Anıl Konak
Bis 2022, Geologist, Koza Altın İşletmeleri A.Ş.
Über mich
I first started my work experience in 2016, I worked actively for 4.5 years as a tunnel engineer and drilling engineer(including pressureometer, inclinometer, presiometer drill test) the MNG Mapa İnşaat Algeria Tlemcen High Speed ????Railway project. As the tunnel engineer, the mirror mapping in the tunnels advancing with NATM, the RMR points were calculated according to the map, and the excavation support forms were determined. After I had to leave due to the pandemic in March 2020, I started to work as an Exploration geologist at Koza Gold Enterprises in September 2020 and I have been working as a specialist geologist since July 2022. In this process, after the first research in the fields, geological mapping, soil and rock sampling, projects are developed, and metallic mineral exploration is continued by drilling.
Werdegang
Berufserfahrung von Anıl Konak
Bis heute 2 Jahre, seit Juni 2022
Project Geologist
Koza Altın İşletmeleri A.Ş.
I started to work as an Exploration geologist at Koza Gold Enterprises in September 2020 and I have been working as a specialist geologist since July 2022. In this process, after the first research in the fields, geological mapping and modelling with leapfrog program, soil and rock sampling, projects are developed, and metallic mineral exploration is continued by drilling.
1 Jahr und 11 Monate, Sep. 2020 - Juli 2022
Geologist
Koza Altın İşletmeleri A.Ş.
I started to work as an Exploration geologist at Koza Gold Enterprises in September 2020 and I have been working as a specialist geologist since July 2022. In this process, after the first research in the fields, geological mapping, soil and rock sampling, projects are developed, and metallic mineral exploration is continued by drilling.
2 Jahre und 9 Monate, Juli 2017 - März 2020
Tunnelling Engineer
MNG Holding
I first started my work experience in 2016, I worked actively for 4.5 years as a tunnel engineer and drilling engineer(including pressureometer, inclinometer, presiometer drill test) the MNG Mapa İnşaat Algeria Tlemcen High Speed Railway project. As the tunnel engineer, the mirror mapping in the tunnels advancing with NATM, the RMR points were calculated according to the map, and the excavation support forms were determined. After I had to leave due to the pandemic in March 2020.
4 Jahre und 3 Monate, Jan. 2016 - März 2020
Drilling Engineer
MNG Holding
I first started my work experience in 2016, I worked actively for 4.5 years as a tunnel engineer and drilling engineer(including pressureometer, inclinometer, presiometer drill test) the MNG Mapa Building Algeria Tlemcen High Speed Railway project. As the tunnel engineer, the mirror mapping in the tunnels advancing with NATM, the RMR points were calculated according to the map, and the excavation support forms were determined. After I had to leave due to the pandemic in March 2020