Marjaneh Hashemi

Angestellt, Instrumentation and Control Engineer, Namvaran P&T
Tehran, Tehran Province, Iran, Iran (Islamische Republik )

Fähigkeiten und Kenntnisse

Engineering
Industrial Instrumentation
AutoCAD
EPC
Transmitter
PSV
PSV Sizing
Control Valve
Piping and Instrumentation Drawing (P&ID)
Pressure
Water treatment plants
Valves
Waste Water Treatmen
pumpstations
Chemical Packages
petrochemical plants
oil
Gas
Oriffice
Daniel Orifice Flow Calculator

Werdegang

Berufserfahrung von Marjaneh Hashemi

  • Bis heute 3 Jahre und 3 Monate, seit Mai 2022

    Instrumentation and Control Engineer

    Namvaran P&T

    Project: MOKRAN PETRO REFINERY Refinery’s Feed and Products Storage Tanks In Process configuration of this project as a Petro Refinery Complex, an oil refinery with high complexity index, a petrochemical complex including olefin unit, aromatic extraction unit and other downstream units which are required for re-processing the olefin unit intermediate products and also all required off-sites and utilities services are considered.

  • 7 Monate, Nov. 2021 - Mai 2022

    Instrumentation and Control Engineer

    JONDISHAPOUR Co.

    ARDESTAN-DEHSHIR GAS COMPRESSOR STATION ON IGAT-VIII PIPELINE EPC PROJECT Review and Completion of detail design and preparation of EPC tender documents for Ardestan/Dehshir gas compressor stations.

  • 4 Jahre und 3 Monate, Sep. 2017 - Nov. 2021

    Instrumentation and Control Engineer

    ABSUN Zolal Eng. Co.

    Projects: Treatment and Recovery of high TDS Water Plant-Shazand (IKORC) (EPC). NGL_OIEC_Desalinated & demineralized Package_99(EPC) NGL_OIEC_ Condensate Deoiling Package_99(EPC) Azarab_DM Water Package_99(EPC) Waste Water Treatment Plant of Bid Boland Gas Refinery (EPC) Mobarakeh Steel Complex Water Treatment Plant (EPC) Pars Oil and Gas Company, Water Treatment and Potable Water Package- Onshore Facilities

  • 1 Jahr und 1 Monat, Sep. 2016 - Sep. 2017

    Instrumentation and Control Engineer

    AVE GROUP

    Project: Azar Oil Field Development Central Processing Facilities The plant has been designed to develop AZAR oil field including a Central Processing Facilities (CPF) which is a production unit. The PROJECT scope of work is limited to engineering, procurement, construction and commissioning of CPF battery limits in addition with relevant interfaces.

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z