
Dipl.-Ing. Bojan Lazicic
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Bojan Lazicic
- Bis heute 6 Jahre und 7 Monate, seit Jan. 2019
Site Manager Deputy
Pizzarotti Millennium
Belgrade St.Regis Tower, Serbia / Height: 168m/ Surface: 70.000 m2/ Floors: 40 / Preparing 3 week work programmes in line with the master programme / Preparing the weekly report for evaluation of the rate of progress / Evaluate creitical activities that can affect the fullfilment os assigned partial millestones / Manage different NSC / Manage service and logistic issues for the needs of production / Coopeate with Quality Dep. and Tech Office
- 1 Jahr und 7 Monate, Juli 2017 - Jan. 2019
Site Manager Assistant
Pizzarotti Montenegro
Portonovi Resort, Kumbor, Montenegro /Area Lower Village /Daily monitoring of all works in area aprox 20000m2 /Daily monitoring the Micro programmes Activities /Weekly report of achieved work /Managing activities of each single NSC on daily basis /Resolving problems and conflicts between different activities on site /Manage-coordination with direct workers for specific tasks /Transportation-stocking material on the site /Mechanisation transportation tasks
- 2 Jahre und 4 Monate, Feb. 2015 - Mai 2017
Architect
CFA SRL
Renovation - Enel headquarter, Milano Surface: 10.000m2 - Height: 40m – Floors: 9 Renovation – Family house/ Commercial office Surface: 1000m2 – Height: 15m – Floors: 3 Architectural/ engineer glass façade consulting – Preliminary façade study Fiumicino airport business City West – Design of 3 types of framing, TGU glass Uw=1,0, research of fire resistance, acoustical characteristics, methodology if assembling (cellular Collaboration with ‘ISA’ engineer Cesare Perduca
- 1 Jahr und 10 Monate, März 2013 - Dez. 2014
Architect
Ambrosi&Fucigna Atelier architettura
Architectural design 3D Modeling
Ausbildung von Bojan Lazicic
- 4 Jahre und 4 Monate, Sep. 2009 - Dez. 2013
Architecure
Politecnico di Milano
Master thesis – Skyscraper, commercial use and theatre Surface: 90.000m2 - Height: 170m – Floors: 42 Double ventilated curtain wall façade – semi structural – TGU glass Garage: 4 floors underground
- 2 Jahre und 10 Monate, Sep. 2006 - Juni 2009
Architecture
University of Belgrade
Construction steel structures
Sprachen
Englisch
Fließend
Italienisch
Fließend
Russisch
Grundlagen
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.