
Erol Huniler
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Erol Huniler
- Bis heute 5 Jahre, seit Juni 2020
Project Manager
BTP Holding
Construction area-architectural
- 2 Jahre und 3 Monate, Apr. 2017 - Juni 2019
Architectural Coordinator
Mohib Holding
Work place Kabul: Mixed building Bank, Residans, Hotel,Shopping Mall center in Kabul: Manage and Coordinate the Finaly works, Work Program, Manage Contractors, Materials Order for Finaly works e.c.t Project Cost in Total: 200 Million USD Work place Mezari Sherif: Mixed building Hospital, Residans,Shopping Mall center in Mezari Sherif: Manage and Coordinate the Finaly works, Work Program, Manage Contractors, Materials Order for Finaly works e.t.c Project Cost in Total: 150 Million USD
- 1 Jahr und 5 Monate, Jan. 2015 - Mai 2016
Finishing works chef
Polimeks İnşaat
Work place: VIP AIRPORT ( Construction area 15,500 m2): Manage and Coordination Subcontracors, Coordination Mecanical and Electical disciplines ,Control finishing Works, quality control, Coordination site Architect and Engineers in site. Work place: INTERNACIONAL AIRPORT: Finishing works in Passanger Bridges Project Cost in Total: 2 Miliard 250 Milon USD
- 4 Jahre und 1 Monat, März 2010 - März 2014
Project Manager
Deshishku Construction
Work place: High Building Construction In Prishina City (Construction area 15,000 m2): Manage and Cordination Subcontracors,Building Cost Control and Manage, Contract with Land owners, Constuction Permit Works in Municipal,
- 1 Jahr und 8 Monate, Juli 2008 - Feb. 2010
Design office and coordination Architect
Yorum Insaat
Work place: Shoping Mall Centre Forum Istanbul (Construction area 350,000 m2): Control of the project and point details coming from subcontractors, finishing detail control and coordination subcontracter in site.
- 1 Jahr und 7 Monate, Dez. 2006 - Juni 2008
Architect
MM project
- Project Architecture /Innovia Project of Cooperative Apartment House (Construction area: 20,000 m2), -Design of the site -Detail studying -Shopping Centre Forum Gordion Cayyollu Ankara, -Detail studying -Shopping Centre Astana (Construction area 230,000 m2), -Drawing Project for Construction -Detail studying -House in Moskova (Construction area 750 m2) -Point Details
- 1 Jahr, Jan. 2006 - Dez. 2006
Design Architect
Arkun Mimarlık
-Project Architecture / House building Project -Site building Project -Villa’s Project and Apartman Project -Design Project of plated and detail drawing -Drawing of the implementation projects
Ausbildung von Erol Huniler
- 2 Jahre und 1 Monat, Sep. 2007 - Sep. 2009
Master of archtecture
Yildiz Techical University
Architectural Design
- Bis heute 19 Jahre und 4 Monate, seit Feb. 2006
Trakya univeristesi
Yıldız Technical University
- 4 Jahre und 6 Monate, Sep. 2001 - Feb. 2006
Architecture
Trakya University
Architecture
Sprachen
Türkisch
Muttersprache
Englisch
Fließend
Albanian
Muttersprache
Serbian
Muttersprache
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.