Dipl.-Ing. Bojan Lazicic

Angestellt, Site Manager Deputy, Pizzarotti Millennium
Abschluss: Master of Architecture (M.Arch.) 95/110, Politecnico di Milano
Moscow, Russische Föderation

Fähigkeiten und Kenntnisse

Architecture
Construction
Planing
Office

Werdegang

Berufserfahrung von Bojan Lazicic

  • Bis heute 6 Jahre und 7 Monate, seit Jan. 2019

    Site Manager Deputy

    Pizzarotti Millennium

    Belgrade St.Regis Tower, Serbia / Height: 168m/ Surface: 70.000 m2/ Floors: 40 / Preparing 3 week work programmes in line with the master programme / Preparing the weekly report for evaluation of the rate of progress / Evaluate creitical activities that can affect the fullfilment os assigned partial millestones / Manage different NSC / Manage service and logistic issues for the needs of production / Coopeate with Quality Dep. and Tech Office

  • 1 Jahr und 7 Monate, Juli 2017 - Jan. 2019

    Site Manager Assistant

    Pizzarotti Montenegro

    Portonovi Resort, Kumbor, Montenegro /Area Lower Village /Daily monitoring of all works in area aprox 20000m2 /Daily monitoring the Micro programmes Activities /Weekly report of achieved work /Managing activities of each single NSC on daily basis /Resolving problems and conflicts between different activities on site /Manage-coordination with direct workers for specific tasks /Transportation-stocking material on the site /Mechanisation transportation tasks

  • 2 Jahre und 4 Monate, Feb. 2015 - Mai 2017

    Architect

    CFA SRL

    Renovation - Enel headquarter, Milano Surface: 10.000m2 - Height: 40m – Floors: 9 Renovation – Family house/ Commercial office Surface: 1000m2 – Height: 15m – Floors: 3 Architectural/ engineer glass façade consulting – Preliminary façade study Fiumicino airport business City West – Design of 3 types of framing, TGU glass Uw=1,0, research of fire resistance, acoustical characteristics, methodology if assembling (cellular Collaboration with ‘ISA’ engineer Cesare Perduca

  • 1 Jahr und 10 Monate, März 2013 - Dez. 2014

    Architect

    Ambrosi&Fucigna Atelier architettura

    Architectural design 3D Modeling

Ausbildung von Bojan Lazicic

  • 4 Jahre und 4 Monate, Sep. 2009 - Dez. 2013

    Architecure

    Politecnico di Milano

    Master thesis – Skyscraper, commercial use and theatre Surface: 90.000m2 - Height: 170m – Floors: 42 Double ventilated curtain wall façade – semi structural – TGU glass Garage: 4 floors underground

  • 2 Jahre und 10 Monate, Sep. 2006 - Juni 2009

    Architecture

    University of Belgrade

    Construction steel structures

Sprachen

  • Englisch

    Fließend

  • Italienisch

    Fließend

  • Russisch

    Grundlagen

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z