
Guillaume Alloschery
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Guillaume Alloschery
- Bis heute 12 Jahre und 7 Monate, seit Nov. 2012
Deputy Lead Layout Engineer
EDF
- 4 Jahre und 10 Monate, 2008 - Okt. 2012
Plant Layout and Piping Lead Engineer
AREVA NP SAS
- Coordination of the 3D model activities for the Reactor Building (2 to 6 draftmen), for the development of ATMEA1 power plant - Coordination of internal (project, other disciplines) and external (client, MHI partner) engineering interfaces - Carrying out layout engineering studies (piping, cable trays, HVAC, civil) - Production of engineering deliverables, progress follow-up, reporting
- 1 Jahr und 3 Monate, Apr. 2010 - Juni 2011
Plot Plan Lead Engineer
AREVA NP GmbH
1-year AREVA delegation in Germany - Carrying out Plot Plan activities for Nuclear Power Plant bids - Coordination of interfaces with bid project and other engineering disciplines (construction, systems, safety, civil) - Production of Plot Plan drawings, reports for Bill of Quantities and site excavation works - Promoted to Plot Plan specialist in AREVA NP
- 10 Monate, Mai 2007 - Feb. 2008
Deputy Lead Design Engineer
TEUCHOS (SAFRAN group)
- Coordination of detail design and qualification activities for an electrical thrust reverser actuation system, for a European R&D project - Coordination of 3 suppliers (actuators, motors, test bench): design, delivery - Coordination of components assembly and qualification on the test bench - Production of performance test reports
- 2 Jahre und 5 Monate, Dez. 2004 - Apr. 2007
Deputy Lead Layout Engineer
TEUCHOS (SAFRAN group)
- Coordination of the 3D model activities for the Engine Build-Up (2 draftmen) of the SaM146 aircraft engine - Coordination of 6 components suppliers (pipes, cable trays, equipment): design, qualification, production - Coordination of internal (project, other disciplines) and external (client, suppliers) engineering interfaces - Production of technical specifications for suppliers, verification of suppliers’ output documentation. Management of changes and claims
- 6 Monate, Juni 2004 - Nov. 2004
Trainee, assistant of project engineer
MESSIER-BUGATTI (SAFRAN group)
Coordination of the development of an electro-actuator for aircraft nacelles, and internal follow-up of actuation systems buisnesses for aircraft seats
- 3 Monate, Juni 2002 - Aug. 2002
Trainee, assistant of production engineer
VALEO Electrical Systems
Follow-up of the entry into service of a production line for car alternators, and elaboration of maintenance procedures
Layout
EDF
Ausbildung von Guillaume Alloschery
- 2003 - 2004
(Institut d’Administration des Entreprises
« University of Paris 1 – Panthéon Sorbonne », Paris, France
Project Management
« Ecole Nationale Supérieure d’ARTS ET METIERS », Paris, France
Top 6 French Engineering University, mechanical oriented, conferring a diploma equivalent to 5 years of university level studies
Sprachen
Französisch
Muttersprache
Englisch
Fließend
Deutsch
Gut
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.