
Marek Wozny
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Marek Wozny
Involved in various Mod5 to 800xA migration projects like: • Synthetic Rubber plant control system upgrade, Schkopau, Germany • Emulsion Polymer plants in USA (Midland, MI), Korea (Ulsan), Germany (Rheinmuenster), Hamina (Finland) In fulfilling these assignments, Following systems have been used: • ABB Industrial IT 800xA with AC800M * ABB Batch Manager
- 1 Jahr und 4 Monate, Nov. 2016 - Feb. 2018
I&C Commissioning Engineer
Burmeister & Wain Scandinavian Contractor
Hot and cold commissioning of the DCS based on 800xA v6, ABB AC800M & AC800HI Snetterton biomass power plant - UK Widnes biomass power plant - UK
- 8 Monate, März 2015 - Okt. 2015
Control System Engineer in Alstom Service Department - Contractor
Alstom Power Switzerland
Preparation of the new improvements for commercial Power Plants. Designing of the control algorithms based on ABB / Alstom Control systems like : 800xA Advant Master (AC400 series, AC160 Series) / Alspa6 Controgas. Writing filed service instructions. Site support of the commissioning engineers during implementation faze.
- 1 Jahr und 8 Monate, Aug. 2012 - März 2014
Control System Engineer in Gas Turbine Development - Contractor
Alstom Power Switzerland
Responsible for programming new developments of the Gas Turbines, testing new functionalities on the HIL, preparing documentations, graphic displays and user manuals. • Creating and testing new control algorithms in Alspa 6 ControGas environment • Testing and result validation • Developments of the new tools to support engineering and programming control algorithms
- 1 Jahr und 10 Monate, Apr. 2010 - Jan. 2012
I&C Commissioning Engineer - Contractor
Alstom Power Switzerland
Responsible for Hot and Cold commissioning of the Gas and Steam turbines. • Pembroke Power Station / Wales Hot and cold commissioning of the Steam Turbine based on ABB control systems: Advant 160, AC800M, PPA 800xA • SOTO de Ribera 5 Power Plant / Spain Hot and cold commissioning of the Gas Turbine (KA26-1) based on ABB control systems: Advant 160, AC800M, PPA 800xA
- 4 Jahre und 5 Monate, Jan. 2006 - Mai 2010
Control Systems Engineer
ABB Switzerland
Project Engineer in the Engineering department of Power Generation. Involved in software engineering, factory testing and commissioning of various applications for: • Gas Turbine Spain (Soto de Ribera) • BOP Kuwait (Az Zour) • Combined cycle plants in England (Grain) In fulfilling these assignments, following systems have been used: • ABB Industrial IT 800xA with AC800M • ABB Advant AC160 and AC450
Ausbildung von Marek Wozny
- 4 Jahre und 10 Monate, Sep. 2001 - Juni 2006
Computer based Control Systems
Wrocław University of Technology
Master of Science with major in Automatic Control
- 4 Jahre und 10 Monate, Sep. 2001 - Juni 2006
Computer based Control Systems
Wrocław University of Technology
Sprachen
Polnisch
Muttersprache
Englisch
Fließend
Deutsch
Gut
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.