
Axel Andreä
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Axel Andreä
- Bis heute 9 Jahre und 4 Monate, seit Feb. 2016
Geschäftsführer
AXEL ANDREÄ consulting and engineering
- Bis heute 12 Jahre und 11 Monate, seit Juli 2012
Geschäftsführer
ANDREÄ Consultoria e Servicos de Engenharia Ltda.
Consulting and engineering services for wind energy projects
- 2 Jahre, Apr. 2009 - März 2011
Abteilungsleiter
SGS Germany GmbH
• Team Leader of the Competence Centre Wind Energy and the Technical Office Wind Energy in Hamburg • Head of Department Wind Energy for the Technical Office Wind Energy with focus on Project Certification of Offshore Wind Farms • Budget responsibility for the German wind energy activities
- 11 Monate, Apr. 2008 - Feb. 2009
Trainer
Autonom
• Peru: Performance of the seminar “Proyectos de Energía Eólica para la Generación de Electricidad“ (Wind Energy Projects for Generation of Electricity) at the ‚Universidad Católica de Santa María‘, Arequipa. • Colombia: Preparation of the seminar “Energía Eólica – Tecnología, Economía, Retos“ (Wind Energy – Technology, Economy, Challenges.) at the ‚Universidad del Valle‘, Cali. • Colombia: Collaboration in the further extension of the development project “Colegio de las Aguas“ (School of Water) in Montebel
- 5 Jahre und 9 Monate, Juli 2002 - März 2008
Head of Department
Germanischer Lloyd Industrial Services GmbH
• Head of department “Load Assumptions“ responsible for 10 employees of staff. • Project manager of the client and world market leader Vestas Wind Systems A/S, Denmark for their certification projects. • Participation in development of regulations and standards on the national and international level in the field of loads, safety and engineering integrity for wind turbines. • Performance of seminars on wind energy technology for experts on international level. • Certific. service for ocean energy converters
- 1 Jahr, Juli 2001 - Juni 2002
Head of Department
REpower Systems AG
• Build-up and expansion of the department “Load Assumptions”. • Project manager for the development of the wind turbine MM70 having an installed power of 2 MW. • Development of an efficient strategy for load calculations according to national and international standards for the wind turbine 5M having an installed power of 5 MW. • Responsible conductor for the certification of REpower’s products.
- 6 Jahre und 3 Monate, Apr. 1995 - Juni 2001
Sachverständiger
Germanischer Lloyd WindEnergie GmbH
• Examination of load calculations and tower design calculations according to national and international standards. • Manager for the certification projects of GL’s Spanish customers (Gamesa, Made, Ecotècnia). • Examination of site specific load calculations for international mega projects. • Entire examination of the design of a wind turbine for developing countries. • Evaluation and analysis of measurements on wind turbines. • Participation in research projects of different subjects in international teams
- 4 Jahre und 6 Monate, Okt. 1990 - März 1995
Projektingenieur
aerody Energiesysteme GmbH
• Project engineer for the research project of the German Ministry for Research and Technology “Development of an extruded Aluminum Rotor Blade for Horizontal Axis Wind Turbines and Cost minimizing Series Production”. • Calculation and simulation of loads for a huge number of wind turbines of different power classes. • Design and calculation of tubular steel towers and documentation for Type Certification. • Development and programming of digital computer programs for load calculations as well as calculatio
- 11 Monate, Nov. 1989 - Sep. 1990
Testfield- Engineer
Windtest Kaiser-Wilhelm-Koog GmbH
• Participation in build-up and expansion of the new founded company. • Management of the test field for wind turbines. • Performance of measurements and analysis in the research project “Small Wind Turbines for Developing Countries”. • Performance of measurements of wind potential and site specific expertise. • Participation research project “Scientific Measurement and Evaluation Program WMEP 250MW”. • Participation in the measurement program and operation of the wind turbine “HMW56-Antarctic”.
Ausbildung von Axel Andreä
- 4 Jahre und 7 Monate, März 1985 - Sep. 1989
Fachhochschule Hamburg
Student research project: • (Design and calculation of a tubular steel tower for the wind turbine HSW 30 for Type Approval); Grade: 1.0 Theses: • (Analysis of the mutual wake interaction of wind turbines in park configuration, case study “Windenergiepark Westküste”); Grade 1.0
Sprachen
Deutsch
Muttersprache
Englisch
Fließend
Spanisch
Gut
Portugiesisch
Gut
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.