
Cucu Dumitru
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Cucu Dumitru
- 4 years and 3 months, Aug 2010 - Oct 2014
Piping Specialist
BOCCARD
Planning & scheduling man power, material and equipment efficiently and within set time frames. Monitoring the job as well as responsible for quality workmanship in jobs and achieving productivity improvements & eliminating non-value added operations. Project: FMC Client: M+W Group, FMC, Thailand Project: Gumusut Kakap Semi FPS Project Client: Malaysia Marine Heavy Engineering, MISC & SSPC, Malaysia Client: EDF Martiques, France
- 11 months, Oct 2009 - Aug 2010
Pipe Fitter and hydrotest foreman
JCR CHRISTOF CONSULTING
Duties: hydro test of heat exchangers and pipe whit pressure between 8 bar and 100 bar. Reinstalling all systems, flanges ,gaskets and bolts. - Assembly and restoration of metallic constructions - Refinery maintenance performing works of fitting and repairing columns,pipe lines, tanks for oil and water, other installation in the refinery area - Performing regular works of fitting and repairing in the refinery area on columns, pipe lines, heat exchanges, tanks and other installaions
- 2 years and 5 months, Jul 2007 - Nov 2009
Project Manager
ROMANIA-SC Bruno Investment &Development SRL
Assembly and restoration of metallic construction release in execution the requested materials for production department according to the schedule follow weekly plan achievements of target execution - participate in periodical meeting with local authorities, private firms or physical persons involved in the running process - negotiate and contract the most important services & materials suppliers to prove acquisitions rent abilities - supervise the contracts running based on buyers’ report based on profes
- 9 months, Sep 2006 - May 2007
Foreman Team Chief metallic confections and welding
ROMANIA-SC RALMA SRL– plastic waste recycling unit – ecological garbage
-Construction of the deposit for the unit of plastic recycling unit, from metallic profile “IP-600”, “IP-500”,”H-600”,”H-500”,”U-200”,”U-120”,”-200”,” -100”, of the retaining pole between 9-10 meter high and plough beam with an opening of maximum 30 meters. Assembling and welding according to existing plans. - Assembly and restoration of metallic constructions - Cutting with electrical grinder and cutting set oxygen & acetylene (Gas-propane
- 3 months, Jul 2006 - Sep 2006
TECHNICIAN bolting and hydro test
KAZAKHSTAN- PSL ENERGY SERVICE, TENGHIZ CHEVRON OIL RAFINERY SHUT DOWN
Torque flanges and heat exchangers joints using Hytorq hydraulic pumps, with MXT XLCT wrenches, and Norbar hand wrenches, hydro test of heat exchangers and pipe whit pressure between 20 bar and 125 bar
- 3 months, May 2006 - Jul 2006
Supervisor bolting and hydrotest
AZERBAIJIAN-PSL ENERGY SERVICE, AIOC-BP PROJECT, SANGACHAL OIL TERMINAL
Torque and tensioning flanges and clamp joints using Hytorq hydraulic pumps, with MXT XLCT wrenches,SRT tensioning pumps and Norbar hand wrenches hydro test pneumatic of pipe with pressure between 8 bar and 20 bar
- 1 year and 2 months, Mar 2005 - Apr 2006
Supervisor hydro test &bolting
PSL ENERGY SERVICES on Shah Deniz Gas Export Project TPG 500- Technip-BP, AZERBA
-Hydro test, pneumatic test of pipe with pressure between 20 bar and 1600 Bar, (2, 8, and 24 hours) on all classes of pipe work from 150# to 2500#ANSI and MSS class also API well head and DES/DSM system to 20000# class in all materials including, Polypipe, Cunifer, Carbon, Duplex etc. -Test with nitrogen and air with pressure up to 230 bars. - Retro jet, flushing and chemical cleaning activities.
- 3 months, Jan 2005 - Mar 2005
TECHNICIAN hydro test and hot oil flushing
PSL ENERGY SERVICES on Shah Deniz Gas Export Project TPG 500 Jaking and Locking
-Hydro test, pneumatic test of pipe with pressure between 20 bar and 1065 Bar, (2, 8, and 24 hours) -Test with nitrogen and air with pressure up to 13 bars. - Retro jet, flushing and chemical cleaning activities. - BP- CSC safety training and confined space entry courses.
- 8 months, Jun 2004 - Jan 2005
TECHNICIAN hydro test
PSL ENERGY SERVICES on AIOC BP PROJECT C&WP PLATFORM- AZERBAIJIAN
- Hydro test, pneumatic test of pipe with pressure between 20 bar and 1065 Bar, (2, 8, and 24 hours) -Test with nitrogen and air with pressure up to 13 bars. - Retro jet, flushing and chemical cleaning activities. - BP-AIOC safety training.
- 4 months, Feb 2004 - May 2004
TECHNICIAN pipe fabricator
SAIPEM ENI GROUP ITALY on OKPAI INDEPENDENT POWER PLANT PROJECT (NIGERIAN AGIP O
- Assembly and installing of stainless steel pipe size between 2” and 12”, pipe support, all types of valves - Erection of heavy equipment and vessel. - Participating with the installation of gas turbine 160MW (ALSTOM) - Applying drawing and sketches on the field.
- 1 year and 8 months, Dec 2001 - Jul 2003
Foreman pipe fabricator
CCC- SAIPEM ENI GROUP CONSORTIUM - KAZACHSTAN, KARACHAGANAK MAIN WORKS CONTRACT
- Assembly and installing of stainless steel pipe size between 1” and 10”, carbon steel pipe size between ½” and 24” - Installing heavy walls - Assembly and installing of galvanized steel pipe from instrumental air System size between ½” and 3” jointed in treed - Installing all kind of pipe support - Assembly and installing of relief valves, boll valves, gate valves - Participating and installing on: - Condensate export pumps house - Loading and unloading pumps hous
- 1 year and 6 months, Jul 2000 - Dec 2001
Foreman pipe fitter and electric welder
S.C. TERMASERV LTD. Ploiesti – Prahova – Romania
- Assembly and restoration of metallic constructions - Refinery maintenance performing works of fitting and repairing columns,pipe lines, tanks for oil and water, other installation in the refinery area - Performing regular works of fitting and repairing in the refinery area on columns, pipe lines, heat exchanges, tanks and other installaions - Installing pipes: carbon steel size between ½” and 30 ”, stainless steel size between ½” -10”, galvanized pipes size between ½” and 3”
- 1 year and 2 months, Jun 1999 - Jul 2000
FOREMAN pipe fitter and electric welder
S.C. UMO LTD. Ploiesti – Prahova – Romania
- Assembly metallic constructions - Cutting with electrical grinder and cutting set oxygen & acetylene (Gas-propane) - Assembly and welding tanks for diesel and oil - Install plate with automatically machine for bolts carbon, chrome-molly, low nickel and stainless steel - Installing pipe-racks, valves, spool and static equipment - Building oil station for different contracts all over Prahova County for Luk OIL - Applying drawing and sketches on the field.
- 6 years and 4 months, Apr 1993 - Jul 1999
Foreman pipe fitter and electric welder
S.C. TERMISTUL LTD. Ploiesti – Prahova – Romania
- Works of assembly and restoration of the refinery, power plant, thermal station, water clearing station and metallic constructions - Repairing and maintenance in petrochemical plant, power plant - Repairing and elevation of different equipment made of carbon, chrome-molly, low nickel and stainless steel - Performing regular works of fitting and repairing in the refinery area on columns, pipelines, heat exchanges, tanks and other installations
- 2 years and 2 months, Feb 1991 - Mar 1993
Foreman pipe fitter and hydro test
S.C. ROMPETROL SA in TURKMENISTAN - SOVIETABAD GAS PLANT PROJECT
- Assembly and installing of carbon steel pipe size between 1” – 10” - Assembly pipe carbon steel between ½” and 24”, heavy walls, relief valves,boll valves, gate valves - Assembly galvanized pipe ½” -3” jointed in treed, all kind of pipe supports - Assembly pipe-racks, valves spool - Repairing and elevation of different equipment made of carbon, columns, pipe lines, heat exchanges, tanks and other installations - Installing pipes: carbon steel size ½” and 30”, stainless steel chrome-moll
- 6 months, Sep 1990 - Feb 1991
Sergent
Romanian Army
public regular army service
- 2 years and 8 months, Feb 1988 - Sep 1990
pipe fitter and steel - carpenter
S.C. CONCORDIA SA BUCHAREST ROMANIA
- Assembly metallic constructions and elevating them to the position they were build for - Cutting with electrical grinder and cutting set oxygen & acetylene (Gas-propane) - Installing metallic & anti atomics doors - Assembly of steam condensation and sanitary installations - Works for construction for subway lines owned by “METROU BUCHAREST” - Applying drawing and sketches on the field.
Ausbildung von Cucu Dumitru
- 2 years and 10 months, Sep 1987 - Jun 1990
locksmith profession
High School no. 23 - Bucharest
Bucharest regular session for skilled worker in mechanics - locksmith profession
- 1 year and 6 months, Sep 1986 - Feb 1988
- locksmith profession
Vocational School no.32 - Bucharest
Vocational School no.32 - Bucharest with 1 and ½ years length extra session for skilled worker in mechanics - locksmith profession – obtained main degree in mechanics – locksmith
Sprachen
English
B1-B2 (Gute Kenntnisse)
Russian
A1-A2 (Grundkenntnisse)
Romanian
C2 (Verhandlungssicher / Muttersprachlich)
French
A1-A2 (Grundkenntnisse)
Italian
A1-A2 (Grundkenntnisse)
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.
