
Kurt Coppens
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Kurt Coppens
- Current 15 years and 6 months, since Jan 2011
Supervisor
Hatchtech BV
Supervisor for turn key projects all over the world, existed out: assembling the construction build new water system build electrical end electronic system build high pressure cleaning system build computerised ventilation system test, commissioning and contract hand over from the project. aftersales. this wed do all over the world
- Current 16 years and 3 months, since Apr 2010
Electrical Engineer
CC yapi/ Vincotte Middle East L.L.C.
- Hayan Petroleum Company (HPC): Jihar Development Project Site Jihar – Palmyra – Syria. Employed as a third party electrical inspector. Inspections of :( installation, material check, pre-commission, walk dawn and startup). o MCC: Main control room (from Mv 6.6KV to Lv 0.4Kv). o UPR Room: Battery room (LV 24V – 110V – 0.4Kv/200hp). o Cathodic protection from vessel. o Cathodic protection on flow line. o The underground earthing cables. o Switchboard installation. o the Conduit installation o the
- 3 years and 8 months, Feb 2006 - Sep 2009
Mechanical Assembling Supervisor/ Project leader
HATCHTECH İNCUBATİON TECHNOLOGY
Job description Hatch Tech For foreign country: - Alfra Germany (Leipzich) - Last 6 months of the turn-key hatchery existed out 3 months testing and commissioning startup + singing contracts and 3 months after sales. - The alfra hatchery is a 5000sqm semi-automatic industrial plant that provide 1.6 mlj chicks a week o Build soft water system with chemicals. This is a fully automatic system controlled by plc and supervised by scada. o Connecting low voltage alarm. o Set up an overall control syste
- 8 years and 1 month, Jan 1998 - Jan 2006
Coordinator
NS Holland
First 5 years In a group of 4 persons conducting maintenance work on the rail network as a Forman existed out - replace rails - execute new railroad system - replace and restore of switch - Replace and restore of the overhead wire. - Replace, restore and align of the power guides - All additional earthworks Last 3 years After promotion, managing personnel and equipment for proper handling of the rail network system
- 7 years and 11 months, Mar 1990 - Jan 1998
Construction Control Chief
Verstraten-Verbrugge
Job description Verstraeten – Verbrugge: Lead a group of workers ± 12p to perform asbestos removal Control toxic dust Control environment for asbestos Responsible for time frame Responsible for the removal of asbestos under the control Of the ministry.
Ausbildung von Kurt Coppens
- 2 years and 9 months, Oct 1989 - Jun 1992
Civil engineer: direction electrical/electro mechanics
Univerity Gent
- 4 years and 11 months, Sep 1984 - Jul 1989
Electrical/electonics
HTISA belgium
Sprachen
English
C1 (Fließend)
German
B1-B2 (Gute Kenntnisse)
French
B1-B2 (Gute Kenntnisse)
Dutch
C2 (Verhandlungssicher / Muttersprachlich)
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.
