Moein Ghassemi

Angestellt, Senior Electrical Engineer, Randeman

Abschluss: Master of Science, Sharif University of Technology

Tehran, Iran (Islamische Republik )

Über mich

Led cross-functional teams in delivering engineering solutions, leveraging CAD Software, Design Thinking, Team Leadership and Data Analysis; achieved over 11 years with 30+ successful projects, surpassing client expectations and fueling revenue growth.

Fähigkeiten und Kenntnisse

Project Management
Consulting
Team work
ETAP
Relay Setting
Data Center Infrastructure Design
Revit
AutoCAD

Werdegang

Berufserfahrung von Moein Ghassemi

  • Bis heute 2 Jahre und 10 Monate, seit Dez. 2021

    Senior Electrical Engineer

    Randeman

    - Led engineering design teams including 10 engineers. - Orchestrated the successful implementation of Tier III MEP installations for the Tourism Bank Main Datacenter & the Mellat Bank Main Datacenter projects. - Tender Bid and Commercial Evaluation (TBE & CBE) for 5 low current and security systems in Mobin Hotel project in Karbala, Iraq. - Developed tenders for 4 datacenter projects serving cell phone operators. - Trained a team of 10 engineers in Revit modeling of Electrical & Mechanical installations.

  • 9 Monate, Juni 2023 - Feb. 2024

    Head of Engineering

    Parsis Zarmehr Kish

    - Led MEP engineering design team including 15 engineers for 70,000 m2 area; issued MEP design package and performed FAT procedure for 10+ MEP equipment. - Led cost optimization strategy, delivering 60% reduction in power cable procurement budget. - Directed coordination of design and shop meetings within 1 week time period alongside workshop sessions, optimizing execution processes and improving construction efficiency in time and budget planning.

  • 5 Jahre und 1 Monat, Sep. 2017 - Sep. 2022

    Senior Design Engineer

    Niroo Consulting Engineers

    - Created design documents of 10MW emergency electrical substation of datacenter of central bank of Iran based on Revit 3D model, increasing precision in construction and material take-off. - Spearheaded electrical execution in high-stakes live datacenter environment; resulting in 0 incidents and enhancing operational efficiency within 24/7 service framework.

  • 7 Jahre und 1 Monat, Mai 2015 - Mai 2022

    Electrical Design Engineer

    Kayson

    - Design Engineer in Iran Mall mega project with area of 1,200,000 m2 and 700 retails. - Detail designed 20+ electrical substations including 110+ power transformers (20/0.4 & 20/10 KV) with 90 MW electrical demand, relay setting of MV & LV networks with ETAP, 35 MW emergency power plant and 1.5MW IT load datacenter in Iran Mall project. - Headed MEP tender cost estimation team for Camp Guezo Residential Complex in Benin, Africa, delivering one of the top 3 proposals.

  • 10 Monate, Juni 2021 - März 2022

    Senior Electrical Engineer

    Taban Tablo

    - Led knowledge transfer process from Driescher Co. resulting in manufacturing 20kV power panels.

  • 1 Jahr und 3 Monate, Apr. 2020 - Juni 2021

    Electrical Supervisor

    Kayson Oil & Gas Co. (KOGC)

    - Electrical supervisor in Jask Crude Oil Tanks with capacity of 10 million barrels. - Achieved more than 85% progress in electrical installation engineering document of the EPC project. - Conducted redesigning power network resulting in 11% power cable procurement budget reduction.

  • 10 Monate, Mai 2018 - Feb. 2019

    MEP Coordinator

    Flexenclosure

    - Directed MEP design team for Muscat Prefabricated Datacenter Project (MC1) in 3 phases of construction, adjusting client Basis of Design to project requirements; ensured project met budget & timeline constraints. - Delivered detailed design documents in collaboration with COWI, adhering to Equinix Global Design Standard and endorsed by Arup in 10+ weekly design review meetings. - Crafted detailed design in Revit, improving modular datacenter fabrication at Flexenclosure factory.

  • 9 Monate, Apr. 2018 - Dez. 2018

    MEP Coordinator

    Flexenclosure

    - Coordinated MEP design team in Zurich Modular Datacenter Project (ZH5) in client’s 3 phase construction strategy. - Created detailed design documents with WSP, following Equinix Global Design Standard, endorsed by Arup; ensured alignment with project requirements and industry best practices for efficient implementation and client approval. - Engineered Revit based 3D model, optimizing construction process on site.

Ausbildung von Moein Ghassemi

  • 1 Jahr und 10 Monate, Sep. 2012 - Juni 2014

    Electrical Engineering

    Sharif University of Technology

  • 3 Jahre und 10 Monate, Sep. 2008 - Juni 2012

    Electrical Engineering

    Sharif University of Technology

Sprachen

  • Deutsch

    Grundlagen

  • Englisch

    Fließend

Interessen

Sports
Music
Reading
Psychology
Movies

21 Mio. XING Mitglieder, von A bis Z