BORAN YELKENCİOĞLU

Angestellt, Pre-Commissioning and Commissioning Team Leader, ES GROUP
Izmir, Turkey

Fähigkeiten und Kenntnisse

QA/QC

Werdegang

Berufserfahrung von BORAN YELKENCİOĞLU

  • Current 8 years and 10 months, since Aug 2017

    Pre-Commissioning and Commissioning Team Leader

    ES GROUP

    Following of the pre-commissioning and commissioning activities. Management of pre-comm. as the hydro-test, cleaning, dry-out, blowing, chemical cleaning, inerting activities.

  • Current 9 years and 8 months, since Oct 2016

    QC/QA Group Chief

    ES GROUP

    • Monitoring and Management of quality activities within connection pipeline system between STAR Refinery and PETKİM Facilities Project • Submission of relevant procedures to the approval of STAR & PETKİM authorities. • Following of revision works of existing and connection lines accordance within Quality requirements and relevant procedures of PETKİM Refinery. • Management of QA /QC Team.

  • Current

    QC/QA Group Chief

    ES GROUP

  • 8 months, Mar 2016 - Oct 2016

    QC/QA Chief Engineer

    ILK CONSTRUCTION CONTRACTING& TRADE Ltd.Co.

    Monitoring and Management of quality activities of factory piping manufacturing process .Organization of factory QA/QC works, inspection and testing activities through the piping process controls, Control of welding progress accordance within TSGI procedures and specifications.

  • 9 months, Jul 2015 - Mar 2016

    QC/QA Inspector

    GİMAS GİRGİN MAKİNA İMALAT MONT. MÜH. SAN. TİC.A.Ş

    • Some projects under my responsibilities are; • Alstom Hydro- KALEKÖY HEPP Project /Turkey-Quality control of manufacturing • Alstom Hydro- “NANTE DE DRANCE Hydropower Plant” / SWITZERLAND - control of manufacturing • Alstom Hydro- “SENDJE Power Plant”- Quality control of manufacturing • Metso Oil & Gas & Mineral- Quality control of manufacturing • Monitoring and management the certification process of standard EN 18800-7, EN1090, EN 3834

  • 10 months, Sep 2014 - Jun 2015

    Project Coordinator

    3D-INCERTA CERTIFICATION SURVEILLANCE & CONTROL ENGINEERING Co

    GÜBRETAŞ Co (Technical supervisor of manufacturing process for ammonia Tank-33000 m³ accordance within API 620, Supplier is UMDE Co. SAKARYA).ALSTOM POWER & DOGUŞ ENERGY GROUP (Supervisor and coordinator of manufacturing process and Function test of the cranes for ARTVİN DAM & HEPP Project).GENERAL ELECTRIC TURKEY-SAMSUN (periodic controls of equipment such as overhead crane, monorail crane, slings, wire ropes etc.).

  • 5 months, Apr 2014 - Aug 2014

    Site QA/QC Deputy Manager

    MECHANICAL CONTRACTING GROUP

    • The projects under my responsibilities are; • 1 Ammonia Tank-30000 m³ (API 620). (537 Cl1) • 1Nitric Acid Tank: 3,000 m³ (API 650). (D) • All piping, steel structure and equipment installation works. • Composition & organization of Quality control inspector group

  • 1 year and 10 months, Mar 2012 - Dec 2013

    Inspector - Quality Control Specialist

    APAVE INTERNATIONAL Turkey

    Controls documents issued for Quality Control and Assurance Systems.Inspects Welding Qualification Certification ISO EN 3834 systems and directs ISO EN 3834, EN 1090 audits for welding Manufacturing & construction companies Conducts project management as “Shop Fabrication Technical Inspector” in fields of pressure vessels, heat ex-changers, boiler parts, metallic and non-metallic composite materials.Inspects field installation works.((Projects: AGE Gas Fired Power Plant in Denizli-Turkey)

  • 4 years and 7 months, Jun 2008 - Dec 2012

    QA/QC Specialist

    EMC – ENGINEERING & MANUFACTURING & CONSTRUCTION Co. İZMİR

    Directed quality control procedures and issues related documents for manufacturing, installation and erection works including upgrade works, manufacturing & installation of ACC steel structures, Waste Heat Steam Boiler and piping works, Cooling Tower ducting and piping works, Feed Water Tank, etc.,

  • 4 years and 7 months, Jun 2008 - Dec 2012

    Construction Site Supervisor

    EMC – ENGINEERING & MANUFACTURING & CONSTRUCTION Co. İZMİR

    Directed and coordinated steel structures works (Projects: NAMSA ISAF HQ 160 tones steel structure works, Kabul - Afghanistan, 2011 ,installation works of 1000 m³ Fire water storage tanks as per API 650 (AYGAZ Co. Isparta LPG Distribute Terminal-May, 2011, AYGAZ Co. Diyarbakır - August, 2010, AYGAZ Co. Samsun Terminal, 2010),Directed and coordinated manufacturing and installation works of 3000 m³ Fire water storage tank as per API 650 (AYGAZ Co. İzmir Terminal - February, 2010)

  • 1 year and 10 months, Mar 2006 - Dec 2007

    Construction Site Supervisor

    GENTA International Construction Installation of Industry And Trade Co, IZMIR

    HVAC systems installation and manufacturing works (Project: MMO (Chamber of Mechanical Engineers) Izmir Trade Center / Izmir-TURKEY , March 2006)(customer: BRITISH AMERICAN TOBACCO FACTORY, BAT-Tire , in April 2006,)PHILLIP MORRIS INTERNATIONAL / PHILSA - Torbalı/İZMİR-TÜRKİYE 3,120,000.00 $ -2006 PHASE II expansion project, auxiliary facilities, building works , installation of HVAC systems and unit equipment, Fire detection and fire sprink system

Ausbildung von BORAN YELKENCİOĞLU

  • 9 years, Sep 1997 - Aug 2006

    Makine mühendisliği

    9 Eyluel University

    ISITMA,SOĞUTMA,HVAC SİSTEMLERİ KAYNAKLI İMALAT

Sprachen

  • English

    B1-B2 (Gute Kenntnisse)

  • Italian

    A1-A2 (Grundkenntnisse)

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z