Andres Marzal Alfaro
Angestellt, Bauleiter, HOCHTIEF
Cuenca, Spanien
Werdegang
Berufserfahrung von Andres Marzal Alfaro
1 Jahr und 8 Monate, Sep. 2019 - Apr. 2021
Construction Engineer
Dragados USA
Design and Construction Project for Gordie Howe International Bridge between Windsor, (ON, Canada) and Detroit, (MI, United States). Joint Venture: Dragados Canada-Fluor Canada-Aecon / Client: WDBA (Windsor-Detroit Bridge Authority) Budget: $5.7 billion (nominal value)
1 Jahr und 2 Monate, Aug. 2018 - Sep. 2019
Construction Engineer - Canada Bridge
Dragados - Canada
Design and Construction Project for Gordie Howe International Bridge between Windsor, (ON, Canada) and Detroit, (MI, United States). Joint Venture: Dragados Canada-Fluor Canada-Aecon / Client: WDBA (Windsor-Detroit Bridge Authority) Budget: $5.7 billion (nominal value)
1 Jahr und 6 Monate, Feb. 2017 - Juli 2018
Field Engineer
Dragados USA
Design and Construction Project for US181 Harbor Bridge Replacement at Corpus Christi, TX Joint Venture: Dragados USA-Flatiron / Client: TxDOT (Texas Department of Transport) Budget: $802 million
Sprachen
Englisch
Fließend
Spanisch
Muttersprache
Deutsch
Gut