Francisco Lopez

Bis 2014, Business developer, Enel Green Power
San Salvador , El Salvador

Fähigkeiten und Kenntnisse

Hard worker
solutions maker
safety first believer
on time and on budget management
Management
Projekte

Werdegang

Berufserfahrung von Francisco Lopez

  • 1 Jahr und 8 Monate, Apr. 2013 - Nov. 2014

    Business developer

    Enel Green Power

    Responsible for development of renewable energy projects in El Salvador.

  • 1 Jahr und 4 Monate, Aug. 2011 - Nov. 2012

    Project Manager

    Engineering Company of Central America

    - Management of engineering and consulting projects.

  • 1 Jahr und 6 Monate, Nov. 2008 - Apr. 2010

    Business development manager

    Duke Energy International Guatemala

    - Responsible for developing new projects and upgrading existing generating power facilities in order to increase the company’s income. - Execution of due diligence process and feasibility studies for projects. - Perform the necessary steps to obtain all permits involved in the project implementation including environmental license, permits for the interconnection to the national electrical grid, building permit.

  • 5 Jahre und 4 Monate, Aug. 2003 - Nov. 2008

    Construction manager

    Duke Energy International El Salvador

    - Project’s owner representative responsible for the management of the construction supervision of projects. These projects were constructed by international first class contractors.

  • 5 Monate, März 2003 - Juli 2003

    Operations manager

    Duke Energy International El Salvador

    - Responsible for managing the operation of the power facility called “Planta Arizona”, a 165MW power facility consisting in 10 internal combustion engines (diesel, heavy fuel oil and Orimulsion) manufactured by Wartsila, (18V46 model) and its exhaust gas treatments plants including electrostatic precipitators and emissions absorbers.

  • 1 Jahr und 1 Monat, Feb. 2002 - Feb. 2003

    Construction manager - electrical systems

    Duke Energy International El Salvador

    - Responsible for management of construction supervision of (electrical systems for) a power facility called “Planta Arizona”, a 165MW facility consisting in 10 internal combustion engines (diesel, heavy fuel oil and Orimulsion) manufactured by Wartsila, (18V46 model) and its exhaust gas treatments plants including electrostatic precipitators and emissions absorbers.

  • 1 Jahr und 6 Monate, Aug. 2000 - Jan. 2002

    Electrical maintenance supervisor

    Duke Energy International El Salvador

    - Responsible for administering and supervising the maintenance of electrical, control and automation systems of the power facility called “Acajutla Diesel power plant”, a 150MW power facility consisting in 9 internal combustion engines (diesel and heavy fuel oil) manufactured by Wartsila (18V46 model).

  • 5 Jahre und 2 Monate, Juni 1995 - Juli 2000

    Operations head

    Nejapa Power Company LLC

    - Responsible for operating the electric power facility called “Nejapa Power I”, a 127MW power facility consisting of 17 internal combustion engines manufactured by Wartsila (18V32 model).

Ausbildung von Francisco Lopez

  • 7 Jahre und 4 Monate, Jan. 1991 - Apr. 1998

    Engineering

    Universidad Centroamericana Jose Simeon Cañas

Sprachen

  • Spanisch

    Muttersprache

  • Englisch

    Fließend

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z