Navigation überspringen

Arvind Kumar

Angestellt, Production Engineering Manager, Varun Beverages pvt.ltd Nepal
Bareilly, Indien

Fähigkeiten und Kenntnisse

Manufacturing engineering
Production engineering
Production planning and control
Production Process
Manufacturing process
Mechanical Engineering
Lean Management
CAD
Six Sigma
Industrial Engineering
Process Optimization
production and manufacturing
Plastics Manufacture and Processing
pet preform
Injection Molding Technology
Mechanical and electrical installations
Plastics technology
Production monitoring
Production management
Process engineering
Maintenance
SolidWorks
Operations Manager
MS Office
English Language
Plant Engineering
Leadership
Responsible
Motivation
Team work

Werdegang

Berufserfahrung von Arvind Kumar

  • Bis heute 2 Jahre und 1 Monat, seit Mai 2023

    Production Engineering Manager

    Varun Beverages pvt.ltd Nepal

    I am working here as a production manager at Injection molding division or Plastics process.

  • 2 Jahre und 3 Monate, März 2021 - Mai 2023

    Production Engineer

    Brindavan Beverages pvt ltd bareilly

     I had Worked here as Production Shift In Charge Position.  I had handled here Injection Molding Machines Processing and Maintenance Work.  Mold Trial and Then Running Machines.  Solved Troubleshooting Problems of machines, and OEE Prepare.  Responsible for Mechanical and Electrical Maintenance Problems.  Utility and Machines Problems Solved, We have utility equipment (chiller, air compressor.

  • 2 Jahre und 6 Monate, Okt. 2018 - März 2021

    Production Supervisor

    Flexituff Ventures International ltd

    • I had Worked here as Production Shift In Charge Position. • I had handled here NETSTALL Injection Moulding Machines and Husky Mould and Accessory. • I handled here Injection Moulding Machines Processing and Maintenance Work. • Mould Trial and Then Running Machines. • Solved Troubleshooting Problems of machines, and OEE Prepare. • Responsible for Mechanical and Electrical Maintenance Problems. • Utility and Machines Problems Solved, We have utility equipment (chillers, air compressor etc.

  • 4 Jahre und 3 Monate, Feb. 2014 - Apr. 2018

    Product Engineer

    Finolexcables.Ltd

    • I had Worked there as Production Shift Engineer. • Responsible for the Production Planning and Manpower Control. • Responsible Maintains of Machines Mechanical and Electrical. • Responsible doing the weekly preventive maintains of Dryer. • Planning and controlling the manufacturing operations, Manpower handling. • SAP software Production planning and Control. • Machine troubleshooting problem solve and technical data storage. • Extrusion cable 3 core and flat cable and co-Axial cable production also.

Sprachen

  • Englisch

    Fließend

  • Deutsch

    Gut

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z