Dr. Andreas Lüdeke

Angestellt, Head of Accelerator Operation, Paul Scherrer Institut
Villigen PSI, Switzerland

Fähigkeiten und Kenntnisse

particle accelerators and control systems; teachin

Werdegang

Berufserfahrung von Andreas Lüdeke

  • Current 9 years and 4 months, since Mar 2017

    Head of Accelerator Operation

    Paul Scherrer Institut
  • Current 16 years and 8 months, since Nov 2009

    Teacher at the iLab pupils laboratory

    iLab at the Paul Scherrer Institut

    Teaching secondary school classes at the iLab; guiding them to experiment in the vacuum or sound labor

  • 22 years and 10 months, Jan 2001 - Oct 2023

    Operation Manager Swiss Light Source

    Paul Scherrer Institut

    Organising the operation of the Swiss Light Source

  • 11 years and 10 months, Mar 2003 - Dec 2014

    Consultant

    Luedeke Programming and Consulting

    Consultant for accelerator control systems. Projects: Diamond Light Source Linac, Australien Synchrotron Linac; Linac of the "Physikalisch Technische Bundesanstalt" in Braunschweig; Linac for the Taiwan Light Source

  • 5 years and 8 months, May 1999 - Dec 2004

    Senior controls engineer

    Paul Scherrer Institut

    Developing controls for the Swiss Light Source: digital magnet power supply controls, user interfaces, Linac controls, etc. From 2000 on I got involved into the commissioning of the Swiss Light Source and moved more and more into organizing the operation of the facility. I was appointed as operation manager in 2001, but continued to work 25% for controls until 2004.

  • 4 years and 7 months, Sep 1994 - Mar 1999

    Accelerator physicist

    University of Dortmund

    PhD Student on efficient control of the booster synchrotron. Responsible for beam diagnostics development, controls interfaces and graphical user interfaces of the DELTA booster synchrotron BoDo.

Ausbildung von Andreas Lüdeke

  • 5 years and 3 months, 1994 - Mar 1999

    Accelerator physics

    University of Dortmund

    Development of diagnostics, controls and user interfaces for an efficient control of the DELTA booster synchrotron BoDo

  • 6 years and 1 month, Sep 1988 - Sep 1994

    Physics

    University of Dortmund

    Accelerator Physics: injection timing for the DELTA light source.

Sprachen

  • German

    C2 (Verhandlungssicher / Muttersprachlich)

  • English

    C1 (Fließend)

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z