Navigation überspringen

Dr. Fausto Pappalardo

Selbstständig, Vice President Technology Italy, Next Energy Capital
Catania, Italien

Fähigkeiten und Kenntnisse

Project management e gestione dei processi
Cost Controlling
Consulenza per soluzioni di risparmio energetico
Certificazione energetica degli edifici
Consulenza e progettazione di sistemi di Home auto
Energy Management

Werdegang

Berufserfahrung von Fausto Pappalardo

  • Bis heute 9 Jahre und 7 Monate, seit Nov. 2015

    Vice President Technology Italy

    Next Energy Capital

    NEC Group, founded in 2007, has deployed c. €900m of its own and third party equity and debt in solar power projects, having developed, constructed and financed over 60 solar power plants in Italy and UK. Its asset management division, WiseEnergy, manages and monitors c. 1.9 GWp The role foresees leading the Italian technical team, following M&A processes, managing Technical Due Diligences on the acquisition of solar assets as well as providing advisory and support in managing the Italian portfolio

  • Bis heute 9 Jahre und 8 Monate, seit Okt. 2015

    Operations and Asset Manager

    Trading Emissions PLC

    Trading Emissions PLC was incorporated in the Isle of Man on 15 March 2005 for the purpose of investing in environmental and emissions assets. It commenced trading on the London Stock Exchange’s Alternative Investment Market in April 2005. The role foresees the management of the Italian solar portfolio, composed by 8 plants for a total of 25 MWp.

  • Bis heute 13 Jahre und 5 Monate, seit Jan. 2012

    Socio e direttore tecnico

    Pro.En. S.r.l.

    Soluzioni chiavi in mano per impianti fotovoltaici. Servizi di progettazione e gestione iter autorizzativi. Energy Management. Soluzioni di risparmio energetico. Impianti domotici (home automation)

  • 6 Jahre und 4 Monate, Sep. 2009 - Dez. 2015

    Libero professionista

    Studio Professionale

    Energy management; Consulenza e progettazione di impianti fotovoltaici grid connected; sopralluoghi, gestione iter burocratico direzione dei lavori; collaudo dell’impianto; allaccio alla rete; richiesta di ammissione alle tariffe incentivanti. Consulenza per soluzioni di risparmio energetico; Certificazione energetica degli edifici; Consulenza e progettazione di sistemi di Home automation – Domotica per edifici pubblici e privati; Consulenza e progettazione di impiantistica elettrica.

  • 2 Jahre und 3 Monate, März 2013 - Mai 2015

    Head of O&M Department

    Belectric Italia Srl

    Il ruolo prevede la gestione ed il coordinamento tecnico del dipartimento (20 unità su 6 regioni) che opera su un portfolio di 80MWp in continua crescita. • Qualità (ISO 9001) • Costs control • Reporting • Contatto con clienti • Business Development • Logistica • Consulenza tecnico/Legale

  • 1 Jahr und 1 Monat, März 2012 - März 2013

    Director of the Sicilian Division

    Belectric Italia S.r.l.

    Business development : deals with customers for new O&M and EPC opportunities O&M management: On site coordination of the maintenance of 25MWp grid connected power plants. Monitoring, preventive maintenance scheduling (mowing, modules cleaning, electrical checks, etc). Corrective maintenance (failures, disconnections)

  • 6 Monate, Juni 2011 - Nov. 2011

    Project Engineer

    Alpine Energie

    Strongly involved in the construction of twoPV plants of 2,31MWp and 4,8 MWp near Siracusa. Site support: Local subcontractors and local suppliers’ management. Enel 20kV grid connection management. O&M management and support: On site coordination and support for the maintenance of the grid connected power plants. Monitoring, preventive maintenance scheduling. Corrective maintenance.

  • 1 Jahr und 3 Monate, Feb. 2009 - Apr. 2010

    Technical Engineer

    ASP Solar Italia S.r.l.

    Sviluppo di progetti di impianti fotovoltaici grid connected in conto energia (D.M. 19/02/2007), con potenze di picco dell'ordine dei MWp.

  • 2007 - 2010

    Studente di Dottorato

    Ph.D. Electrical Enginnering

    Studente di dottorato all'università di Catania. Mi occupo dell'ottimizzazione e del controllo dei flussi energetici di sistemi fotovoltaici grid - connected con batterie.

  • 2 Jahre und 1 Monat, Feb. 2007 - Feb. 2009

    Responsabile progettazione

    Spes Engineering

    Dipartimento: Tecnologia. Assistenza e Applicazioni, Lavoro part-time come responsabile del gruppo di progettazione di impianti fotovoltaici. Principali attività: rapporti con i clienti, analisi dei siti, relazioni tecniche, progettazione integrale del sistema fotovoltaico (strutture e impianto elettrico). Occasionalmente vendita e contratti.

  • 1 Jahr und 11 Monate, Jan. 2006 - Nov. 2007

    Stage Post Laurea - RF Designer

    ST Microelectronics e Università di Catania

    Dipartimento: Tecnologia. Impiego settore hardware, Stage di formazione post-laurea e attività di ricerca di dottorato presso il gruppo RF-ADC. Progettazione di Power Amplifier per applicazioni DCS a 1800MHz in tecnologia CMOS con circuito di protezione da condizioni di mismatch. Simulazioni, Layout e caratterizzazione in laboratorio.

Ausbildung von Fausto Pappalardo

  • 8 Monate, Apr. 2009 - Nov. 2009

    Marketing

    Dirextra Alta Formazione

    Marketing, Communication

  • 3 Jahre und 1 Monat, Okt. 2007 - Okt. 2010

    Ingegneria Elettrica

    Università degli studi di Catania

    Photovoltaic plants, energy storage.

  • 1995 - 2005

    Microelettronica

    Università degli studi di Catania

Sprachen

  • Spanisch

    -

  • Englisch

    -

  • Italienisch

    -

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z