Navigation überspringen

Dr. Andrea Cigada

Angestellt, Senior Vice President (SVP), Operations, Nicotra Gebhardt GmbH
Milano, Italien

Werdegang

Berufserfahrung von Andrea Cigada

  • Bis heute 10 Jahre und 7 Monate, seit Dez. 2014

    Senior Vice President (SVP), Operations

    Nicotra Gebhardt GmbH

    Operation and Purchasing director for the group • Manufacturing strategies of the group: localization, make or buy decisions, investments • Assigning targets and auditing plant results • Director of continuous improvement plans and lean implementation • Sourcing strategies of the group • Managing Plant Directors, Commodity Managers and Supply Chain Managers

  • 1 Jahr und 8 Monate, Apr. 2013 - Nov. 2014

    Industrial and Supply Chain Director

    Alstom Transporte

    Director of Industrial activities and Lean Implementation for all TLS overhauls projects in Italy (21 sites, 4 Industrial managers). Responsible of efficiency, standardization, lost time reduction, cost of non-quality reduction, Make or Buy strategy and implementation. Director of Supply Chain for Italy (5 Supply chain managers). Responsible for Inventory reduction program, procurement strategies, internal flow optimization, operations and material planning.

  • 5 Jahre und 1 Monat, Apr. 2008 - Apr. 2013

    Lean Transition Manager

    Terex Cranes

    Operation management: responsibile for lean production implementation. From February 2009: responsible for Supplier Management and Developement (SMD), implementing continuos supply base improvement process with vendors, in Zweibrucken, Germany From January 2010: Operation director of Forklift and Trucks division, Terex Port Equipment, in Reggio Emilia, Italy

  • 2 Jahre und 1 Monat, Apr. 2006 - Apr. 2008

    Plant Manager

    Rieter Automotive

    Plant manager on the two plants (Desio: 180 people, Vicolungo: 120 people) dedicated to truck business. Production of acoustic and thermal insulators. Shipment to 67 costumer plants in Europe: JIT and JIS logics implemented. Full responsability on Profit&Loss.

  • 4 Jahre und 2 Monate, Feb. 2002 - März 2006

    Plant Manager

    Mecondor

    Plant manager for the three different production lines: - components for refrigeration compressors - components for electrical accumulators - trim and form toolings for automotive industry The production lines were located in two different productive plant (Sulbiate and Vicenza). Both order-based and project-based production

  • 7 Jahre und 1 Monat, Feb. 1995 - Feb. 2002

    Project Leader

    ST Microelectronics

    Project Leader for new production lines. Team management of qualified resources on international scale. Engineering of final product and co-design of assembly. Author and co-author of 11 international patents. Responsible for benchmark and selection of external suppliers.

Ausbildung von Andrea Cigada

  • 2 Jahre, Jan. 2001 - Dez. 2002

    MBA

    MIP

    Master in Business Administration

  • 6 Jahre und 6 Monate, Sep. 1987 - Feb. 1994

    Engineering

    Politecnico di Milano

    Constructive Engineering, 100/100

Sprachen

  • Italienisch

    -

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z