
Dipl.-Ing. German Carretie Warleta
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von German Carretie Warleta
- Bis heute 1 Jahr und 11 Monate, seit Sep. 2023
Tecnical Project Manager
AESC Spain
Coordination and management of activities during the Douai and Navalmoral de la mata project development of Engineering Design, Procurement construction and Installation of 2 gigafactories in certain manufacturing areas and be part of the overall activities coordinations. Main focus on project setup phase of Spain Project and installation phase in France project. Key project management areas: • Interface management • communicaton management • scope and change management, • time management • risk management
- 4 Jahre und 3 Monate, Juli 2019 - Sep. 2023
Quality Improvement Specialist
Dragados Offshore
Responsible on management and operative process analysis, providing support through audit, process improvement actions, procedures review. Responsible of projects risk management facilitating the risk identification analysis and mitigation based on ISO 31000 standard. Responsible for coordinate project and corporate knowledge management, mainly by lessons learned. Deployment of project management knowledge based on PMBoK and ISO 21500 concept into the Organisation.
- 5 Jahre und 1 Monat, Sep. 2018 - Sep. 2023
Project Management Engineer
Dragados Offshore
Area of responsabilities: Licensing, Knowledge and Risk Management, on Borwin5 Project Execution (EPCIT). Responsible to support to obtain license, facilitate lessons learned activities and manage the Risk Register and corresponding mitigation actions. Support intial PM activities during tender phase in all project management areas: Resources Mgmt, Time Mgmt, Scope Mgmt, Quality Mgmt, Risk Mgmt, Licences, Permit, Engineering, Construction, ...
- 11 Monate, Sep. 2017 - Juli 2018
Deputy Project Dtr/Mgr
Dragados Offshore
Sited in Erlangen (Germany), my key responsibilities is to the liaison between Siemens AG and Dragados Offshore for developing Dolwin 6 Offshore Platform. Integrated into the Siemens Project team, I have interface with both teams about engineering and project management. I have also participated in regular meetings with the client and other third parties.
- 4 Jahre und 1 Monat, Sep. 2013 - Sep. 2017
Tender Coordinator
Dragados Offshore
Coordinate Technical and Commercial information to be provided into a Tender, including Engineering activities, Procurement, Fabrication , Loadout, Transportation and Installation costs; Timing plan, resources workload reports; comercial conditions.
- 1 Jahr und 9 Monate, Jan. 2012 - Sep. 2013
Process Engineer
Ford Motor Company
Process Engineer in Valencia Engine Plant. Responsible of launch new cylinder head process; coordinate new tooling, upgrade machineries &install/validation of new ones. Under my responsibilities on this position are: define new process for new cylinder heads; process improvement actions based on new model &manufacturing process proposed by Central Office of Manufacturing Engineer; lead acquisitions, acceptance and installation of new equipments and tooling to reach target for new model & incremental demands.
- 6 Jahre und 1 Monat, Okt. 2005 - Okt. 2011
MANUFACTURING PLANNER AND CURRENT PRODUCT DESIGN ENGINEER
Visteon
Forecast mfg. plan; mfg.costs quotes; Design review of product in current production Responsibilities are: engineering change control design for feature enhancements, productivity , support failure analysis, changes mgmt. As business eng., evaluation of investment in resources & mfg. costs. of a new product. Up to date it has issued 114 cost studies, 35 of them earned. Analysis of production capacity in the medium &long term production for a turnover in 2010 of aprox. $ 165 million and 450 people
- 1 Jahr und 2 Monate, Apr. 2004 - Mai 2005
CUSTOMER SERVICE QUALITY ENGINEER
Visteon Automotive Systems
Key contact for customer quality concern, process improvement, in site support, mfg. performance report Key contact with German customers OEM (BMW, VW) in the area of Quality. I had frequent visit to on-site assistance in the factories of BMW and VW for the analysis of potential failures, proposals for process change and coordinate validation and checks. Coordination of functional analysis of returned products: coordination of corrective actions with production equipment and materials.
- 4 Jahre und 10 Monate, Juli 1999 - Apr. 2004
NEW PROCESS ENGINEER
Ford España, Cadiz Electronica
Develop mfg. projects from concept design to mass production for new product: JLR remote crl, Scania remote ctrl. , Scania security ctrl., Ford Headlamp levelling ctrl, Mazda/Ford/Scania immobilizers, Nissan/VW instr. panel, Toll control of tolls for German highway. Projects include designi of the mfg. process, validation process, financial project monitoring, process documentation based on the design information mgmt (BOM, specs, dwgs & design files) and equipment (user manual maintenance) and QHSE stds.
- 3 Jahre und 4 Monate, Apr. 1996 - Juli 1999
SIMULTANEUOUS ENGINEER
Ford
Liaison between the areas of design and manufacturing to develop new products. Between 1996 and 1999 began immobilizer’s projects for various vehicle manufacturers, alarm systems and remote controls, energy management of vehicles, keyless ignition. Responsibilities included the development and manufacturing documentation control projects in central interpretation of design requirements and product quality, initial cost budgeting and investment and manufacturing review of alternatives.
- 4 Jahre und 11 Monate, Juni 1991 - Apr. 1996
Manufacturing Engineer
FORD
Develop procedure, APQP doc of process area in electronics mfg. operations. Lead operation of quality & process improvement, analysis of failures (8D) & manage actions plans for new product 93/96 Supervision & monitoring of improvements in productivity & product quality; Resp. for process changes for new products. Detailed Preparation needed for the manufacture of electronic ctr.. 91/93 Coordinate & lead Production team, 3 shifts. duties: Production schedule, equipment maintenance, planning of training.
- 2 Jahre und 6 Monate, Jan. 1989 - Juni 1991
Ingeniero de Mantenimiento-Robotica
AMPER
Lead maintenance operation in Hybrid assembly area. Coordinate global manufacturing maintenance operations in Amper facilities in Madrid Develop PLC SW for several automations for aplication in & out of Amper. Development, implementation and documentation of robotic applications in various production processes, such as handling electronic components and boards, palletizing or packaging bags and boxes of glasses. Developments in PLC applications consisted of, user interfaces & communications programs.
Ausbildung von German Carretie Warleta
- 10 Monate, Jan. 2014 - Okt. 2014
Universidad Nacional de Educación a Distancia - U.N.E.D.
- 4 Monate, Nov. 2004 - Feb. 2005
...
UCA
- 1 Jahr und 2 Monate, März 2000 - Apr. 2001
Instituto Internacional San Telmo
- 1984 - 1988
Ingeniería Técnica Industrial
EUITI CADIZ
Electrónica Industrial
Sprachen
Spanisch
Muttersprache
Deutsch
Gut
Englisch
Fließend
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.