Dr. -Ing. Artur Harutyunyan
Angestellt, Renewable Energy Specialist, Pfiefer & Langen Polska S.A.
Abschluss: Ph.D. Eng., Warsaw University of Technology
Środa Wielkopolska, Polen
Über mich
• Ph.D. Eng. (Honored Doctoral Dissertation - WUT Rector's individual award) • Renewable Energy Specialist • Project Manager • Project Consultant • Energy Management Specialist at Sugar industry • Over 13 years of experience in power plants • Strong background in the field of energy management, as well as commissioning, operation and maintenance of steam boilers, steam turbines and gas turbine. • Professional communication skills include fluency in English, Russian and Polish. • Profound knowledge and experience of software for power plant performance (GateCycleTM, Aspen HYSYS, SIPEP, EBSILON, ANSYS). • Over 2 years Erasmus Mundus Scholarship holder
Werdegang
Berufserfahrung von Dr. -Ing. Artur Harutyunyan
Bis heute 3 Jahre und 11 Monate, seit Nov. 2020
Renewable Energy Specialist
Pfiefer & Langen Polska S.A.
-Search and development of new technical solutions in the field of Renewable Energy, - Managing optimization projects (DMAIC methodology), - Standardization of machines, sensors, software, infrastructure, - Supervision over testing new equipment and installations, - Estimation and creation CAPEX and OPEX budgets for new technologies, - Analysis of data on failure rate, efficiency of machines and equipment, estimation and calculation the effects, results of optimization.
Bis heute 3 Jahre und 11 Monate, seit Nov. 2020
Project Manager
Pfeifer & Langen Polska S.A.
Construction (installation) of three biogas plants (in total 8 MWe power), Project POC (Proof of Concept) Fully Electric Factory: - 1,5 MW high voltage electrode steam boiler installation, - expansion of 1,5 MWe existing biogas plant.
2 Jahre und 1 Monat, Juni 2019 - Juni 2021
Project Consultant
Pfeifer & Langen Polska S.A.
Project "Energy Strategy of Company after 2024" - Repowering of Pfeifer & Langen Polska S.A. power plants
2 Jahre und 9 Monate, Feb. 2018 - Okt. 2020
Energy Management Specialist
Pfeifer & Langen Polska S.A.
- Planning of Maintenance Repair and Overhaul of the thermal power plant - Investment planning in the area of energy - Making technical reports, as well as reports for government - Supervision of the operational parameters of the thermal power plant - Coal purchases together with the purchase department - Supervision of the settlement of carbon dioxide emissions - Supervision of the settlement of energy production in cogeneration system - The holding of training courses about thermal power plants
1 Jahr und 1 Monat, Sep. 2014 - Sep. 2015
Steam Boiler commissioning engineer in the Startup and Commissioning Department
“Gazprom Armenia” CJSC “HRAZDAN-5” Enterprise (Combined cycle power plant)
Made commissioning test procedure programs for steam boiler (the capacity: 950 ton/h) and equipment. Composed and implemented steam boiler performance tests and made reports. Measured flue gas and emissions and made their reports.
3 Jahre und 11 Monate, Nov. 2010 - Sep. 2014
Specialist in the Startup and Commissioning Department
"Gazprom Armenia" CJSC "Hrazdan-5" Enterprise
Coordinating and managing Alstom GT13E2 gas turbine and gas compressor commissioning works which were being done by engineering groups of Alstom (Switzerland) and Howden (Scotland) companies (summary 15 engineers) during pre-commissioning and commissioning of "Hrazdan-5" project (450 MW). Making commissioning test procedure programs for the gas compressor, gas turbine, and auxiliary system. Composing and implemented gas compressor and gas turbine performance tests and made reports.
2 Jahre und 5 Monate, Juli 2008 - Nov. 2010
Mechanic on duty repair equipment of the power plant
“Energy company of Hrazdan (Hraz TPP)” OJSC (Thermal power plant)
Did maintenance steam boilers, steam turbines (200 MW) and equipment. Installed or repaired pipe systems. Changed gaskets of pumps and valves. Inspected, examined and tested installed systems and pipe lines using a pressure gauge, hydrostatic testing, observation or other methods. Measured and marked pipes for cutting. Installed supports, valves, piping and control systems. Tested system for leaks using the testing equipment. Cleaned and maintained pipe units and fittings and flush system.
Ausbildung von Dr. -Ing. Artur Harutyunyan
6 Jahre und 2 Monate, Okt. 2015 - Nov. 2021
Ph.D. Eng. in Thermal Power Engineering
Warsaw University of Technology
1 Jahr und 10 Monate, Sep. 2008 - Juni 2010
Thermal power engineering (including Nuclear Power Plants and equipment)
State Engineering University of Armenia
5 Jahre und 10 Monate, Sep. 2004 - Juni 2010
Thermal Power Plants
State Engineering University of Armenia
Sprachen
Englisch
Fließend
Russisch
Fließend
Polnisch
Gut
Deutsch
Grundlagen