
Mitesh Parekh
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Mitesh Parekh
- Bis heute 5 Jahre und 9 Monate, seit Feb. 2020
Automation Engineer
Autefa Solutions Germany GmbH
Commissioning/assembly of Non woven, Technical textile Machines. Serel and WMS system.. Geo-textile, Non-Woven, POY/FDY machines, Spunlace non-woven line, Staple fiber line. Completed several projects in ASIA, Europe & USA, Latin American countries.
- 7 Jahre und 5 Monate, Sep. 2012 - Jan. 2020
Project Engineer
KNEO Automation Pvt Ltd
Erection and Commissioning of Integrated Automation Plant machines for Non Woven and Staple Fiber Plants.Verification and Testing of Supplied parts at Customer end, Completion of Erection and Commissioning activity within time frame.Erection and Commissioning of Integrated Automation Plant machines for Non Woven and Staple Fiber Plants.Verification and Testing of Supplied parts at Customer end, Completion of Erection and Commissioning activity within time frame.
- 1 Jahr und 5 Monate, Apr. 2011 - Aug. 2012
Maintenance Engineer
Exeed Industries (Geotextile LLC)
Operation & Maintenance of all Electrical & Instrumentation equipment, PCC, MCC, Controller, Siemens S7 PLC, Utility System, Air compressor, Screw Chillers, Steam Boilers, AHU, FCU and HVAC Units,firefighting equipment, ERP package for Inventory control & spare parts management and Implementing of ISO and EHSactivities, SAP and SOP, Knowledge in testing of different instruments- on/off valve, pressure transmitter, temperature transmitter,flow meter, control valve, analyzer, pressure regulating valve, etc.
- 1 Jahr und 7 Monate, Nov. 2009 - Mai 2011
Project Engineer
Sumeet Industries Ltd
Erection & Commissioning, Maintenance of all electrical equipment’s for Continuous Plant of Petrochemical Plant. (PTA based chips, Fully Draw Yarn (FDY) & POY Line), WHRB and VAC unit installation. GASbase Power plant 18MW, Deutz (MWM) engine. Erection and Commissioning of 11/3.3 KV Transformer and UG Distribution feeder. Pre. and breakdown Maint. of MCC, PMCC, Air CB, Inverter (Siemens, Yaskawa, Danfoss), VAM/VAC, Centrifugal Compressor. Energy conservation optimization in Lighting and process Electrical
- 2 Jahre und 4 Monate, Aug. 2007 - Nov. 2009
Engineering Assistant
Century Enka Ltd (BK Birla Group of Companies)
Experienced Power Plant Operations & Maintenance Engineer with expertise in managing a 16 MW Furnace Oil-based CPP (Wärtsilä & Škoda engines), operating and maintaining 132/11 kV switchyards, and handling SCADA/PLC-based control systems. Skilled in inverter and UPS systems (SIEMENS, AMTECH, Tata Liebert), motor maintenance (HT/LT up to 820 kW), and electrical protection equipment. Proficient in preventive maintenance, load management, spares inventory control, and daily power generation reporting.
- 2 Jahre, Aug. 2005 - Juli 2007
Plant Supervisor
Godrej Agrovet Ltd (Subsidiary of Godrej Ltd)
Skilled in operating and maintaining agricultural and animal feed plant equipment, including mixers, grinders, conveyors, pelletizers, and packing machines. Experienced in boiler operations (Thermax Non-IBR) and commissioning of IBR boilers with government liaisoning. Proficient in daily production reporting, product formulation, and preventive/breakdown maintenance of MCCs, ACBs, compressors, and boilers as per ISO 9001:2000 standards.
Sprachen
Englisch
Fließend
Gujarati
Muttersprache
Hindi
Muttersprache
Marathi
Gut
Deutsch
Gut
Spanisch
Grundlagen
Italienisch
Grundlagen
Chinesisch
Grundlagen
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.