and transfer to serial production. Development of advanced turbine designs for future engine and power plant concepts.
- 2 Jahre und 8 Monate, Juni 1998 - Jan. 2001
Head of Turbine Component Owners
Alstom Power
Development of Turbine Components from concept phase through detailed design and manufacturing development to pre-serial production. Concurrent engineering with suppliers (casting, machining and coating), testing and validation in engines (Birr test center) and transfer to serial production. Project lead of a Total Life Cycle Cost Reduction program
- 6 Jahre und 3 Monate, Apr. 1992 - Juni 1998
Component Owner (Combustor, Turbine)
ABB Power Generation
Component Manager GT26 Turbines, original and up-rated version, Responsible for Secondary Air System of GT24/GT26 Turbines. Component Manager GT24/26, High Pressure Combustor (Development), responsible for concept and design of the high pressure combustor.
Ausbildung von Alexander Beeck
- 5 Jahre und 2 Monate, März 1987 - Apr. 1992
Aero and Space Engineering
University of the Armed Forces, Munich, Germany
Turbine and Compressor Aerodynamics, Heat Transfer, Design and Testing
- 7 Jahre und 4 Monate, Sep. 1979 - Dez. 1986
Mechanical Engineering
Technical University, Darmstadt, Germany
Mechanical Design (Konstruktion), Plant Engineering, Turbomachinery
Sprachen
Englisch
Fließend
Deutsch
Fließend
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.