Navigation überspringen

Ali Mohsin

Angestellt, Project & QA/QC Engineer, Reon Energy Limited
Karachi, Pakistan

Fähigkeiten und Kenntnisse

• Health Safety & Environment Initiatives
• Project Planning & Execution
• Piping & Stationary Equipment work packages
• Budget Implementation & Cost control
• Time Management & Prioritization in High-Pressur
• Construction/Dismantling
• P&ID drawings
• Non Destructive Testing
• Piping & Equipment Inspection
• Hydro Testing
• Quality Control
• Preventive/Break-Down Maintenance
Maschinenbau
Testing
Planning
Management
pmbok
win

Werdegang

Berufserfahrung von Ali Mohsin

  • Bis heute 7 Monate, seit Dez. 2024

    Project Engineer

    TÜV Rheinland Group

    PAKISTAN STATE OIL (PSO) -Inspection, Repair, Alteration, and Reconstruction of 02Nos Tank (dia 15m, height 9.8m and dia 12m, height 9.8m) and its associated piping, according to API 653 & API 650. -Installation of 16” Euro II line from Tanks to Loading Gantry.

  • Bis heute 5 Jahre und 1 Monat, seit Juni 2020

    Project & QA/QC Engineer

    Reon Energy Limited

  • 5 Monate, Jan. 2020 - Mai 2020

    Project Engineer

    Siachen Energy Limited

  • 2018 - 2018

    Internist

    TU Dortmund

  • 1 Jahr und 3 Monate, Aug. 2015 - Okt. 2016

    Mechanical Project Engineer

    BYCO Oil Pakistan Limited

    -Worked on Planning, Budgeting, and BOQ, procurement, execution and finally closing for “Piping & Structure Loading Gantry Project”. -Worked in a team of EPCC Project of “Platformer Unit” associated with 115000 BPD refining unit, leading the work packages of Piping, furnace re-tubing, Heat Exchangers, Columns, Reactors. -Successfully conducted the fabrication, modification, erection, restatement & hydrotesting of piping test package as per Isometric drawings.

  • 10 Monate, Nov. 2014 - Aug. 2015

    QA/QC & Inspection Engineer

    BYCO Oil Pakistan Limited

    -On hand Experience of Non Destructive examination techniques i-e DPT, PMI, Hardness Testing, UT & Radiography Film evaluation. -Inspection of Plant/Offsite piping construction until hydrotesttest -Direct contractor for detailed baseline inspection of Re-tubing activity of reactant heater furnace. Including preparing work scopes, verifying welding joints, verifying NDT, Preheat, PWHT & Radiographic Films.. -Inspection of newly procured and refurbished piping material at warehouse.

  • 10 Monate, Feb. 2014 - Nov. 2014

    Mechanical Project Engineer

    Gatron Industries Limited

    Successfully designed & fabricated an instrument to calculate depth of well using air compressor, pipe& pressure gage for training program. Successfully completed the task to trace the complex pipelines of compressors (15 units) & Chillers (07 units) & AHU’s (08 Units) and developed its P&ID for training program. Supervised Maintenance/Lubrication of KSB Centrifugal Pumps, Atlas Copco Screw & Centrifugal Air compressors, Liang Chi Cooling Towers, Kukdong Chain Hoist & executed misc. fabrication Jobs.

  • Intern at Costumer support division

    Hino Motors

    Provided assistance to preventive maintenance team

  • Intern at Operations Department

    Orient Energy Systems

    Operation of 2 MW power plant (Jenbacher Genset)

Ausbildung von Ali Mohsin

  • 1 Jahr und 6 Monate, Okt. 2016 - März 2018

    Petroleum Engineering

    Technical University of Crete (T.U.C)

  • 4 Jahre und 1 Monat, Jan. 2010 - Jan. 2014

    Mechanical Engineering

    NED University of Engineering and Technology

Sprachen

  • Deutsch

    Grundlagen

  • Englisch

    Fließend

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z