Mehran Mousapoor

is researching.

Angestellt, Sales Agent, HKB Boiler Solution
Teheran, Iran, Islamic Republic of

Fähigkeiten und Kenntnisse

• Schreiben Buch mit Titel „300 Stufen zu entwerfe
• Thermodynamische Auslegung des D-Wasserrohrkesse
• Thermodynamische Auslegung von Economizer
• Thermodynamische Auslegung Hitzer
• Wasserrohrkessel Design by Fire Cad WTPB
• Druckbehälter Design durch PV Elite 2016
• Dampfanlagendesign von Thermoflow ver. 20
• Regelventil Select & Produce Datenblatt von Fish
• PSV Sizing von VALVEProgramm WENIG Co. nach API-
• Elektroheizung Verfolgung durch 3EPlus4
• Detailliertes Verständnis und Kenntnis der inter

Werdegang

Berufserfahrung von Mehran Mousapoor

  • Current 5 years and 8 months, since Oct 2020

    Sales Agent

    HKB Boiler Solution

  • Current 7 years and 9 months, since Sep 2018

    Project Expeditor & Change & Claim Analyst

    PERSIAN GULF BID BOLAND GAS TREATING PLANT

    Project Title: Persian Gulf Bid Boland gas treating plant II Responsibility: Checking out project changes, analyzing change’s commercial effects and holding meeting with vendors. Project Title: Persian Gulf Bid Boland Flares Gathering Responsibility: Project expeditor for Gathering of 2nd Stage Excess Gas in Gachsaran I & II Production Units

  • 6 months, Jan 2018 - Jun 2018

    Project Engineer

    KAVEH MOBADEL CO. (TEHRAN / IRAN)

    Project Title: 25860 M3 fuel storage tank for 2x500 MW HERIS combined cycle power plant Project Title: EPC project for 28 no. shell & tube heat exchanger of Abadan refinery upgrading project Project Title: Construction of 20 tons’ steel structure of Novargi co.

  • 10 months, Mar 2017 - Dec 2017

    Senior Project Engineer

    AZARAB INDUSTRY CO. (TEHRAN / IRAN)

    Project Title: Steam plant of phase 22 & 24 refinery at south pars of Iran. (6x160 ton/hr, 16 barg, 380˚C water tube boilers) Project Title: Steam plant of Siraf methanol refinery at south pars of Iran. (3x110 ton/hr, 54 barg, 415 ˚c water tube boilers) Project Title: Steam plant of Gachsaran petrochemical at Gachsaran, Iran. (4x145 ton/hr, 11 barg, 420 ˚c water tube boilers)

  • 7 months, Sep 2016 - Mar 2017

    Start Up Supervisor

    SUPERAKTIVE CO (TEHRAN / IRAN)

    Project Title: Steam plant of phase 22 & 24 south pars of Iran. (4x32 ton/hr, 12 barg, 250 ˚c fire tube boilers) Responsibility: Supervising field erection activity and preparing remain tasks and make schedule for remains activity. Inspecting all devices installation and wiring. Doing pre-commissioning and commissioning operation. I hand over project at 100% of progress.

  • 7 months, Mar 2016 - Sep 2016

    Site Manager

    ALIS NATIONAL PETROLEUM INVESTMENT (BASRA / IRAK)

    Project Title: Steam plant of Basrah petrochemical co. (2x145 ton/hr, 40 barg, 380 ˚c water tube boilers) Responsibility: Supervising erection activity in site and leading 24 persons including staffs and labors. Participating in client’s meeting and reporting erection report weekly. I hand over project at 100% of progress.

  • 5 months, Nov 2015 - Mar 2016

    Site (BOP) Mechanic Supervisor

    SUNIR (KIRKUK / IRAK)

    Project Title: 2x160 MW Siemens gas turbine, Dibis power plant. Responsibility: Supervising mechanical activity of all equipment. Inspected all mechanical erection activities and sending inspection report to client for approval. Participating in client’s meeting and reporting erection report weekly. We leave site because Iraq’s internal wars with ISIS.

  • 9 months, Mar 2015 - Nov 2015

    Site Erection Supervisor

    ALIS NATIONAL PETROLEUM INVESTMENT (BASRA / IRAK)

    Project Title: Steam plant of Basrah petrochemical co. (2x145 ton/hr, 40 barg, 380 ˚c water tube boilers) Responsibility: EPC project handover to me at 55% of progress and I have certification for supervising of erection activity from NPJ International Co. (Canadian company) and I performed as supervisor for all erection and installation activities in mechanical, instrument, electrical and piping disciplines.

  • 9 months, Jun 2014 - Feb 2015

    Engineering consultant

    SUNIR (MAYSAN / IRAK)

    Project Title: Al-Amarah cane sugar factory’s power generation plant. Responsibility: I was manager and I lead 6 engineers for collecting of existing site data and issuing survey report for 12 MW power generation plant.

  • 1 year and 3 months, Mar 2013 - May 2014

    Project Coordinator

    RAMPCO BOILER (TEHRAN/IRAN)

    Project Title: Steam plant of Kordestan petrochemical co. (2x30 ton/hr, 42 barg, 420 ˚c water tube boilers) Responsibility: I joined project at 20% of progress and I coordinated for hiring of erection’s contractor at site. I followed-up issuing of remain engineering’s documents and I sent all fabricated materials to site for installation. I started project and handed over project in one year.

  • 1 year and 2 months, Feb 2012 - Mar 2013

    Project Engineer

    RAMPCO BOILER (TEHRAN/IRAN)

    Project Title: Steam plant of Hengam gas treatment refinery. (4x40 ton/hr, 21 barg, 250 ˚c water tube boilers) Responsibility: I coordinated project between engineering and procurement department, shop and field erection group to follow project schedule. I held project internal meetings.

  • 1 year and 2 months, Jan 2011 - Feb 2012

    Engineering Coordinator

    RAMPCO BOILER (TEHRAN / IRAN)

    Project Title: Steam plant of Sarakhs gas treatment plant. (1x120 ton/hr, 38 barg, 380 ˚c water tube boiler) Responsibility: I coordinated engineering activity and followed-up to be on schedule.

  • 1 year and 1 month, Jan 2010 - Jan 2011

    Senior Engineering

    RAMPCO BOILER (TEHRAN / IRAN)

    Project Title: Steam plant of Kermanshah petrochemical co. (1x75 ton/hr, 42 barg, 420 ˚c water tube boiler) Responsibility: I generated mechanical and process documents and drawings.

  • 1 year and 8 months, Jun 2008 - Jan 2010

    Junior Engineer

    NPJ INTERNATIONAL CO. (TEHRAN / IRAN)

    Project Title: Steam plant of Morvarid petrochemical co. (1x60 & 2x35 ton/hr, 42 barg, 420 ˚c water tube boilers) Responsibility: I was fresh engineer and I was draft man for mechanical and process documents and drawings. As parallel activity inside company, I prepared bid documents.

Ausbildung von Mehran Mousapoor

  • 1 month, Jun 2014 - Jun 2014

    Operation research for decision optimizations in Oil, Gas, Petrochemical

    Der Neue Wunsch University

  • 1 month, Jun 2014 - Jun 2014

    Operation research for decision optimizations in Oil, Gas, Petrochemical

    Harvard University

  • 1 month, Jun 2014 - Jun 2014

    Operation research for decision optimizations in Oil, Gas, Petrochemical

    LLC- Academy

  • 1 month, Jun 2014 - Jun 2014

    Operation research for decision optimizations in Oil, Gas, Petrochemical

    Iranian operations research committee

  • 5 years, Sep 2004 - Aug 2009

    Bachelor of mechanical engineering

    Mohaghegh Ardebili University, Ardebil, Iran

Sprachen

  • English

    C1 (Fließend)

  • German

    C1 (Fließend)

  • Persian Native

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z