Elhabib Sidi Ali Cherif

Angestellt, Control room Operator, Oz
Aïn Temouchent, Algerien

Fähigkeiten und Kenntnisse

MS Office
MatLab
Preventive maintenance
Curative maintenance
Electrical Engineering
Pneumatics
Hydraulics
Diagnostic
Engineering
Quality Control
Process engineering
Business Process Management
Process Optimization
Rolling

Werdegang

Berufserfahrung von Elhabib Sidi Ali Cherif

  • Bis heute 1 Jahr und 2 Monate, seit Juni 2024

    Control room Operator

    Oz

    (Hot rolling mill) * Collaborated with other operators and supervisors, to ensure smooth production, which led to a +10% of production efficiency. * Operated and adjusted control systems to optimize rolling mill processes, resulting in a -15% downtime.

  • Bis heute 3 Jahre und 3 Monate, seit Mai 2022

    Process Engineer

    Özmert Algeria

    (shredder, scrap crushing production line Perform the operation and monitoring of equipment and facilities and ensure their proper functioning. Carry out the maintenance of equipment as well as the cleaning of the department. Writing reports according to performance indicators. support involved collaborators.

  • 10 Monate, Aug. 2021 - Mai 2022

    Process Engineer

    Özmert Algeria

    air separation unit for Oxygen. Participated in the assembly and commissioning of the production unit. Scheduled employee’s tasks, hours and shifts. Provided training and necessary motivation. Monitored work habits and made sure tasks are completed in time and production goals are met. Intervened with preventive and corrective maintenance in case of a breakdown or a scheduled repair. Provided feedback to upper management about performances and the general situation of the facility.

  • 5 Jahre, Sep. 2016 - Aug. 2021

    Customer Service Manager

    IRIS SAT

    after sales service center Created the service center with all of the administrative steps, the leasing of the workshop and the recruitment of personnel. Provided customers with technical and commercial follow-up in case of problems. Managed intervention programs which led to reducing response time from weekly to daily basis. Fixed the problem of none availability of spare parts by a establishing a special program. Led technicians, participated in the repairing process and reduced repairs time.

  • 2 Jahre und 1 Monat, Nov. 2013 - Nov. 2015

    Electrician

    City Hall

    public administration Made preventive equipment maintenance, following a well put together program. Installed and repaired all types of electrical equipment (switches, generators, motors, pumps, etc.). Installed electrical cabinets and perfectly used electrical measuring instruments.

Sprachen

  • Arabisch

    Muttersprache

  • Französisch

    Fließend

  • Deutsch

    Grundlagen

  • Englisch

    Fließend

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z