Florian Egger

Angestellt, Superintendent - Resource Planning and Development, Rio Tinto
Perth, Australien

Fähigkeiten und Kenntnisse

.

Werdegang

Berufserfahrung von Florian Egger

  • Bis heute 13 Jahre, seit Aug. 2012

    Superintendent - Resource Planning and Development

    Rio Tinto

    - Managing the Pilbara wide development and implementation of a new cut-off grade strategy to realize significant value. - Coordination of a number of workstreams in the areas of mine planning, resources/reserves/reconciliation, geology, grade control, processing/metallurgy, technical marketing, mine/plant operations, rail/port and business improvement. - Development of a new cut-off grade policy for Rio Tinto Iron Ore suitable for use from planning to execution across the supply chain mine/rail/port

  • 1 Jahr und 5 Monate, März 2011 - Juli 2012

    Superintendent Technical Services

    Rio Tinto

    - Managing multi-disciplinary technical teams of up to 40 people - BUDGET forecasts; cost performance; Capex - MINE PLANNING: production planning; approvals; long term resource extraction; mine design - GEOTECHNICAL ENGINEERING: slope design and implementation - MINE GEOLOGY: blockouts; geological data; orebody knowledge; reconciliation - HYDROGEOLOGY: dewatering; depressurization, Surface Water Management; drilling programs - MINE SURVEY: pit model, automated monitoring, high precis

  • 1 Jahr und 2 Monate, Jan. 2010 - Feb. 2011

    Senior Mine Planning Engineer

    Rio Tinto

    - Providing leadership to the Greater Paraburdoo Operations Mine Planning Team, technical auditing of Plans, Mine Designs, projects and studies - Medium Term Planning: Preparation of Mine Plans for up to 3 years, including reserve assessment, ore reserve evaluation, input to mine budget plans, drilling and explosive requirements forecast in a multi pit mining and multi element blending operation (25 pits and 35 waste dumps) - Management of pit, dump and road designs and approvals

  • 1 Jahr und 11 Monate, Feb. 2008 - Dez. 2009

    Mine Planning Engineer

    Rio Tinto Iron Ore

    Short Term Planning for Greater Paraburdoo Operations: Preperation of Drilling and Mining Schedule for 3 months periods including optimization of quality and quanitity of ore product as well as fixed and mobile equipment. Completion of effective mine designs accommodating for the development and construction of open-cut pits, waste dumps, in-pit stockpiles and rehabilitated landforms. Management of pit, dump and road designs for Technical Services and Mine Operations. Monitor conformance to plan.

  • 4 Monate, Okt. 2007 - Jan. 2008

    Project Mining Engineer

    STRABAG AG - Mineral Abbau GmbH

    Productivity optimization study at a Hard Rock Quarry. Mining machinery studies at a Andesite Mine. Adaptation of ‘Blast Metrix Bench Face Surveying System’ for narrow geometric situations.

  • 2 Jahre und 8 Monate, März 2004 - Okt. 2006

    Mining Research Assistant

    University of Leoben - Department Mineral Resources and Petroleum Engineering

    EU project with Sandvik: influence of the drifting method on rock disintegration, quantification of the drifting induced impact. Stability project at De Beers Cullinan Diamond Mine with Sandvik: geotechnical measuring program, determination of rock disintegration during roadheader drifting, South Africa. Hydro-cyclonation of blast furnace cinder. Development and construction of five prototype borehole geophones, Austria Interpreter German/ Portuguese/ English for mining companies and university,

Ausbildung von Florian Egger

  • 2 Jahre und 1 Monat, Feb. 2013 - Feb. 2015

    Mining Sciences

    University of Leoben

    Mine Planning and Mineral Economics; Dissertation: Implementation of a variable cut-off grade strategy in Iron ore mining (Umsetzung einer Strategie veränderlicher Grenzgehalte in der Eisenerzgewinnung)

  • 5 Monate, Aug. 2006 - Dez. 2006

    Mining Engineering

    Federal University of Bahia

    Mineral economics, Deposits of industrial Minerals, Mine planning

  • 5 Jahre und 9 Monate, Okt. 2001 - Juni 2007

    Mining Engineering

    University of Leoben

    Open cut and underground mining Mineral economics Mineral processing Tunneling Rock mechanics and geotechnics

  • 5 Jahre und 10 Monate, Sep. 1994 - Juni 2000

    Civil Engineering

    Secondary Technical College HTL Villach

Sprachen

  • Deutsch

    Muttersprache

  • Englisch

    Fließend

  • Portugiesisch

    Fließend

  • Spanisch

    Gut

  • Französisch

    Grundlagen

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z